(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
[Features]
・ Mirai's Beam Rackle C-shaped clamp has a steel mounting part and an instrument mounting part that are integrated: no assembly work required
[Applications]
・ For installing lighting fixtures for high ceilings. (SGA‒11 (J))
・ For mounting fluorescent lights, wiring equipment, fire detectors, etc. (SGA‒12, SG‒0 (L), SG‒1 (B, L), SG‒3 (L))
・ For hanging brackets of racks and ducts, etc. (SGA-10-3E, SGA-12, SGS-10, SG-5 (L), SGA-10-□, SGA-12 L, SGS-10-□)
・ For supporting and hanging cables. (SG‒1 (B, L), SG‒5 (L))
・ For installation of explosion-proof light fixtures, high ceiling light fixtures, loudspeakers, etc. (SG‒2 (L), SGA‒TK1, SG‒2 (L))
Part Number | Price | Name | Minimum Order Qty. | Volume Discount | Days to Ship | Compatible bolt | Plating, coating | Compatible dimension (A) |
---|---|---|---|---|---|---|---|---|
฿ 364.53 | PARTS FOR ELECTRIC FACILITIES | 10 Piece(s) | 6 Day(s) | - | Electrogalvanized | H and L structural steel (steel thickness up to 20 mm), C structural steel (flange up to 20 mm) | ||
฿ 282.56 | PARTS FOR ELECTRIC FACILITIES | 10 Piece(s) | 6 Day(s) | - | Electrogalvanized | H and L structural steel (steel thickness up to 20 mm), C structural steel (flange up to 20 mm) | ||
฿ 282.56 | PARTS FOR ELECTRIC FACILITIES | 10 Piece(s) | 6 Day(s) | - | Electrogalvanized | H and L structural steel (steel thickness up to 20 mm), C structural steel (flange up to 20 mm) | ||
฿ 218.02 | PARTS FOR ELECTRIC FACILITIES | 10 Piece(s) | 6 Day(s) | - | Electrogalvanized | H and L structural steel (steel thickness up to 20 mm), C structural steel (flange up to 20 mm) | ||
฿ 244.19 | PARTS FOR ELECTRIC FACILITIES | 10 Piece(s) | 6 Day(s) | - | Electrogalvanized | H and L structural steel (steel thickness up to 30 mm), C structural steel (flange up to 30 mm) | ||
฿ 282.56 | PARTS FOR ELECTRIC FACILITIES | 10 Piece(s) | 6 Day(s) | - | Electrogalvanized (metal parts) | H and L structural steel (steel thickness up to 20 mm), C structural steel (flange up to 20 mm) | ||
฿ 292.15 | PARTS FOR ELECTRIC FACILITIES | 1 Piece(s) | 6 Day(s) | - | Electrogalvanized (metal parts) | H and L structural steel (steel thickness up to 20 mm), C structural steel (flange up to 20 mm) | ||
฿ 353.20 | PARTS FOR ELECTRIC FACILITIES | 10 Piece(s) | 6 Day(s) | - | Hot dipped | H and L structural steel (steel thickness up to 20 mm), C structural steel (flange up to 20 mm) | ||
฿ 305.23 | PARTS FOR ELECTRIC FACILITIES | 10 Piece(s) | 6 Day(s) | - | Electrogalvanized (metal parts) | H and L structural steel (steel thickness up to 30 mm), C structural steel (flange up to 30 mm) | ||
฿ 227.72 | PARTS FOR ELECTRIC FACILITIES | 1 Piece(s) | 6 Day(s) | - | Electrogalvanized (metal parts) | H and L structural steel (steel thickness up to 20 mm), C structural steel (flange up to 20 mm) | ||
฿ 249.43 | PARTS FOR ELECTRIC FACILITIES | 1 Piece(s) | 6 Day(s) | - | Electrogalvanized (metal parts) | H and L structural steel (steel thickness up to 30 mm), C structural steel (flange up to 30 mm) | ||
฿ 235.57 | PARTS FOR ELECTRIC FACILITIES | 1 Piece(s) | 6 Day(s) | - | Electrogalvanized | H and L structural steel (steel thickness up to 20 mm), C structural steel (flange up to 20 mm) | ||
฿ 231.48 | PARTS FOR ELECTRIC FACILITIES | 1 Piece(s) | 6 Day(s) | - | Electrogalvanized | H and L structural steel (steel thickness up to 30 mm), C structural steel (flange up to 30 mm) | ||
฿ 110.66 | PARTS FOR ELECTRIC FACILITIES | 10 Piece(s) | 6 Day(s) | W 3/8 | Electrogalvanized | H and L structural steel (steel thickness up to 20 mm), C structural steel (flange up to 20 mm) | ||
฿ 144.95 | PARTS FOR ELECTRIC FACILITIES | 10 Piece(s) | 6 Day(s) | W 3/8 | Hot dipped | H and L structural steel (steel thickness up to 20 mm), C structural steel (flange up to 20 mm) | ||
฿ 133.34 | PARTS FOR ELECTRIC FACILITIES | 10 Piece(s) | 6 Day(s) | W 3/8 | Electrogalvanized | H and L structural steel (steel thickness up to 30 mm), C structural steel (flange up to 30 mm) | ||
฿ 199.32 | PARTS FOR ELECTRIC FACILITIES | 1 Piece(s) | 6 Day(s) | W 3/8 | Electrogalvanized | H and L structural steel (steel thickness up to 24 mm), C structural steel (flange up to 20 mm) | ||
฿ 264.29 | PARTS FOR ELECTRIC FACILITIES | 1 Piece(s) | 6 Day(s) | W 3/8 | Hot dipped | H and L structural steel (steel thickness up to 24 mm), C structural steel (flange up to 20 mm) | ||
฿ 160.58 | PARTS FOR ELECTRIC FACILITIES | 1 Piece(s) | 6 Day(s) | W 3/8 | Electrogalvanized | H and L structural steel (steel thickness up to 24 mm), C structural steel (flange up to 20 mm) | ||
฿ 215.62 | PARTS FOR ELECTRIC FACILITIES | 1 Piece(s) | 6 Day(s) | W1/2 | Electrogalvanized | H and L structural steel (steel thickness up to 24 mm), C structural steel (flange up to 20 mm) | ||
฿ 275.34 | PARTS FOR ELECTRIC FACILITIES | 1 Piece(s) | 6 Day(s) | W1/2 | Hot dipped | H and L structural steel (steel thickness up to 24 mm), C structural steel (flange up to 20 mm) | ||
฿ 328.34 | PARTS FOR ELECTRIC FACILITIES | 1 Piece(s) | 6 Day(s) | - | Electrogalvanized | H and L structural steel (steel thickness up to 24 mm), C structural steel (flange up to 20 mm) | ||
฿ 410.19 | PARTS FOR ELECTRIC FACILITIES | 1 Piece(s) | 6 Day(s) | - | Hot dipped | H and L structural steel (steel thickness up to 24 mm), C structural steel (flange up to 20 mm) | ||
฿ 694.08 | PARTS FOR ELECTRIC FACILITIES | 1 Piece(s) | 6 Day(s) | - | Electrogalvanized | H and L structural steel (steel thickness up to 24 mm), C structural steel (flange up to 20 mm) | ||
฿ 554.98 | PARTS FOR ELECTRIC FACILITIES | 1 Piece(s) | 6 Day(s) | - | Electrogalvanized | H and L structural steel (steel thickness up to 24 mm), C structural steel (flange up to 20 mm) | ||
฿ 156.56 | PARTS FOR ELECTRIC FACILITIES | 1 Piece(s) | 6 Day(s) | - | Electrogalvanized | H and L structural steel (steel thickness up to 24 mm), C structural steel (flange up to 20 mm) | ||
฿ 207.01 | PARTS FOR ELECTRIC FACILITIES | 1 Piece(s) | 6 Day(s) | - | Electrogalvanized | H and L structural steel (steel thickness up to 24 mm), C structural steel (flange up to 20 mm) | ||
฿ 343.37 | PARTS FOR ELECTRIC FACILITIES | 1 Piece(s) | 6 Day(s) | - | Electrogalvanized | H and L structural steel (steel thickness up to 24 mm), C structural steel (flange up to 20 mm) | ||
฿ 121.25 | PARTS FOR ELECTRIC FACILITIES | 2 Piece(s) | 6 Day(s) | W 3/8 | Electrogalvanized | H and L structural steel (steel thickness up to 20 mm), C structural steel (flange up to 24 mm) | ||
฿ 173.83 | PARTS FOR ELECTRIC FACILITIES | 2 Piece(s) | 6 Day(s) | W 3/8 | Electrogalvanized | H and L structural steel (steel thickness up to 20 mm), C structural steel (flange up to 24 mm) | ||
฿ 195.73 | PARTS FOR ELECTRIC FACILITIES | 1 Piece(s) | 6 Day(s) | W 3/8 | Electrogalvanized | H and L structural steel (steel thickness up to 20 mm), C structural steel (flange up to 24 mm) | ||
฿ 179.63 | PARTS FOR ELECTRIC FACILITIES | 1 Piece(s) | 6 Day(s) | W1/2 | Electrogalvanized | H and L structural steel (steel thickness up to 20 mm), C structural steel (flange up to 24 mm) | ||
฿ 144.95 | PARTS FOR ELECTRIC FACILITIES | 1 Piece(s) | 6 Day(s) | W1/2 | Electrogalvanized | H and L structural steel (steel thickness up to 20 mm), C structural steel (flange up to 24 mm) |
Loading...
Type | Device Mounting Bracket |
---|
How can we improve?
How can we improve?