(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
[Features]
・High-speed rotation is possible by adopting a 45° helix.
・Using a fine pitch nick, the surface roughness after processing is also excellent.
・The conductivity is minimal.
《Additional machining》
・Additional neck relief machining can be specified using MISUMI standard tools.
・No need to create drawings. You can order by simply specifying the dimensions using the model number.
・Available starting from 1 piece, ``just the quantity you need when you need it.''
・Delivered on the 3rd day.
Part Number |
---|
SN-VAC-HRFPR6-15-[20-42/1]-15 |
SN-VAC-HRFPR6-[16-32/1]-10 |
SN-VAC-HRFPR7-[23-46/1]-18 |
SN-VAC-HRFPR8-20-[25-46/1]-20 |
SN-VAC-HRFPR8-[17-36/1]-12 |
SN-VAC-HRFPR10-25-[30-45/1]-25 |
SN-VAC-HRFPR10-[20-35/1]-15 |
SN-VAC-HRFPR12-30-[35-44/1]-30 |
SN-VAC-HRFPR12-[25-34/1]-20 |
VAC-HRFPR3 |
VAC-HRFPR4 |
VAC-HRFPR5 |
VAC-HRFPR6 |
VAC-HRFPR6-15 |
VAC-HRFPR7 |
VAC-HRFPR8 |
VAC-HRFPR8-20 |
VAC-HRFPR10 |
VAC-HRFPR10-25 |
VAC-HRFPR12 |
VAC-HRFPR12-30 |
Part Number | Price | Name | Minimum Order Qty. | Volume Discount | Days to Ship | RoHS | Outer Diameter (D) (φ) | Flute Length (ℓ) (mm) | Number of Flutes (sheet) | Shank Diameter (d) (mm) | Overall Length (L) (mm) | Under Neck Lenght ℓ1 (mm) | Blade length ℓ (mm) | Figure | Ultra-Small R (mm) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
- | CARBIDE ENDMILL | 1 Piece(s) | 7 Day(s) | - | - | - | - | - | - | - | 20 ~ 42 | - | - | ||
- | CARBIDE ENDMILL | 1 Piece(s) | 7 Day(s) | - | - | - | - | - | - | 16 ~ 32 | 10 | - | - | ||
- | CARBIDE ENDMILL | 1 Piece(s) | 7 Day(s) | - | - | - | - | - | - | 23 ~ 46 | 18 | - | - | ||
- | CARBIDE ENDMILL | 1 Piece(s) | 7 Day(s) | - | - | - | - | - | - | - | 25 ~ 46 | - | - | ||
- | CARBIDE ENDMILL | 1 Piece(s) | 7 Day(s) | - | - | - | - | - | - | 17 ~ 36 | 12 | - | - | ||
- | CARBIDE ENDMILL | 1 Piece(s) | 7 Day(s) | - | - | - | - | - | - | - | 30 ~ 45 | - | - | ||
- | CARBIDE ENDMILL | 1 Piece(s) | 7 Day(s) | - | - | - | - | - | - | 20 ~ 35 | 15 | - | - | ||
- | CARBIDE ENDMILL | 1 Piece(s) | 7 Day(s) | - | - | - | - | - | - | - | 35 ~ 44 | - | - | ||
- | CARBIDE ENDMILL | 1 Piece(s) | 7 Day(s) | - | - | - | - | - | - | 25 ~ 34 | 20 | - | - | ||
฿ 2,795.00 | ENDMILL | 1 Piece(s) | 3 Day(s) | 10 | 3 | 8 | 3 | 6 | 50 | - | - | 1 | 0.2 | ||
฿ 2,795.00 | ENDMILL | 1 Piece(s) | 3 Day(s) | - | 4 | 10 | 3 | 6 | 50 | - | - | 1 | 0.2 | ||
฿ 1,715.00 | ENDMILL | 1 Piece(s) | Available | 3 Day(s) | - | 5 | 13 | 4 | 6 | 50 | - | - | 1 | 0.2 | |
฿ 2,469.00 | ENDMILL | 1 Piece(s) | 3 Day(s) | - | 6 | 10 | 4 | 6 | 50 | - | - | 2 | 0.2 | ||
฿ 1,854.00 | ENDMILL | 1 Piece(s) | Available | 3 Day(s) | - | 6 | 15 | 4 | 6 | 60 | - | - | 2 | 0.2 | |
฿ 2,234.00 | ENDMILL | 1 Piece(s) | Available | 3 Day(s) | - | 7 | 18 | 4 | 8 | 70 | - | - | 1 | 0.2 | |
฿ 1,943.00 | ENDMILL | 1 Piece(s) | Available | 3 Day(s) | - | 8 | 12 | 4 | 8 | 60 | - | - | 2 | 0.2 | |
฿ 2,117.00 | ENDMILL | 1 Piece(s) | Available | 3 Day(s) | - | 8 | 20 | 4 | 8 | 70 | - | - | 2 | 0.2 | |
฿ 2,113.55 | ENDMILL | 1 Piece(s) | Available | 3 Day(s) | - | 10 | 15 | 4 | 10 | 65 | - | - | 2 | 0.3 | |
฿ 2,249.03 | ENDMILL | 1 Piece(s) | Same day | 10 | 10 | 25 | 4 | 10 | 75 | - | - | 2 | 0.3 | ||
฿ 2,326.45 | ENDMILL | 1 Piece(s) | Available | 3 Day(s) | - | 12 | 20 | 4 | 12 | 70 | - | - | 2 | 0.3 | |
฿ 2,597.42 | ENDMILL | 1 Piece(s) | Available | 3 Day(s) | - | 12 | 30 | 4 | 12 | 80 | - | - | 2 | 0.3 |
Loading...
Flute Diameter D | Flute Length ℓ | Flute Length ℓ | Overall Length L | Shank Diameter d | Slight Rounding | Number of Flutes | Figure |
3 | − | 8 | 50 | 6 | 0.2 | 3 | 1 |
4 | − | 10 | 50 | 6 | 0.2 | 3 | 1 |
5 | − | 13 | 50 | 6 | 0.2 | 4 | 1 |
6 | − | 10 | 50 | 6 | 0.2 | 4 | 2 |
15 | 15 | 60 | 6 | 0.2 | 4 | 2 | |
7 | − | 18 | 70 | 8 | 0.2 | 4 | 1 |
8 | − | 12 | 60 | 8 | 0.2 | 4 | 2 |
20 | 20 | 70 | 8 | 0.2 | 4 | 2 | |
10 | − | 15 | 65 | 10 | 0.3 | 4 | 2 |
25 | 25 | 75 | 10 | 0.3 | 4 | 2 | |
12 | − | 20 | 70 | 12 | 0.3 | 4 | 2 |
30 | 30 | 80 | 12 | 0.3 | 4 | 2 |
How can we improve?
How can we improve?