(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.

    Sales
  • Viewed
    Products
  • My
    Components
  • Cart
Recently Viewed Products
X
My Components
X
Cart Item(s)
X
Loading...
  • แจ้งวันหยุดทำการในเดือน กรกฎาคมและสิงหาคม 2567 | Notice holiday in July and August 2024 > คลิก

Scaffold Planks(Overall Length:700~1200)

Scaffolding planks are boards used as temporary platforms installed at worksites. Scaffolding planks are mounted on supports. The product consists of the board used as the platform, along with its associated parts such as single pipes. Scaffolding planks are primarily used to provide a stable platform for working in high places such as at construction and inspection worksites. Scaffolding planks used as platforms come in types for single- and double-sided use. There are also retractable types with adjustable board lengths and fixed-length types with set lengths. The type best suited to the worksite can be selected. Aluminum and steel are the most common materials, and non-skid surface treatments are in widespread use. Using clamps and joint brackets to connect single pipes and struts is a key requirement for the single pipes used to fasten scaffolding planks. When selecting and installing a scaffolding plank, users should check the plank's overall length and width, and verify whether its maximum operating weight will be sufficient for the work.
CAD
Days to Ship
  • All
  • Same day
  • 1 Day(s) or Less
  • 5 Day(s) or Less
  • 6 Day(s) or Less
  • 7 Day(s) or Less
  • Others
1 items
Sort By
30
60
90
  1. 1
  • You can add up to 6 items per a category to the compare list.
    Telescopic Step-Through Prevention Scaffold Board Easy Step Thick

    Telescopic Step-Through Prevention Scaffold Board Easy Step Thick

    NAKAO

    [Features]
    · Extendable in increments of 250 mm.
    · The top board has an anti-slip design.
    · Developed to prevent stepping through a collapsed roof, etc., as specified in Article 524 of the Ordinance on Industrial Safety and Hygiene of Japan.
    From: ฿ 14,107.18
    Days to Ship: day to ship 40 Day(s)
    day to ship 40 Day(s)
Brand
Product Series
From
Days to Ship
Product Model
Overall Length(mm)
Maximum Operating Mass(kg)
Applicable Pipe Diameter(mm)
Others
You can add up to 6 items per a category to the compare list.
Telescopic Step-Through Prevention Scaffold Board Easy Step Thick
Brand

NAKAO

Product Series

Telescopic Step-Through Prevention Scaffold Board Easy Step Thick

From

฿ 14,107.18

Days to Ship 40 Day(s)
Product ModelTemporary Scaffold Planks (Telescopic Type)
Overall Length(mm)700~1200
Maximum Operating Mass(kg)100
Applicable Pipe Diameter(mm)-
Others-

Loading...

  1. 1

Related Categories to Scaffold Planks