(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
Can be connected easily and safely as welding and threading are not required. The certified products have a proven track record. Certified fireproof product (used for fire extinguishers) has size restrictions.
[Features]
· A set of G type (G-32E to G-150E) and stainless steel SB joints (elbows, tees, reducers).
· An SB joint is made of a pipe welded to the neck of a stainless steel pipe fitting to be butt-welded to a JIS G 3448- and SAS 354-compliant stainless steel pipe for general piping by using an automatic welding machine
Part Number | Price | Name | Minimum Order Qty. | Volume Discount | Days to Ship | Applicable Plumbing | Applicable Fluid | Nominal Diameter | Maximum Pressure Gas used [There are limites in the usage condition] (MPa) | Rubber Sleeve Material | Material of Bolt | Inner Plate | Fire-certified Products (For fire extinguishing equipment) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
฿ 2,745.70 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 9 Day(s) | Steel pipe / Stainless Steel Pipe | Water / Air / Chemical | 20A | 2 | EPDM | Black Harpoon Steel | No | Standard | ||
฿ 3,162.68 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 5 Day(s) | Steel pipe | Water / Air / Chemical | 20A | 2 | EPDM | Stainless Steel | No | Certified Products | ||
฿ 2,745.70 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 9 Day(s) | Steel pipe / Stainless Steel Pipe | Water / Air / Organic Gas / Oils and Fats | 20A | 2 | NBR | Black Harpoon Steel | No | Standard | ||
฿ 2,745.70 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 9 Day(s) | Steel pipe / Stainless Steel Pipe | Water / Air / Organic Gas / Oils and Fats | 20A | 2 | NBR | Stainless Steel | No | Standard | ||
฿ 2,812.22 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 9 Day(s) | Steel pipe / Stainless Steel Pipe | Water / Air / Chemical | 25A | 2 | EPDM | Black Harpoon Steel | No | Standard | ||
฿ 2,589.29 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 3 Day(s) | Steel pipe / Stainless Steel Pipe | Water / Air / Chemical | 25A | 2 | EPDM | Stainless Steel | No | Standard | ||
฿ 3,233.51 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 5 Day(s) | Steel pipe | Water / Air / Chemical | 25A | 2 | EPDM | Stainless Steel | No | Certified Products | ||
฿ 2,812.22 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 9 Day(s) | Steel pipe / Stainless Steel Pipe | Water / Air / Organic Gas / Oils and Fats | 25A | 2 | NBR | Black Harpoon Steel | No | Standard | ||
฿ 2,812.22 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 9 Day(s) | Steel pipe / Stainless Steel Pipe | Water / Air / Organic Gas / Oils and Fats | 25A | 2 | NBR | Stainless Steel | No | Standard | ||
฿ 2,969.44 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 14 Day(s) | Steel pipe / Stainless Steel Pipe | Water / Air / Chemical | 32A | 2 | EPDM | Black Harpoon Steel | No | Standard | ||
฿ 2,628.00 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 3 Day(s) | Steel pipe / Stainless Steel Pipe | Water / Air / Chemical | 32A | 2 | EPDM | Stainless Steel | No | Standard | ||
฿ 3,399.95 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 5 Day(s) | Steel pipe | Water / Air / Chemical | 32A | 2 | EPDM | Stainless Steel | No | Certified Products | ||
฿ 2,969.44 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 9 Day(s) | Steel pipe / Stainless Steel Pipe | Water / Air / Organic Gas / Oils and Fats | 32A | 2 | NBR | Black Harpoon Steel | No | Standard | ||
฿ 2,969.44 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 9 Day(s) | Steel pipe / Stainless Steel Pipe | Water / Air / Organic Gas / Oils and Fats | 32A | 2 | NBR | Stainless Steel | No | Standard | ||
฿ 3,029.91 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 9 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 40A | 2 | EPDM | Black Harpoon Steel | No | Standard | ||
฿ 2,666.71 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 3 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 40A | 2 | EPDM | Stainless Steel | No | Standard | ||
฿ 3,472.33 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 5 Day(s) | Steel pipe / PVC Pipe | Water / Air / Chemical | 40A | 2 | EPDM | Stainless Steel | No | Certified Products | ||
฿ 3,029.91 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 9 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 40A | 2 | NBR | Black Harpoon Steel | No | Standard | ||
฿ 3,029.91 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 9 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 40A | 2 | NBR | Stainless Steel | No | Standard | ||
฿ 3,217.37 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 9 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 50A | 2 | EPDM | Black Harpoon Steel | No | Standard | ||
฿ 2,705.42 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 3 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 50A | 2 | EPDM | Stainless Steel | No | Standard | ||
฿ 3,718.90 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 5 Day(s) | Steel pipe / PVC Pipe | Water / Air / Chemical | 50A | 2 | EPDM | Stainless Steel | No | Certified Products | ||
฿ 3,217.37 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 9 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 50A | 2 | NBR | Black Harpoon Steel | No | Standard | ||
฿ 3,217.37 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 9 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 50A | 2 | NBR | Stainless Steel | No | Standard | ||
฿ 4,130.47 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 9 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 65A | 2 | EPDM | Black Harpoon Steel | No | Standard | ||
฿ 3,840.00 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 4 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 65A | 2 | EPDM | Stainless Steel | No | Standard | ||
฿ 4,614.14 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 5 Day(s) | Steel pipe / PVC Pipe | Water / Air / Chemical | 65A | 2 | EPDM | Stainless Steel | No | Certified Products | ||
฿ 4,130.47 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 9 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 65A | 2 | NBR | Black Harpoon Steel | No | Standard | ||
฿ 4,130.47 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 9 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 65A | 2 | NBR | Stainless Steel | No | Standard | ||
฿ 4,475.15 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 9 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 80A | 2 | EPDM | Black Harpoon Steel | No | Standard | ||
฿ 4,539.81 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 6 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 80A | 2 | EPDM | Stainless Steel | No | Standard | ||
฿ 4,986.66 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 5 Day(s) | Steel pipe / PVC Pipe | Water / Air / Chemical | 80A | 2 | EPDM | Stainless Steel | No | Certified Products | ||
฿ 4,475.15 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 9 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 80A | 2 | NBR | Black Harpoon Steel | No | Standard | ||
฿ 4,475.15 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 9 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 80A | 2 | NBR | Stainless Steel | No | Standard | ||
฿ 4,886.35 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 9 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 100A | 2 | EPDM | Black Harpoon Steel | No | Standard | ||
฿ 4,886.35 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 5 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 100A | 2 | EPDM | Stainless Steel | No | Standard | ||
฿ 5,426.92 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 5 Day(s) | Steel pipe / PVC Pipe | Water / Air / Chemical | 100A | 2 | EPDM | Stainless Steel | No | Certified Products | ||
฿ 4,886.35 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 9 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 100A | 2 | NBR | Black Harpoon Steel | No | Standard | ||
฿ 4,886.35 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 9 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 100A | 2 | NBR | Stainless Steel | No | Standard | ||
฿ 7,528.90 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 9 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 125A | 2 | EPDM | Black Harpoon Steel | No | Standard | ||
฿ 7,528.90 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 6 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 125A | 2 | EPDM | Stainless Steel | No | Standard | ||
฿ 8,237.88 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 5 Day(s) | Steel pipe / PVC Pipe | Water / Air / Chemical | 125A | 2 | EPDM | Stainless Steel | No | Certified Products | ||
฿ 7,528.90 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 9 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 125A | 2 | NBR | Black Harpoon Steel | No | Standard | ||
฿ 7,528.90 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 9 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 125A | 2 | NBR | Stainless Steel | No | Standard | ||
฿ 9,034.61 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 9 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 150A | 2 | EPDM | Black Harpoon Steel | No | Standard | ||
฿ 9,034.61 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 6 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 150A | 2 | EPDM | Stainless Steel | No | Standard | ||
฿ 9,897.24 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 5 Day(s) | Steel pipe / PVC Pipe | Water / Air / Chemical | 150A | 2 | EPDM | Stainless Steel | No | Certified Products | ||
฿ 9,034.61 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 9 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 150A | 2 | NBR | Black Harpoon Steel | No | Standard | ||
฿ 9,034.61 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 9 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 150A | 2 | NBR | Stainless Steel | No | Standard | ||
฿ 16,775.63 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 7 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 200A | 1.6 | EPDM | Black Harpoon Steel | No | Standard | ||
฿ 16,775.63 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 5 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 200A | 1.6 | EPDM | Stainless Steel | No | Standard | ||
฿ 22,190.41 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 5 Day(s) | Steel pipe / PVC Pipe | Water / Air / Chemical | 200A | 1.6 | EPDM | Stainless Steel | No | Certified Products | ||
฿ 16,775.63 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 7 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 200A | 1.6 | NBR | Black Harpoon Steel | No | Standard | ||
฿ 16,775.63 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 5 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 200A | 1.6 | NBR | Stainless Steel | No | Standard | ||
฿ 26,128.91 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 5 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 250A | 1.6 | EPDM | Stainless Steel | No | Standard | ||
฿ 26,128.91 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 5 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 250A | 1.6 | NBR | Stainless Steel | No | Standard | ||
฿ 29,813.54 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 5 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 300A | 1.4 | EPDM | Stainless Steel | No | Standard | ||
฿ 29,813.54 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 5 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 300A | 1.4 | NBR | Stainless Steel | No | Standard | ||
฿ 33,724.91 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 5 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 350A | 1.2 | EPDM | Stainless Steel | No | Standard | ||
฿ 33,724.91 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 5 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 350A | 1.2 | NBR | Stainless Steel | No | Standard | ||
฿ 38,316.52 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 5 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 400A | 1.0 | EPDM | Stainless Steel | No | Standard | ||
฿ 38,316.52 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 5 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 400A | 1.0 | NBR | Stainless Steel | No | Standard | ||
฿ 2,915.02 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 16 Day(s) | Steel pipe / Stainless Steel Pipe | Water / Air / Chemical | 20A | 2 | EPDM | Stainless Steel | Equipped Products | Standard | ||
฿ 2,915.02 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 16 Day(s) | Steel pipe / Stainless Steel Pipe | Water / Air / Organic Gas / Oils and Fats | 20A | 2 | NBR | Stainless Steel | Equipped Products | Standard | ||
฿ 3,017.82 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 16 Day(s) | Steel pipe / Stainless Steel Pipe | Water / Air / Chemical | 25A | 2 | EPDM | Stainless Steel | Equipped Products | Standard | ||
฿ 3,017.82 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 16 Day(s) | Steel pipe / Stainless Steel Pipe | Water / Air / Organic Gas / Oils and Fats | 25A | 2 | NBR | Stainless Steel | Equipped Products | Standard | ||
฿ 3,175.04 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 16 Day(s) | Steel pipe / Stainless Steel Pipe | Water / Air / Chemical | 32A | 2 | EPDM | Stainless Steel | Equipped Products | Standard | ||
฿ 3,175.04 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 16 Day(s) | Steel pipe / Stainless Steel Pipe | Water / Air / Organic Gas / Oils and Fats | 32A | 2 | NBR | Stainless Steel | Equipped Products | Standard | ||
฿ 3,259.70 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 16 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 40A | 2 | EPDM | Stainless Steel | Equipped Products | Standard | ||
฿ 3,259.70 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 16 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 40A | 2 | NBR | Stainless Steel | Equipped Products | Standard | ||
฿ 3,447.16 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 16 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 50A | 2 | EPDM | Stainless Steel | Equipped Products | Standard | ||
฿ 3,447.16 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 16 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 50A | 2 | NBR | Stainless Steel | Equipped Products | Standard | ||
฿ 4,402.59 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 16 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 65A | 2 | EPDM | Stainless Steel | Equipped Products | Standard | ||
฿ 4,402.59 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 16 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 65A | 2 | NBR | Stainless Steel | Equipped Products | Standard | ||
฿ 4,765.41 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 16 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 80A | 2 | EPDM | Stainless Steel | Equipped Products | Standard | ||
฿ 4,765.41 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 16 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 80A | 2 | NBR | Stainless Steel | Equipped Products | Standard | ||
฿ 5,231.03 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 16 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 100A | 2 | EPDM | Stainless Steel | Equipped Products | Standard | ||
฿ 5,231.03 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 16 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 100A | 2 | NBR | Stainless Steel | Equipped Products | Standard | ||
฿ 7,891.72 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 16 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 125A | 2 | EPDM | Stainless Steel | Equipped Products | Standard | ||
฿ 7,891.72 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 16 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 125A | 2 | NBR | Stainless Steel | Equipped Products | Standard | ||
฿ 9,433.72 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 16 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 150A | 2 | EPDM | Stainless Steel | Equipped Products | Standard | ||
฿ 9,433.72 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 16 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 150A | 2 | NBR | Stainless Steel | Equipped Products | Standard | ||
฿ 20,971.44 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 16 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 200A | 1.6 | EPDM | Stainless Steel | Equipped Products | Standard | ||
฿ 20,971.44 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 16 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 200A | 1.6 | NBR | Stainless Steel | Equipped Products | Standard | ||
฿ 40,227.05 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 16 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 250A | 1.6 | EPDM | Stainless Steel | Equipped Products | Standard | ||
฿ 40,227.05 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 16 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 250A | 1.6 | NBR | Stainless Steel | Equipped Products | Standard | ||
฿ 46,512.77 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 16 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 300A | 1.4 | EPDM | Stainless Steel | Equipped Products | Standard | ||
฿ 46,512.77 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 16 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 300A | 1.4 | NBR | Stainless Steel | Equipped Products | Standard | ||
฿ 58,448.77 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 16 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 350A | 1.2 | EPDM | Stainless Steel | Equipped Products | Standard | ||
฿ 58,448.77 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 16 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 350A | 1.2 | NBR | Stainless Steel | Equipped Products | Standard |
Loading...
Type | Joint | Casing Material | SUS304 | Tightening Bolt Type | Hexagon socket head bolt |
---|
How can we improve?
How can we improve?