(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
Brand-name products provided by MISUMI-VONA are carefully-selected from the products of Asian manufacturers and offered based on customers' needs. Please select the right item for your individual usage environment. A Korean manufacturer established in 1987. Excellent variations on cable carriers, making the price more affordable. A no waste design with a selectable number of link unit.
Part Number | Price | Name | Minimum Order Qty. | Volume Discount | Days to Ship | RoHS | Number of Divided Sections inside Carrier | Bending radius R (mm) | Number of Links | Required Physical Height H (mm) |
---|---|---|---|---|---|---|---|---|---|---|
฿ 9,915.48 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 113 | 140 | ||
฿ 9,999.87 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 114 | 140 | ||
฿ 10,083.87 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 115 | 140 | ||
฿ 10,168.65 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 116 | 140 | ||
฿ 10,252.65 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 117 | 140 | ||
฿ 10,337.03 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 118 | 140 | ||
฿ 10,421.03 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 119 | 140 | ||
฿ 10,505.81 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 120 | 140 | ||
฿ 10,589.81 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 121 | 140 | ||
฿ 10,673.42 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 122 | 140 | ||
฿ 10,758.19 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 123 | 140 | ||
฿ 10,842.19 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 124 | 140 | ||
฿ 10,926.97 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 125 | 140 | ||
฿ 11,010.58 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 126 | 140 | ||
฿ 11,095.35 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 127 | 140 | ||
฿ 11,179.35 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 128 | 140 | ||
฿ 11,264.13 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 129 | 140 | ||
฿ 11,347.74 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 130 | 140 | ||
฿ 11,432.52 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 131 | 140 | ||
฿ 11,516.52 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 132 | 140 | ||
฿ 11,601.29 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 133 | 140 | ||
฿ 11,684.90 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 134 | 140 | ||
฿ 11,769.68 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 135 | 140 | ||
฿ 11,853.68 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 136 | 140 | ||
฿ 11,938.45 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 137 | 140 | ||
฿ 12,022.06 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 138 | 140 | ||
฿ 12,106.84 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 139 | 140 | ||
฿ 12,190.84 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 140 | 140 | ||
฿ 12,275.23 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 141 | 140 | ||
฿ 12,359.23 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 142 | 140 | ||
฿ 12,444.00 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 143 | 140 | ||
฿ 12,528.00 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 144 | 140 | ||
฿ 12,612.39 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 145 | 140 | ||
฿ 12,696.39 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 146 | 140 | ||
฿ 12,781.16 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 147 | 140 | ||
฿ 12,865.16 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 148 | 140 | ||
฿ 12,949.55 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 149 | 140 | ||
฿ 13,033.55 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 150 | 140 | ||
฿ 13,118.32 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 151 | 140 | ||
฿ 13,202.32 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 152 | 140 | ||
฿ 13,286.71 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 153 | 140 | ||
฿ 13,370.71 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 154 | 140 | ||
฿ 13,455.48 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 155 | 140 | ||
฿ 13,539.48 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Not Provided] No | 50 | 156 | 140 | ||
฿ 2,671.74 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 23 | 140 | ||
฿ 2,787.10 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 24 | 140 | ||
฿ 2,876.90 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 25 | 140 | ||
฿ 2,967.48 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 26 | 140 | ||
฿ 3,082.84 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 27 | 140 | ||
฿ 3,173.42 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 28 | 140 | ||
฿ 3,263.23 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 29 | 140 | ||
฿ 3,378.19 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 30 | 140 | ||
฿ 3,469.16 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 31 | 140 | ||
฿ 3,558.97 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 32 | 140 | ||
฿ 3,674.71 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 33 | 140 | ||
฿ 3,764.90 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 34 | 140 | ||
฿ 3,855.48 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 35 | 140 | ||
฿ 3,970.45 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 36 | 140 | ||
฿ 4,061.03 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 37 | 140 | ||
฿ 4,151.23 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 38 | 140 | ||
฿ 4,266.19 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 39 | 140 | ||
฿ 4,356.77 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 40 | 140 | ||
฿ 4,446.97 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 41 | 140 | ||
฿ 4,562.71 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 42 | 140 | ||
฿ 4,652.52 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 43 | 140 | ||
฿ 4,428.77 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 44 | 140 | ||
฿ 4,536.39 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 45 | 140 | ||
฿ 4,620.00 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 46 | 140 | ||
฿ 4,704.77 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 47 | 140 | ||
฿ 4,812.39 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 48 | 140 | ||
฿ 4,897.16 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 49 | 140 | ||
฿ 4,980.77 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 50 | 140 | ||
฿ 5,089.16 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 51 | 140 | ||
฿ 5,173.16 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 52 | 140 | ||
฿ 5,257.55 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 53 | 140 | ||
฿ 5,365.16 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 54 | 140 | ||
฿ 5,449.16 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 55 | 140 | ||
฿ 5,533.94 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 56 | 140 | ||
฿ 5,641.16 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 57 | 140 | ||
฿ 5,725.94 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 58 | 140 | ||
฿ 5,809.94 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 59 | 140 | ||
฿ 5,917.55 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 60 | 140 | ||
฿ 6,001.94 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 61 | 140 | ||
฿ 6,085.94 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 62 | 140 | ||
฿ 6,194.32 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 63 | 140 | ||
฿ 6,278.32 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 64 | 140 | ||
฿ 6,362.71 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 65 | 140 | ||
฿ 6,470.32 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 66 | 140 | ||
฿ 6,555.10 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 67 | 140 | ||
฿ 6,639.10 | HNS CABLE CARRIER HSP | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 50 | 68 | 140 |
Loading...
Type | Square type | Cover Type | One Side Cover Type | Properties | Standard |
---|---|---|---|---|---|
Height of Inside(mm) | 24 | Width of Inside(mm) | 78 | Maximum Cable Outer Diameter(Ø) | 22 |
Operating Speed(m/s) | 3 | Link Pitch(mm) | 45 | Cable Insertion Surface | Outer Peripheral Surface |
Cable Insertion Type | Snap(Opening and Closing) | Motion Type | 2-Axis motion | Operating Temperature Range(°C) | -25::100 |
Carrier Material | Engineering Plastic | Note | One bracket is included for each of the fixed side and moving side |
How can we improve?
How can we improve?