(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
[Features]
• JFE pipe fittings are produced at cutting-edge facilities with thorough quality control.
• Moreover, ring stamp PL fittings are coat-baked with powder epoxy resin on the inner and outer surfaces, excluding screws, using a special coating method, providing enhanced adhesiveness, corrosion resistance, etc.
• Can be used with a high level of reliability.
Part Number |
---|
U-B-1 |
U-B-1/2 |
U-B-1/4 |
U-B-2 |
U-B-3 |
U-B-3/4 |
U-B-3/8 |
U-B-4 |
U-B-5 |
U-B-6 |
U-B-11/2 |
U-B-11/4 |
U-B-21/2 |
U-W-1 |
U-W-1/2 |
U-W-1/4 |
U-W-2 |
U-W-3 |
U-W-3/4 |
U-W-3/8 |
U-W-4 |
U-W-5 |
U-W-6 |
U-W-11/2 |
U-W-11/4 |
U-W-21/2 |
Part Number | Price | Name | Minimum Order Qty. | Volume Discount | Days to Ship | Nominal of Thread M1 | Surface Treatment |
---|---|---|---|---|---|---|---|
฿ 421.72 | JFF PIPE SUPPORT | 1 Piece(s) | 7 Day(s) | 1B(25A) | No | ||
฿ 257.15 | JFF PIPE SUPPORT | 1 Piece(s) | 7 Day(s) | 1/2B(15A) | No | ||
฿ 300.58 | JFF PIPE SUPPORT | 1 Piece(s) | 7 Day(s) | 1/4B(8A) | No | ||
฿ 1,195.43 | JFF PIPE SUPPORT | 1 Piece(s) | 7 Day(s) | 2B(50A) | No | ||
฿ 3,206.48 | JFF PIPE SUPPORT | 1 Piece(s) | 7 Day(s) | 3B(80A) | No | ||
฿ 310.86 | JFF PIPE SUPPORT | 1 Piece(s) | 7 Day(s) | 3/4B(20A) | No | ||
฿ 300.58 | JFF PIPE SUPPORT | 1 Piece(s) | 7 Day(s) | 3/8B(10A) | No | ||
฿ 6,066.67 | JFF PIPE SUPPORT | 1 Piece(s) | 7 Day(s) | 4B(100A) | No | ||
฿ 12,559.24 | JFF PIPE SUPPORT | 1 Piece(s) | 7 Day(s) | 5B(125A) | No | ||
฿ 19,280.77 | JFF PIPE SUPPORT | 1 Piece(s) | 7 Day(s) | 6B(150A) | No | ||
฿ 804.58 | JFF PIPE SUPPORT | 1 Piece(s) | 7 Day(s) | 1 1/2B(40A) | No | ||
฿ 604.19 | JFF PIPE SUPPORT | 1 Piece(s) | 7 Day(s) | 1 1/4B(32A) | No | ||
฿ 2,513.15 | JFF PIPE SUPPORT | 1 Piece(s) | 7 Day(s) | 2 1/2B(65A) | No | ||
฿ 252.96 | JFF PIPE SUPPORT | 1 Piece(s) | 7 Day(s) | 1B(25A) | Zinc Plating | ||
฿ 150.55 | JFF PIPE SUPPORT | 1 Piece(s) | 7 Day(s) | 1/2B(15A) | Zinc Plating | ||
฿ 174.14 | JFF PIPE SUPPORT | 1 Piece(s) | 7 Day(s) | 1/4B(8A) | Zinc Plating | ||
฿ 717.34 | JFF PIPE SUPPORT | 1 Piece(s) | 7 Day(s) | 2B(50A) | Zinc Plating | ||
฿ 1,923.81 | JFF PIPE SUPPORT | 1 Piece(s) | 7 Day(s) | 3B(80A) | Zinc Plating | ||
฿ 179.58 | JFF PIPE SUPPORT | 1 Piece(s) | 7 Day(s) | 3/4B(20A) | Zinc Plating | ||
฿ 174.14 | JFF PIPE SUPPORT | 1 Piece(s) | 7 Day(s) | 3/8B(10A) | Zinc Plating | ||
฿ 3,785.53 | JFF PIPE SUPPORT | 1 Piece(s) | 7 Day(s) | 4B(100A) | Zinc Plating | ||
฿ 10,047.62 | JFF PIPE SUPPORT | 1 Piece(s) | 7 Day(s) | 5B(125A) | Zinc Plating | ||
฿ 15,424.77 | JFF PIPE SUPPORT | 1 Piece(s) | 7 Day(s) | 6B(150A) | Zinc Plating | ||
฿ 452.96 | JFF PIPE SUPPORT | 1 Piece(s) | 7 Day(s) | 1 1/2B(40A) | Zinc Plating | ||
฿ 353.53 | JFF PIPE SUPPORT | 1 Piece(s) | 7 Day(s) | 1 1/4B(32A) | Zinc Plating | ||
฿ 1,507.81 | JFF PIPE SUPPORT | 1 Piece(s) | 7 Day(s) | 2 1/2B(65A) | Zinc Plating |
Loading...
Connecting Shape | Union | Connection Type | Screw⇔Screw Same Diameter・Different Type | Material | Cast Iron |
---|---|---|---|---|---|
Connection Thread Type M1 | Rc | Applicable Fluid | Water / Air / Steam / Gas / Oil | Type | Fitting |
Max. Operating Pressure(MPa) | 1 | Divisions of Max. Operating Pressure | 1.0Mpa or Less | Interior Resin Lining | No |
Details of Max. Operating Pressure (Vapor/Air/Gas/Oil which is 300℃ or Less)(MPa) | 1.0 | Details of Max. Operating Pressure (Steady Flow which is 120℃ or Less)(MPa) | 2.5 |
How can we improve?
How can we improve?