(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
Suitable for wiring of electrical and electronic equipment subject to UL (AWM)/cUL (CSA)/NFPA (70/79) standards (unshielded type).
[Features]
· Uses UL (AWM), cUL (CSA), and NFPA (70/79) standards.
· Flame retardancy is UL: VW-1, CL2, CL3, cUL (CSA): FT1/FT2..
· High-density braid shielding.
Part Number | Price | Name | Minimum Order Qty. | Volume Discount | Days to Ship | Overall Length (m) | AWG size (AWG) | Number Of Cores (Core) | Logarithm | Finished outer diameter (mm) | Properties | Conductor configuration (Units/mm) | Insulation body outer diameter (mm) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
฿ 489.52 | CABLE | 1 Piece(s) | 3 Day(s) | 1 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 857.98 | CABLE | 1 Piece(s) | 3 Day(s) | 2 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 1,226.45 | CABLE | 1 Piece(s) | 3 Day(s) | 3 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 1,594.91 | CABLE | 1 Piece(s) | 3 Day(s) | 4 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 1,963.37 | CABLE | 1 Piece(s) | 3 Day(s) | 5 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 2,331.84 | CABLE | 1 Piece(s) | 3 Day(s) | 6 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 2,700.30 | CABLE | 1 Piece(s) | 3 Day(s) | 7 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 3,068.76 | CABLE | 1 Piece(s) | 3 Day(s) | 8 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 3,437.22 | CABLE | 1 Piece(s) | 3 Day(s) | 9 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 3,805.69 | CABLE | 1 Piece(s) | 3 Day(s) | 10 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 4,174.15 | CABLE | 1 Piece(s) | 3 Day(s) | 11 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 4,542.61 | CABLE | 1 Piece(s) | 3 Day(s) | 12 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 4,911.07 | CABLE | 1 Piece(s) | 3 Day(s) | 13 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 5,279.54 | CABLE | 1 Piece(s) | 3 Day(s) | 14 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 5,648.00 | CABLE | 1 Piece(s) | 3 Day(s) | 15 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 6,016.46 | CABLE | 1 Piece(s) | 3 Day(s) | 16 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 6,384.93 | CABLE | 1 Piece(s) | 3 Day(s) | 17 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 6,753.39 | CABLE | 1 Piece(s) | 3 Day(s) | 18 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 7,121.85 | CABLE | 1 Piece(s) | 3 Day(s) | 19 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 7,490.31 | CABLE | 1 Piece(s) | 3 Day(s) | 20 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 7,858.77 | CABLE | 1 Piece(s) | 3 Day(s) | 21 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 8,227.23 | CABLE | 1 Piece(s) | 3 Day(s) | 22 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 8,595.70 | CABLE | 1 Piece(s) | 3 Day(s) | 23 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 8,964.17 | CABLE | 1 Piece(s) | 3 Day(s) | 24 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 9,332.63 | CABLE | 1 Piece(s) | 3 Day(s) | 25 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 9,701.09 | CABLE | 1 Piece(s) | 3 Day(s) | 26 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 10,069.55 | CABLE | 1 Piece(s) | 3 Day(s) | 27 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 10,438.01 | CABLE | 1 Piece(s) | 3 Day(s) | 28 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 10,806.47 | CABLE | 1 Piece(s) | 3 Day(s) | 29 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 11,174.93 | CABLE | 1 Piece(s) | 3 Day(s) | 30 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 11,543.40 | CABLE | 1 Piece(s) | 3 Day(s) | 31 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 11,911.87 | CABLE | 1 Piece(s) | 3 Day(s) | 32 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 12,280.33 | CABLE | 1 Piece(s) | 3 Day(s) | 33 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 12,648.79 | CABLE | 1 Piece(s) | 3 Day(s) | 34 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 13,017.25 | CABLE | 1 Piece(s) | 3 Day(s) | 35 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 13,385.71 | CABLE | 1 Piece(s) | 3 Day(s) | 36 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 13,754.17 | CABLE | 1 Piece(s) | 3 Day(s) | 37 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 14,122.64 | CABLE | 1 Piece(s) | 3 Day(s) | 38 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 14,491.10 | CABLE | 1 Piece(s) | 3 Day(s) | 39 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 14,859.57 | CABLE | 1 Piece(s) | 3 Day(s) | 40 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 15,228.03 | CABLE | 1 Piece(s) | 3 Day(s) | 41 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 15,596.49 | CABLE | 1 Piece(s) | 3 Day(s) | 42 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 15,964.95 | CABLE | 1 Piece(s) | 3 Day(s) | 43 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 16,333.41 | CABLE | 1 Piece(s) | 3 Day(s) | 44 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 16,701.88 | CABLE | 1 Piece(s) | 3 Day(s) | 45 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 17,070.34 | CABLE | 1 Piece(s) | 3 Day(s) | 46 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 17,438.80 | CABLE | 1 Piece(s) | 3 Day(s) | 47 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 17,807.26 | CABLE | 1 Piece(s) | 3 Day(s) | 48 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 18,175.73 | CABLE | 1 Piece(s) | 3 Day(s) | 49 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 16,343.07 | CABLE | 1 Piece(s) | 3 Day(s) | 50 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 16,667.50 | CABLE | 1 Piece(s) | 3 Day(s) | 51 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 16,991.94 | CABLE | 1 Piece(s) | 3 Day(s) | 52 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 17,316.39 | CABLE | 1 Piece(s) | 3 Day(s) | 53 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 17,640.82 | CABLE | 1 Piece(s) | 3 Day(s) | 54 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 17,965.26 | CABLE | 1 Piece(s) | 3 Day(s) | 55 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 18,289.71 | CABLE | 1 Piece(s) | 3 Day(s) | 56 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 18,614.14 | CABLE | 1 Piece(s) | 3 Day(s) | 57 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 18,938.58 | CABLE | 1 Piece(s) | 3 Day(s) | 58 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 19,263.02 | CABLE | 1 Piece(s) | 3 Day(s) | 59 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 19,587.47 | CABLE | 1 Piece(s) | 3 Day(s) | 60 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 19,911.90 | CABLE | 1 Piece(s) | 3 Day(s) | 61 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 20,236.34 | CABLE | 1 Piece(s) | 3 Day(s) | 62 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 20,560.79 | CABLE | 1 Piece(s) | 3 Day(s) | 63 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 20,885.22 | CABLE | 1 Piece(s) | 3 Day(s) | 64 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 21,209.66 | CABLE | 1 Piece(s) | 3 Day(s) | 65 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 21,534.10 | CABLE | 1 Piece(s) | 3 Day(s) | 66 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 21,858.55 | CABLE | 1 Piece(s) | 3 Day(s) | 67 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 22,182.98 | CABLE | 1 Piece(s) | 3 Day(s) | 68 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 22,507.42 | CABLE | 1 Piece(s) | 3 Day(s) | 69 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 22,831.87 | CABLE | 1 Piece(s) | 3 Day(s) | 70 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 23,156.30 | CABLE | 1 Piece(s) | 3 Day(s) | 71 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 23,480.74 | CABLE | 1 Piece(s) | 3 Day(s) | 72 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 23,805.19 | CABLE | 1 Piece(s) | 3 Day(s) | 73 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 24,129.63 | CABLE | 1 Piece(s) | 3 Day(s) | 74 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 24,454.06 | CABLE | 1 Piece(s) | 3 Day(s) | 75 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 24,778.50 | CABLE | 1 Piece(s) | 3 Day(s) | 76 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 25,102.95 | CABLE | 1 Piece(s) | 3 Day(s) | 77 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 25,427.38 | CABLE | 1 Piece(s) | 3 Day(s) | 78 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 25,751.82 | CABLE | 1 Piece(s) | 3 Day(s) | 79 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 26,076.27 | CABLE | 1 Piece(s) | 3 Day(s) | 80 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 26,400.70 | CABLE | 1 Piece(s) | 3 Day(s) | 81 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 26,725.14 | CABLE | 1 Piece(s) | 3 Day(s) | 82 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 27,049.59 | CABLE | 1 Piece(s) | 3 Day(s) | 83 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 27,374.03 | CABLE | 1 Piece(s) | 3 Day(s) | 84 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 27,698.46 | CABLE | 1 Piece(s) | 3 Day(s) | 85 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 28,022.90 | CABLE | 1 Piece(s) | 3 Day(s) | 86 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 28,347.35 | CABLE | 1 Piece(s) | 3 Day(s) | 87 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 28,671.78 | CABLE | 1 Piece(s) | 3 Day(s) | 88 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 28,996.22 | CABLE | 1 Piece(s) | 3 Day(s) | 89 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 | ||
฿ 29,320.67 | CABLE | 1 Piece(s) | 3 Day(s) | 90 | 20 | - | 10P | 13.4 | Heat-Resistance | 21/0.18 | 1.67 |
Loading...
Rated Voltage | 300V | Shield | NA | Representative Standard | UL / CSA(c-UL) |
---|---|---|---|---|---|
Sheath (outer coating) color | Black | Sheath (outer coating) material | PVC (Polyvinyl Chloride) | Insulation body materials | PVC (Polyvinyl Chloride) |
How can we improve?
How can we improve?