(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
K Thermocouples Lead Wire Mounting / Movable Cable
Model Number | Section Area | Number of Pairs 1P = 2-core | Total Length or Specified Length | Sample Provided |
NAVXG | 0.5 * (AWG20) | 1P | 1 ~ 100 (Specify 1 m Increment) | — |
1.25 * (AWG16) | 1P | — | ||
NAKXGS | 0.5 * (AWG20) | 1P | — | |
1.25* (AWG16) | 1P | — | ||
NAKXHSR | 0.3 * (AWG22) | 1P | ◎ |
Operating Temperature Range | -20 ~ 80°C *1 |
Standard Acquired | JIS C 1610 |
Bending Radius | Finished Outer Diameter x 7.5 Times (Fixed Part Only) * 2 |
Model Number | Section Area (mm2) | Number of Pairs 1P = 2-core | Specified Length (m) | Conductor Material | Conductor | Insulation Thickness (mm) | Sheath Thickness (mm) | Finished Outer Diameter (mm) | Electrical Properties | Approximate Mass kg/km | |||||
Category | + Pole (Red) | - Pole (White) | Structure Strands / mm | Outer Diameter Approx. (mm) | Withstand Voltage V / Min | Insulation Properties MΩkm | Thermoelectromotive Force 100°C mv | ||||||||
NAVXG | 0.5 * (AWG20) | 1P | 1 ~ 100 (Specify 1 m Increment) | Normal Grade for General Use | Copper | Constantan | 7/0.3 | 0.9 | 0.5 | 0.65 | 3.2 x 5.1 | 1000 | 50 or more | 4.096 ± 0.100 | 23 |
1.25 * (AWG16) | 1P | Copper | Constantan | 7/0.45 | 1.35 | 0.6 | 1 | 4.6 x 7.1 | 4.096 ± 0.100 | 54 | |||||
NAKXGS | 0.5 *(AWG20) | 1P | Precision Grade for General Use | Chromel | Alumel | 7/0.3 | 0.9 | 0.5 | 0.65 | 3.2 x 5.1 | 4.096 ± 0.060 | 23 | |||
1.25 * (AWG16) | 1P | Chromel | Alumel | 7/0.45 | 1.35 | 0.6 | 1 | 4.6 x 7.1 | 4.096 ± 0.060 | 54 | |||||
NAKXHSR (For Movable) | 0.3 * (AWG22) | 1P | Precision Grade for Heat-Resistance | Chromel | Alumel | 30/0.1 | 0.6 | 0.3 | 0.8 | 4 | 1000 | 1000 or more | 4.096 ± 0.060 | 31 |
NAVXG | NAKXGS | NAKXHSR | |
Conductor | Copper / Constantan | Chromel / Alumel | Chromel / Alumel |
Insulator | Vinyl Chloride | Fluorine Resin | |
Twisting | Flat Type | Round Type | |
Shield | N/A | N/A | |
Sheath | Vinyl Chloride | Flexible Fluorine Rubber |
NAKXHSR Bending Resistant Properties | ||
Bending Test | Torsion Test | Cableveyor |
Times or more | ||
300,000 Times | 100,000 Times | 5 Million Times |
Part Number | Price | Name | Minimum Order Qty. | Volume Discount | Days to Ship | Overall Length (m) | Conductor Cross Section (mm2) | AWG size (AWG) | Finished outer diameter (mm) | Sheath (outer coating) color | Sheath (outer coating) material | Insulation body materials | Other properties |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
฿ 167.76 | CABLE | 1 Piece(s) | 3 Day(s) | 1 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 244.97 | CABLE | 1 Piece(s) | 3 Day(s) | 2 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 326.32 | CABLE | 1 Piece(s) | 3 Day(s) | 3 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 435.10 | CABLE | 1 Piece(s) | 3 Day(s) | 4 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 543.87 | CABLE | 1 Piece(s) | 3 Day(s) | 5 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 652.65 | CABLE | 1 Piece(s) | 3 Day(s) | 6 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 761.42 | CABLE | 1 Piece(s) | 3 Day(s) | 7 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 870.19 | CABLE | 1 Piece(s) | 3 Day(s) | 8 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 978.97 | CABLE | 1 Piece(s) | 3 Day(s) | 9 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 1,087.74 | CABLE | 1 Piece(s) | Same day | 10 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 1,196.52 | CABLE | 1 Piece(s) | 3 Day(s) | 11 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 1,305.29 | CABLE | 1 Piece(s) | 3 Day(s) | 12 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 1,414.06 | CABLE | 1 Piece(s) | 3 Day(s) | 13 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 1,522.84 | CABLE | 1 Piece(s) | 3 Day(s) | 14 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 1,631.61 | CABLE | 1 Piece(s) | 3 Day(s) | 15 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 1,740.39 | CABLE | 1 Piece(s) | 3 Day(s) | 16 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 1,849.16 | CABLE | 1 Piece(s) | 3 Day(s) | 17 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 1,957.94 | CABLE | 1 Piece(s) | 3 Day(s) | 18 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 2,066.71 | CABLE | 1 Piece(s) | 3 Day(s) | 19 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 2,175.48 | CABLE | 1 Piece(s) | 3 Day(s) | 20 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 2,284.26 | CABLE | 1 Piece(s) | 3 Day(s) | 21 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 2,393.03 | CABLE | 1 Piece(s) | 3 Day(s) | 22 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 2,501.81 | CABLE | 1 Piece(s) | 3 Day(s) | 23 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 2,610.58 | CABLE | 1 Piece(s) | 3 Day(s) | 24 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 2,719.35 | CABLE | 1 Piece(s) | 3 Day(s) | 25 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 2,828.13 | CABLE | 1 Piece(s) | 3 Day(s) | 26 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 2,936.90 | CABLE | 1 Piece(s) | 3 Day(s) | 27 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 3,045.68 | CABLE | 1 Piece(s) | 3 Day(s) | 28 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 3,154.45 | CABLE | 1 Piece(s) | 3 Day(s) | 29 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 3,263.23 | CABLE | 1 Piece(s) | 3 Day(s) | 30 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 3,372.00 | CABLE | 1 Piece(s) | 3 Day(s) | 31 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 3,480.77 | CABLE | 1 Piece(s) | 3 Day(s) | 32 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 3,589.55 | CABLE | 1 Piece(s) | 3 Day(s) | 33 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 3,698.32 | CABLE | 1 Piece(s) | 3 Day(s) | 34 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 3,807.10 | CABLE | 1 Piece(s) | 3 Day(s) | 35 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 3,915.87 | CABLE | 1 Piece(s) | 3 Day(s) | 36 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 4,024.65 | CABLE | 1 Piece(s) | 3 Day(s) | 37 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 4,133.42 | CABLE | 1 Piece(s) | 3 Day(s) | 38 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 4,242.19 | CABLE | 1 Piece(s) | 3 Day(s) | 39 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 4,350.97 | CABLE | 1 Piece(s) | 3 Day(s) | 40 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 4,459.74 | CABLE | 1 Piece(s) | 3 Day(s) | 41 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 4,568.52 | CABLE | 1 Piece(s) | 3 Day(s) | 42 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 4,677.29 | CABLE | 1 Piece(s) | 3 Day(s) | 43 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 4,786.06 | CABLE | 1 Piece(s) | 3 Day(s) | 44 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 4,894.84 | CABLE | 1 Piece(s) | 3 Day(s) | 45 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 5,003.61 | CABLE | 1 Piece(s) | 3 Day(s) | 46 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 5,112.39 | CABLE | 1 Piece(s) | 3 Day(s) | 47 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 5,221.16 | CABLE | 1 Piece(s) | 3 Day(s) | 48 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 5,329.94 | CABLE | 1 Piece(s) | 3 Day(s) | 49 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 4,006.45 | CABLE | 1 Piece(s) | 3 Day(s) | 50 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 4,086.58 | CABLE | 1 Piece(s) | 3 Day(s) | 51 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 4,166.71 | CABLE | 1 Piece(s) | 3 Day(s) | 52 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 4,246.84 | CABLE | 1 Piece(s) | 3 Day(s) | 53 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 4,326.97 | CABLE | 1 Piece(s) | 3 Day(s) | 54 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 4,407.10 | CABLE | 1 Piece(s) | 3 Day(s) | 55 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 4,487.23 | CABLE | 1 Piece(s) | 3 Day(s) | 56 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 4,567.35 | CABLE | 1 Piece(s) | 3 Day(s) | 57 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 4,647.48 | CABLE | 1 Piece(s) | 3 Day(s) | 58 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 4,727.61 | CABLE | 1 Piece(s) | 3 Day(s) | 59 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 4,807.74 | CABLE | 1 Piece(s) | 3 Day(s) | 60 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 4,887.87 | CABLE | 1 Piece(s) | 3 Day(s) | 61 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 4,968.00 | CABLE | 1 Piece(s) | 3 Day(s) | 62 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 5,048.13 | CABLE | 1 Piece(s) | 3 Day(s) | 63 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 5,128.26 | CABLE | 1 Piece(s) | 3 Day(s) | 64 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 5,208.39 | CABLE | 1 Piece(s) | 3 Day(s) | 65 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 5,288.52 | CABLE | 1 Piece(s) | 3 Day(s) | 66 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 5,368.65 | CABLE | 1 Piece(s) | 3 Day(s) | 67 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 5,448.77 | CABLE | 1 Piece(s) | 3 Day(s) | 68 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 5,528.90 | CABLE | 1 Piece(s) | 3 Day(s) | 69 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 5,609.03 | CABLE | 1 Piece(s) | 3 Day(s) | 70 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 5,689.16 | CABLE | 1 Piece(s) | 3 Day(s) | 71 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 5,769.29 | CABLE | 1 Piece(s) | 3 Day(s) | 72 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 5,849.42 | CABLE | 1 Piece(s) | 3 Day(s) | 73 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 5,929.55 | CABLE | 1 Piece(s) | 3 Day(s) | 74 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 6,009.68 | CABLE | 1 Piece(s) | 3 Day(s) | 75 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 6,089.81 | CABLE | 1 Piece(s) | 3 Day(s) | 76 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 6,169.94 | CABLE | 1 Piece(s) | 3 Day(s) | 77 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 6,250.06 | CABLE | 1 Piece(s) | 3 Day(s) | 78 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 6,330.19 | CABLE | 1 Piece(s) | 3 Day(s) | 79 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 6,410.32 | CABLE | 1 Piece(s) | 3 Day(s) | 80 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 6,490.45 | CABLE | 1 Piece(s) | 3 Day(s) | 81 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 6,570.58 | CABLE | 1 Piece(s) | 3 Day(s) | 82 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 6,650.71 | CABLE | 1 Piece(s) | 3 Day(s) | 83 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 6,730.84 | CABLE | 1 Piece(s) | 3 Day(s) | 84 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 6,810.97 | CABLE | 1 Piece(s) | 3 Day(s) | 85 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 6,891.10 | CABLE | 1 Piece(s) | 3 Day(s) | 86 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 6,971.23 | CABLE | 1 Piece(s) | 3 Day(s) | 87 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 7,051.35 | CABLE | 1 Piece(s) | 3 Day(s) | 88 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 7,131.48 | CABLE | 1 Piece(s) | 3 Day(s) | 89 | 0.5 | 20 | - | - | PVC | PVC | - | ||
฿ 7,211.61 | CABLE | 1 Piece(s) | 3 Day(s) | 90 | 0.5 | 20 | - | - | PVC | PVC | - |
Loading...
Shield | None | Power supply/signal | Dual use |
---|
How can we improve?
How can we improve?