(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
Part Number |
---|
SH-1LNESS |
SH-1NESS |
SH-2LNESS |
SH-2NESS |
SH-3NESS |
Part Number | Price | Name | Minimum Order Qty. | Volume Discount | Days to Ship | Length (mm) |
Width (mm) |
Height (mm) |
Caster Diameter (mm) |
Trusco Code | Load Resistance (kg) |
Specifications | Internal Capacity |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
฿ 38,741.00 ฿ 32,906.61 |
STEEL PLATFORM TRUCKS | 1 Piece(s) | 35 Day(s) | 1400 | 750 | 289 | 200 | 772-6341 | 600 | Attached stopper set: LSH-1SET, electrically conductive swivel caster x 2, electrically conductive fixed caster x 2 | 1 unit | ||
฿ 37,661.00 ฿ 32,365.86 |
STEEL PLATFORM TRUCKS | 1 Piece(s) | 35 Day(s) | 1200 | 750 | 289 | 200 | 772-6376 | 600 | Attached stopper set: LSH-1SET, electrically conductive swivel caster x 2, electrically conductive fixed caster x 2 | 1 unit | ||
฿ 27,400.00 ฿ 22,755.70 |
STEEL PLATFORM TRUCKS | 1 Piece(s) | 35 Day(s) | 1200 | 600 | 234 | 150 | 772-6406 | 500 | Attached stopper set: LSH-2SET, electrically conductive swivel caster x 2, electrically conductive fixed caster x 2 | 1 unit | ||
฿ 24,674.00 ฿ 20,765.64 |
STEEL PLATFORM TRUCKS | 1 Piece(s) | 35 Day(s) | 900 | 600 | 234 | 150 | 772-6431 | 500 | Attached stopper set: LSP-2SET, electrically conductive swivel caster x 2, electrically conductive fixed caster x 2 | 1 unit | ||
฿ 18,975.00 ฿ 16,314.71 |
STEEL PLATFORM TRUCKS | 1 Piece(s) | 35 Day(s) | 800 | 450 | 180 | 100 | 772-6465 | 300 | Attached stopper set: LSH-3SET, electrically conductive swivel caster x 2, electrically conductive fixed caster x 2 | 1 unit |
Steel Hand Truck, Electrically Conductive with Stoppers
[Features]
It consists of 4 wheels caster
- Font Wheels: Swivel casters (can move in any direction) 2 pcs
- Rear Wheels: Rigid or Fixed Caster (Can not rotate 360° move only in one direction) 2 pcs
• Casters'material was made of conductive rubber
• The cart structure was made of steel-coated color
• Included pedal lock
• Have various sizes and carry load approx.300-600 kg (depending on product code)
[Applications]
Places where static electricity should be avoided and electronic industrial.
Part Number |
---|
SH-1LNESS |
SH-1NESS |
SH-2LNESS |
SH-2NESS |
SH-3NESS |
Part Number | Price | Name | Minimum Order Qty. | Volume Discount | Days to Ship | Length (mm) |
Width (mm) |
Height (mm) |
Caster Diameter (mm) |
Trusco Code | Load Resistance (kg) |
Specifications | Internal Capacity |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
฿ 38,741.00 ฿ 32,906.61 |
STEEL PLATFORM TRUCKS | 1 Piece(s) | 35 Day(s) | 1400 | 750 | 289 | 200 | 772-6341 | 600 | Attached stopper set: LSH-1SET, electrically conductive swivel caster x 2, electrically conductive fixed caster x 2 | 1 unit | ||
฿ 37,661.00 ฿ 32,365.86 |
STEEL PLATFORM TRUCKS | 1 Piece(s) | 35 Day(s) | 1200 | 750 | 289 | 200 | 772-6376 | 600 | Attached stopper set: LSH-1SET, electrically conductive swivel caster x 2, electrically conductive fixed caster x 2 | 1 unit | ||
฿ 27,400.00 ฿ 22,755.70 |
STEEL PLATFORM TRUCKS | 1 Piece(s) | 35 Day(s) | 1200 | 600 | 234 | 150 | 772-6406 | 500 | Attached stopper set: LSH-2SET, electrically conductive swivel caster x 2, electrically conductive fixed caster x 2 | 1 unit | ||
฿ 24,674.00 ฿ 20,765.64 |
STEEL PLATFORM TRUCKS | 1 Piece(s) | 35 Day(s) | 900 | 600 | 234 | 150 | 772-6431 | 500 | Attached stopper set: LSP-2SET, electrically conductive swivel caster x 2, electrically conductive fixed caster x 2 | 1 unit | ||
฿ 18,975.00 ฿ 16,314.71 |
STEEL PLATFORM TRUCKS | 1 Piece(s) | 35 Day(s) | 800 | 450 | 180 | 100 | 772-6465 | 300 | Attached stopper set: LSH-3SET, electrically conductive swivel caster x 2, electrically conductive fixed caster x 2 | 1 unit |
Loading...
The product list can be filtered using the selections found beneath the specification item name.
How can we improve?
How can we improve?