(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
Suitable for wiring of electrical and electronic equipment subject to UL (AWM)/cUL (CSA)/NFPA (70/79) standards (unshielded type).
[Features]
· Uses UL (AWM), cUL (CSA), and NFPA (70/79) standards.
· Flame retardancy is UL: VW-1, CL2, CL3, cUL (CSA): FT1/FT2..
· High-density braid shielding.
Part Number | Price | Name | Minimum Order Qty. | Volume Discount | Days to Ship | Overall Length (m) | AWG size (AWG) | Number Of Cores (Core) | Logarithm | Finished outer diameter (mm) | Properties | Conductor configuration (Units/mm) | Insulation body outer diameter (mm) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
฿ 379.77 | CABLE | 1 Piece(s) | 3 Day(s) | 1 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 638.48 | CABLE | 1 Piece(s) | 3 Day(s) | 2 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 897.18 | CABLE | 1 Piece(s) | 3 Day(s) | 3 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 1,155.89 | CABLE | 1 Piece(s) | 3 Day(s) | 4 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 1,414.60 | CABLE | 1 Piece(s) | 3 Day(s) | 5 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 1,673.30 | CABLE | 1 Piece(s) | 3 Day(s) | 6 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 1,932.01 | CABLE | 1 Piece(s) | 3 Day(s) | 7 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 2,190.72 | CABLE | 1 Piece(s) | 3 Day(s) | 8 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 2,449.43 | CABLE | 1 Piece(s) | 3 Day(s) | 9 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 2,708.13 | CABLE | 1 Piece(s) | 3 Day(s) | 10 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 2,966.85 | CABLE | 1 Piece(s) | 3 Day(s) | 11 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 3,225.56 | CABLE | 1 Piece(s) | 3 Day(s) | 12 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 3,484.27 | CABLE | 1 Piece(s) | 3 Day(s) | 13 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 3,742.97 | CABLE | 1 Piece(s) | 3 Day(s) | 14 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 4,001.68 | CABLE | 1 Piece(s) | 3 Day(s) | 15 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 4,260.39 | CABLE | 1 Piece(s) | 3 Day(s) | 16 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 4,519.09 | CABLE | 1 Piece(s) | 3 Day(s) | 17 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 4,777.80 | CABLE | 1 Piece(s) | 3 Day(s) | 18 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 5,036.51 | CABLE | 1 Piece(s) | 3 Day(s) | 19 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 5,295.21 | CABLE | 1 Piece(s) | 3 Day(s) | 20 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 5,553.92 | CABLE | 1 Piece(s) | 3 Day(s) | 21 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 5,812.63 | CABLE | 1 Piece(s) | 3 Day(s) | 22 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 6,071.34 | CABLE | 1 Piece(s) | 3 Day(s) | 23 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 6,330.04 | CABLE | 1 Piece(s) | 3 Day(s) | 24 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 6,588.75 | CABLE | 1 Piece(s) | 3 Day(s) | 25 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 6,847.46 | CABLE | 1 Piece(s) | 3 Day(s) | 26 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 7,106.18 | CABLE | 1 Piece(s) | 3 Day(s) | 27 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 7,364.88 | CABLE | 1 Piece(s) | 3 Day(s) | 28 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 7,623.59 | CABLE | 1 Piece(s) | 3 Day(s) | 29 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 7,882.30 | CABLE | 1 Piece(s) | 3 Day(s) | 30 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 8,141.00 | CABLE | 1 Piece(s) | 3 Day(s) | 31 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 8,399.71 | CABLE | 1 Piece(s) | 3 Day(s) | 32 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 8,658.42 | CABLE | 1 Piece(s) | 3 Day(s) | 33 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 8,917.13 | CABLE | 1 Piece(s) | 3 Day(s) | 34 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 9,175.83 | CABLE | 1 Piece(s) | 3 Day(s) | 35 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 9,434.54 | CABLE | 1 Piece(s) | 3 Day(s) | 36 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 9,693.25 | CABLE | 1 Piece(s) | 3 Day(s) | 37 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 9,951.95 | CABLE | 1 Piece(s) | 3 Day(s) | 38 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 10,210.66 | CABLE | 1 Piece(s) | 3 Day(s) | 39 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 10,469.37 | CABLE | 1 Piece(s) | 3 Day(s) | 40 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 10,728.08 | CABLE | 1 Piece(s) | 3 Day(s) | 41 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 10,986.78 | CABLE | 1 Piece(s) | 3 Day(s) | 42 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 11,245.49 | CABLE | 1 Piece(s) | 3 Day(s) | 43 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 11,504.21 | CABLE | 1 Piece(s) | 3 Day(s) | 44 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 11,762.91 | CABLE | 1 Piece(s) | 3 Day(s) | 45 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 12,021.62 | CABLE | 1 Piece(s) | 3 Day(s) | 46 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 12,280.33 | CABLE | 1 Piece(s) | 3 Day(s) | 47 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 12,539.04 | CABLE | 1 Piece(s) | 3 Day(s) | 48 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 12,797.74 | CABLE | 1 Piece(s) | 3 Day(s) | 49 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 11,488.52 | CABLE | 1 Piece(s) | 3 Day(s) | 50 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 11,715.87 | CABLE | 1 Piece(s) | 3 Day(s) | 51 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 11,943.22 | CABLE | 1 Piece(s) | 3 Day(s) | 52 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 12,170.57 | CABLE | 1 Piece(s) | 3 Day(s) | 53 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 12,397.92 | CABLE | 1 Piece(s) | 3 Day(s) | 54 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 12,625.26 | CABLE | 1 Piece(s) | 3 Day(s) | 55 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 12,852.61 | CABLE | 1 Piece(s) | 3 Day(s) | 56 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 13,079.96 | CABLE | 1 Piece(s) | 3 Day(s) | 57 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 13,307.32 | CABLE | 1 Piece(s) | 3 Day(s) | 58 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 13,534.67 | CABLE | 1 Piece(s) | 3 Day(s) | 59 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 13,762.02 | CABLE | 1 Piece(s) | 3 Day(s) | 60 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 13,989.37 | CABLE | 1 Piece(s) | 3 Day(s) | 61 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 14,216.72 | CABLE | 1 Piece(s) | 3 Day(s) | 62 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 14,444.07 | CABLE | 1 Piece(s) | 3 Day(s) | 63 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 14,671.42 | CABLE | 1 Piece(s) | 3 Day(s) | 64 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 14,898.76 | CABLE | 1 Piece(s) | 3 Day(s) | 65 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 15,126.11 | CABLE | 1 Piece(s) | 3 Day(s) | 66 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 15,353.46 | CABLE | 1 Piece(s) | 3 Day(s) | 67 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 15,580.81 | CABLE | 1 Piece(s) | 3 Day(s) | 68 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 15,808.16 | CABLE | 1 Piece(s) | 3 Day(s) | 69 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 16,035.51 | CABLE | 1 Piece(s) | 3 Day(s) | 70 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 16,262.86 | CABLE | 1 Piece(s) | 3 Day(s) | 71 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 16,490.21 | CABLE | 1 Piece(s) | 3 Day(s) | 72 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 16,717.56 | CABLE | 1 Piece(s) | 3 Day(s) | 73 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 16,944.91 | CABLE | 1 Piece(s) | 3 Day(s) | 74 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 17,172.25 | CABLE | 1 Piece(s) | 3 Day(s) | 75 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 17,399.60 | CABLE | 1 Piece(s) | 3 Day(s) | 76 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 17,626.95 | CABLE | 1 Piece(s) | 3 Day(s) | 77 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 17,854.30 | CABLE | 1 Piece(s) | 3 Day(s) | 78 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 18,081.65 | CABLE | 1 Piece(s) | 3 Day(s) | 79 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 18,309.00 | CABLE | 1 Piece(s) | 3 Day(s) | 80 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 18,536.35 | CABLE | 1 Piece(s) | 3 Day(s) | 81 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 18,763.70 | CABLE | 1 Piece(s) | 3 Day(s) | 82 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 18,991.05 | CABLE | 1 Piece(s) | 3 Day(s) | 83 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 19,218.40 | CABLE | 1 Piece(s) | 3 Day(s) | 84 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 19,445.75 | CABLE | 1 Piece(s) | 3 Day(s) | 85 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 19,673.09 | CABLE | 1 Piece(s) | 3 Day(s) | 86 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 19,900.44 | CABLE | 1 Piece(s) | 3 Day(s) | 87 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 20,127.79 | CABLE | 1 Piece(s) | 3 Day(s) | 88 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 20,355.14 | CABLE | 1 Piece(s) | 3 Day(s) | 89 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 20,582.49 | CABLE | 1 Piece(s) | 3 Day(s) | 90 | 20 | - | 8P | 11.5 | Heat-Resistance | 21/0.18 | 1.67 |
Loading...
Rated Voltage | 300V | Shield | NA | Representative Standard | UL / CSA(c-UL) |
---|---|---|---|---|---|
Sheath (outer coating) color | Black | Sheath (outer coating) material | PVC (Polyvinyl Chloride) | Insulation body materials | PVC (Polyvinyl Chloride) |
How can we improve?
How can we improve?