1. No. of part number of this product, can see and select from the list here
2. Or select spec by configure tab until part number generated
3. Product information available in this area

(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.

    Sales
  • Viewed
    Products
  • My
    Components
  • Cart
Recently Viewed Products
X
My Components
X
Cart Item(s)
X
Loading...
  • แจ้งวันหยุดทำการในเดือน มิถุนายน 2567 | Notice holiday in June 2024 > คลิก

Screw-In Malleable Cast Iron Pipe Fitting, Union (Standard)

Screw-In Malleable Cast Iron Pipe Fitting, Union (Standard)
You can add up to 6 items per a category to the compare list.

Part Number :
  • From :
    ฿ 150.55/Unit
  • Qty :
  • Days to Ship :
    ---
  • Total Price :
    ---

Select part number to Order Now/ Add to Cart

  • CAD Data unavailable

Product Description

[Features]
• JFE pipe fittings are produced at cutting-edge facilities with thorough quality control.
• Moreover, ring stamp PL fittings are coat-baked with powder epoxy resin on the inner and outer surfaces, excluding screws, using a special coating method, providing enhanced adhesiveness, corrosion resistance, etc.
• Can be used with a high level of reliability.

 
Part Number
U-B-1
U-B-1/2
U-B-1/4
U-B-2
U-B-3
U-B-3/4
U-B-3/8
U-B-4
U-B-5
U-B-6
U-B-11/2
U-B-11/4
U-B-21/2
U-W-1
U-W-1/2
U-W-1/4
U-W-2
U-W-3
U-W-3/4
U-W-3/8
U-W-4
U-W-5
U-W-6
U-W-11/2
U-W-11/4
U-W-21/2
Part NumberPriceNameMinimum Order Qty.Volume DiscountDays to ShipNominal of Thread M1 Surface Treatment

฿ 421.72

JFF PIPE SUPPORT 1 Piece(s) 7 Day(s) 1B(25A)No

฿ 257.15

JFF PIPE SUPPORT 1 Piece(s) 7 Day(s) 1/2B(15A)No

฿ 300.58

JFF PIPE SUPPORT 1 Piece(s) 7 Day(s) 1/4B(8A)No

฿ 1,195.43

JFF PIPE SUPPORT 1 Piece(s) 7 Day(s) 2B(50A)No

฿ 3,206.48

JFF PIPE SUPPORT 1 Piece(s) 7 Day(s) 3B(80A)No

฿ 310.86

JFF PIPE SUPPORT 1 Piece(s) 7 Day(s) 3/4B(20A)No

฿ 300.58

JFF PIPE SUPPORT 1 Piece(s) 7 Day(s) 3/8B(10A)No

฿ 6,066.67

JFF PIPE SUPPORT 1 Piece(s) 7 Day(s) 4B(100A)No

฿ 12,559.24

JFF PIPE SUPPORT 1 Piece(s) 7 Day(s) 5B(125A)No

฿ 19,280.77

JFF PIPE SUPPORT 1 Piece(s) 7 Day(s) 6B(150A)No

฿ 804.58

JFF PIPE SUPPORT 1 Piece(s) 7 Day(s) 1 1/2B(40A)No

฿ 604.19

JFF PIPE SUPPORT 1 Piece(s) 7 Day(s) 1 1/4B(32A)No

฿ 2,513.15

JFF PIPE SUPPORT 1 Piece(s) 7 Day(s) 2 1/2B(65A)No

฿ 252.96

JFF PIPE SUPPORT 1 Piece(s) 7 Day(s) 1B(25A)Zinc Plating

฿ 150.55

JFF PIPE SUPPORT 1 Piece(s) 7 Day(s) 1/2B(15A)Zinc Plating

฿ 174.14

JFF PIPE SUPPORT 1 Piece(s) 7 Day(s) 1/4B(8A)Zinc Plating

฿ 717.34

JFF PIPE SUPPORT 1 Piece(s) 7 Day(s) 2B(50A)Zinc Plating

฿ 1,923.81

JFF PIPE SUPPORT 1 Piece(s) 7 Day(s) 3B(80A)Zinc Plating

฿ 179.58

JFF PIPE SUPPORT 1 Piece(s) 7 Day(s) 3/4B(20A)Zinc Plating

฿ 174.14

JFF PIPE SUPPORT 1 Piece(s) 7 Day(s) 3/8B(10A)Zinc Plating

฿ 3,785.53

JFF PIPE SUPPORT 1 Piece(s) 7 Day(s) 4B(100A)Zinc Plating

฿ 10,047.62

JFF PIPE SUPPORT 1 Piece(s) 7 Day(s) 5B(125A)Zinc Plating

฿ 15,424.77

JFF PIPE SUPPORT 1 Piece(s) 7 Day(s) 6B(150A)Zinc Plating

฿ 452.96

JFF PIPE SUPPORT 1 Piece(s) 7 Day(s) 1 1/2B(40A)Zinc Plating

฿ 353.53

JFF PIPE SUPPORT 1 Piece(s) 7 Day(s) 1 1/4B(32A)Zinc Plating

฿ 1,507.81

JFF PIPE SUPPORT 1 Piece(s) 7 Day(s) 2 1/2B(65A)Zinc Plating

Loading...

  1. 1

Basic Information

Connecting Shape Union Connection Type Screw⇔Screw Same Diameter・Different Type Material Cast Iron
Connection Thread Type M1 Rc Applicable Fluid Water / Air / Steam / Gas / Oil Type Fitting
Max. Operating Pressure(MPa) 1 Divisions of Max. Operating Pressure 1.0Mpa or Less Interior Resin Lining No
Details of Max. Operating Pressure (Vapor/Air/Gas/Oil which is 300℃ or Less)(MPa) 1.0 Details of Max. Operating Pressure (Steady Flow which is 120℃ or Less)(MPa) 2.5