(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
High density braid shielding suitable for wiring of electrical and electronic equipment subject to UL (AWM)/cUL (CSA)/NFPA (70/79) standards.
[Features]
· Uses UL (AWM), cUL (CSA), and NFPA (70/79) standards.
· Flame retardancy is UL: VW-1, CL2, CL3, cUL (CSA): FT1/FT2..
· High-density braid shielding.
Part Number | Price | Name | Minimum Order Qty. | Volume Discount | Days to Ship | Overall Length (m) | AWG size (AWG) | Number Of Cores (Core) | Logarithm | Finished outer diameter (mm) | Properties | Conductor configuration (Units/mm) | Insulation body outer diameter (mm) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
฿ 330.92 | CABLE | 1 Piece(s) | 3 Day(s) | 1 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 540.79 | CABLE | 1 Piece(s) | 3 Day(s) | 2 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 750.64 | CABLE | 1 Piece(s) | 3 Day(s) | 3 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 960.50 | CABLE | 1 Piece(s) | 3 Day(s) | 4 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 1,170.37 | CABLE | 1 Piece(s) | 3 Day(s) | 5 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 1,380.22 | CABLE | 1 Piece(s) | 3 Day(s) | 6 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 1,590.08 | CABLE | 1 Piece(s) | 3 Day(s) | 7 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 1,799.95 | CABLE | 1 Piece(s) | 3 Day(s) | 8 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 2,009.81 | CABLE | 1 Piece(s) | 3 Day(s) | 9 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 2,219.67 | CABLE | 1 Piece(s) | 3 Day(s) | 10 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 2,429.53 | CABLE | 1 Piece(s) | 3 Day(s) | 11 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 2,639.39 | CABLE | 1 Piece(s) | 3 Day(s) | 12 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 2,849.25 | CABLE | 1 Piece(s) | 3 Day(s) | 13 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 3,059.11 | CABLE | 1 Piece(s) | 3 Day(s) | 14 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 3,268.97 | CABLE | 1 Piece(s) | 3 Day(s) | 15 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 3,478.84 | CABLE | 1 Piece(s) | 3 Day(s) | 16 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 3,688.69 | CABLE | 1 Piece(s) | 3 Day(s) | 17 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 3,898.56 | CABLE | 1 Piece(s) | 3 Day(s) | 18 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 4,108.42 | CABLE | 1 Piece(s) | 3 Day(s) | 19 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 4,318.27 | CABLE | 1 Piece(s) | 3 Day(s) | 20 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 4,528.14 | CABLE | 1 Piece(s) | 3 Day(s) | 21 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 4,738.00 | CABLE | 1 Piece(s) | 3 Day(s) | 22 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 4,947.86 | CABLE | 1 Piece(s) | 3 Day(s) | 23 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 5,157.72 | CABLE | 1 Piece(s) | 3 Day(s) | 24 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 5,367.58 | CABLE | 1 Piece(s) | 3 Day(s) | 25 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 5,577.45 | CABLE | 1 Piece(s) | 3 Day(s) | 26 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 5,787.30 | CABLE | 1 Piece(s) | 3 Day(s) | 27 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 5,997.16 | CABLE | 1 Piece(s) | 3 Day(s) | 28 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 6,207.03 | CABLE | 1 Piece(s) | 3 Day(s) | 29 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 6,416.89 | CABLE | 1 Piece(s) | 3 Day(s) | 30 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 6,626.74 | CABLE | 1 Piece(s) | 3 Day(s) | 31 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 6,836.61 | CABLE | 1 Piece(s) | 3 Day(s) | 32 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 7,046.47 | CABLE | 1 Piece(s) | 3 Day(s) | 33 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 7,256.32 | CABLE | 1 Piece(s) | 3 Day(s) | 34 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 7,466.19 | CABLE | 1 Piece(s) | 3 Day(s) | 35 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 7,676.05 | CABLE | 1 Piece(s) | 3 Day(s) | 36 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 7,885.92 | CABLE | 1 Piece(s) | 3 Day(s) | 37 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 8,095.77 | CABLE | 1 Piece(s) | 3 Day(s) | 38 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 8,305.63 | CABLE | 1 Piece(s) | 3 Day(s) | 39 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 8,515.50 | CABLE | 1 Piece(s) | 3 Day(s) | 40 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 8,725.35 | CABLE | 1 Piece(s) | 3 Day(s) | 41 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 8,935.21 | CABLE | 1 Piece(s) | 3 Day(s) | 42 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 9,145.08 | CABLE | 1 Piece(s) | 3 Day(s) | 43 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 9,354.94 | CABLE | 1 Piece(s) | 3 Day(s) | 44 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 9,564.80 | CABLE | 1 Piece(s) | 3 Day(s) | 45 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 9,774.66 | CABLE | 1 Piece(s) | 3 Day(s) | 46 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 9,984.52 | CABLE | 1 Piece(s) | 3 Day(s) | 47 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 10,194.38 | CABLE | 1 Piece(s) | 3 Day(s) | 48 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 10,404.24 | CABLE | 1 Piece(s) | 3 Day(s) | 49 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 9,347.70 | CABLE | 1 Piece(s) | 3 Day(s) | 50 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 9,532.23 | CABLE | 1 Piece(s) | 3 Day(s) | 51 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 9,716.76 | CABLE | 1 Piece(s) | 3 Day(s) | 52 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 9,901.30 | CABLE | 1 Piece(s) | 3 Day(s) | 53 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 10,085.84 | CABLE | 1 Piece(s) | 3 Day(s) | 54 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 10,270.37 | CABLE | 1 Piece(s) | 3 Day(s) | 55 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 10,454.90 | CABLE | 1 Piece(s) | 3 Day(s) | 56 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 10,639.43 | CABLE | 1 Piece(s) | 3 Day(s) | 57 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 10,823.97 | CABLE | 1 Piece(s) | 3 Day(s) | 58 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 11,008.50 | CABLE | 1 Piece(s) | 3 Day(s) | 59 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 11,193.03 | CABLE | 1 Piece(s) | 3 Day(s) | 60 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 11,377.56 | CABLE | 1 Piece(s) | 3 Day(s) | 61 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 11,562.10 | CABLE | 1 Piece(s) | 3 Day(s) | 62 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 11,746.63 | CABLE | 1 Piece(s) | 3 Day(s) | 63 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 11,931.16 | CABLE | 1 Piece(s) | 3 Day(s) | 64 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 12,115.69 | CABLE | 1 Piece(s) | 3 Day(s) | 65 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 12,300.22 | CABLE | 1 Piece(s) | 3 Day(s) | 66 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 12,484.76 | CABLE | 1 Piece(s) | 3 Day(s) | 67 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 12,669.29 | CABLE | 1 Piece(s) | 3 Day(s) | 68 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 12,853.82 | CABLE | 1 Piece(s) | 3 Day(s) | 69 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 13,038.35 | CABLE | 1 Piece(s) | 3 Day(s) | 70 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 13,222.89 | CABLE | 1 Piece(s) | 3 Day(s) | 71 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 13,407.42 | CABLE | 1 Piece(s) | 3 Day(s) | 72 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 13,591.96 | CABLE | 1 Piece(s) | 3 Day(s) | 73 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 13,776.49 | CABLE | 1 Piece(s) | 3 Day(s) | 74 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 13,961.03 | CABLE | 1 Piece(s) | 3 Day(s) | 75 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 14,145.56 | CABLE | 1 Piece(s) | 3 Day(s) | 76 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 14,330.09 | CABLE | 1 Piece(s) | 3 Day(s) | 77 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 14,514.62 | CABLE | 1 Piece(s) | 3 Day(s) | 78 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 14,699.15 | CABLE | 1 Piece(s) | 3 Day(s) | 79 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 14,883.69 | CABLE | 1 Piece(s) | 3 Day(s) | 80 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 15,068.22 | CABLE | 1 Piece(s) | 3 Day(s) | 81 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 15,252.75 | CABLE | 1 Piece(s) | 3 Day(s) | 82 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 15,437.28 | CABLE | 1 Piece(s) | 3 Day(s) | 83 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 15,621.82 | CABLE | 1 Piece(s) | 3 Day(s) | 84 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 15,806.35 | CABLE | 1 Piece(s) | 3 Day(s) | 85 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 15,990.88 | CABLE | 1 Piece(s) | 3 Day(s) | 86 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 16,175.41 | CABLE | 1 Piece(s) | 3 Day(s) | 87 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 16,359.94 | CABLE | 1 Piece(s) | 3 Day(s) | 88 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 16,544.48 | CABLE | 1 Piece(s) | 3 Day(s) | 89 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 16,729.01 | CABLE | 1 Piece(s) | 3 Day(s) | 90 | 20 | - | 4P | 9.6 | Heat-Resistance | 21/0.18 | 1.67 |
Loading...
Rated Voltage | 300V | Shield | Available | Representative Standard | UL / CSA(c-UL) |
---|---|---|---|---|---|
Sheath (outer coating) color | Black | Sheath (outer coating) material | PVC (Polyvinyl Chloride) | Insulation body materials | PVC (Polyvinyl Chloride) |
How can we improve?
How can we improve?