(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
- Rolled Ball Screws Standard Nut - Shaft Dia. 10; Lead 2, 4, 10 - Accuracy Grade C7, C10 from MISUMI.
- The Rolled Ball Screws have a shaft diameter of 10 mm and are available in three different lead sizes: 2mm, 4mm, or 10mm.
- The accuracy grade options for this product are C7 and C10.
- The overall length of the shaft screw can be customized to fit a range of configurations, from 150mm to 585mm, in 1mm increments.
- The lead twisting direction for this product is right-handed.
- The screw shaft is made of S55C while the nut is made of SCM420.
Part Number |
---|
BSSR1002-[150-595/1] |
BSSR1002G-[150-595/1] |
BSSR1002L-[150-595/1] |
BSSR1004-[150-600/1] |
BSSR1004G-[150-600/1] |
BSSR1004L-[150-600/1] |
BSSR1010-[150-595/1] |
BSSR1010G-[150-595/1] |
BSSR1010L-[150-595/1] |
BSSRK1002-[150-595/1]-F[10-18/1]-P[5,6] |
BSSRK1002G-[150-595/1]-F[10-18/1]-P[5,6] |
BSSRK1002L-[150-595/1]-F[10-18/1]-P[5,6] |
BSSRK1004-[150-600/1]-F[10-18/1]-P[5,6] |
BSSRK1004G-[150-600/1]-F[10-18/1]-P[5,6] |
BSSRK1004L-[150-600/1]-F[10-18/1]-P[5,6] |
BSSRK1010-[150-595/1]-F[10-18/1]-P[5,6] |
BSSRK1010G-[150-595/1]-F[10-18/1]-P[5,6] |
BSSRK1010L-[150-595/1]-F[10-18/1]-P[5,6] |
BSST1004-[150-595/1] |
BSST1004G-[150-595/1] |
BSST1004L-[150-595/1] |
BSSZ1004-[150-600/1] |
BSSZ1004G-[150-600/1] |
BSSZ1004L-[150-600/1] |
BSSZK1004-[150-600/1]-F[10-18/1]-P5 |
BSSZK1004-[150-600/1]-F[10-18/1]-P6 |
BSSZK1004G-[150-600/1]-F[10-18/1]-P[5,6] |
BSSZK1004L-[150-600/1]-F[10-18/1]-P[5,6] |
Part Number | Price | Name | Minimum Order Qty. | Volume Discount | Days to Ship | RoHS | Accuracy Grade | Lead (mm) | Axial Play | Number of Circuits (Num. of Rows) x (Num. of Turns) | Shaft Screw Overall Length L (mm) | Basic Load Rating: Dynamic Load (N) | Basic Load Rating: Static Load (N) | Grease Type | Shaft End Length F (mm) | Shaft Dia. P (Ø) | Screw Shaft Surface Treatment | Shaft End Dimension (Selectable, Configurable) | Shaft Dia. P (φ) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
- | BALL SCREW | 1 Piece(s) | 5 Day(s) | 10 | C10 | 2 | 0.05 or Less | 1 x 2.5 | 150 ~ 595 | 1700 | 3000 | Standard | 10 | 6 | Phosphate Conversion Coating | Selectable | - | ||
- | BALL SCREW | 1 Piece(s) | 7 Day(s) | 10 | C10 | 2 | 0.05 or Less | 1 x 2.5 | 150 ~ 595 | 1700 | 3000 | Type G | 10 | 6 | Phosphate Conversion Coating | Selectable | - | ||
- | BALL SCREW | 1 Piece(s) | 7 Day(s) | 10 | C10 | 2 | 0.05 or Less | 1 x 2.5 | 150 ~ 595 | 1700 | 3000 | Type L | 10 | 6 | Phosphate Conversion Coating | Selectable | - | ||
- | BALL SCREW | 1 Piece(s) | 5 Day(s) | 10 | C10 | 4 | 0.05 or Less | 1 x 2.5 | 150 ~ 600 | 2300 | 4800 | Standard | 10 | 6 | Phosphate Conversion Coating | Selectable | - | ||
- | BALL SCREW | 1 Piece(s) | 7 Day(s) | 10 | C10 | 4 | 0.05 or Less | 1 x 2.5 | 150 ~ 600 | 2300 | 4800 | Type G | 10 | 6 | Phosphate Conversion Coating | Selectable | - | ||
- | BALL SCREW | 1 Piece(s) | 7 Day(s) | 10 | C10 | 4 | 0.05 or Less | 1 x 2.5 | 150 ~ 600 | 2300 | 4800 | Type L | 10 | 6 | Phosphate Conversion Coating | Selectable | - | ||
- | BALL SCREW | 1 Piece(s) | 5 Day(s) | 10 | C10 | 10 | 0.05 or Less | 1 x 1.5 | 150 ~ 595 | 1850 | 3200 | Standard | 10 | 6 | Phosphate Conversion Coating | Selectable | - | ||
- | BALL SCREW | 1 Piece(s) | 7 Day(s) | 10 | C10 | 10 | 0.05 or Less | 1 x 1.5 | 150 ~ 595 | 1850 | 3200 | Type G | 10 | 6 | Phosphate Conversion Coating | Selectable | - | ||
- | BALL SCREW | 1 Piece(s) | 7 Day(s) | 10 | C10 | 10 | 0.05 or Less | 1 x 1.5 | 150 ~ 595 | 1850 | 3200 | Type L | 10 | 6 | Phosphate Conversion Coating | Selectable | - | ||
- | BALL SCREW | 1 Piece(s) | 5 Day(s) | 10 | C10 | 2 | 0.05 or Less | 1 x 2.5 | 150 ~ 595 | 1700 | 3000 | Standard | 10 ~ 18 | - | Phosphate Conversion Coating | Configurable | 5 ~ 6 | ||
- | BALL SCREW | 1 Piece(s) | 7 Day(s) | 10 | C10 | 2 | 0.05 or Less | 1 x 2.5 | 150 ~ 595 | 1700 | 3000 | Type G | 10 ~ 18 | - | Phosphate Conversion Coating | Configurable | 5 ~ 6 | ||
- | BALL SCREW | 1 Piece(s) | 7 Day(s) | 10 | C10 | 2 | 0.05 or Less | 1 x 2.5 | 150 ~ 595 | 1700 | 3000 | Type L | 10 ~ 18 | - | Phosphate Conversion Coating | Configurable | 5 ~ 6 | ||
- | BALL SCREW | 1 Piece(s) | 5 Day(s) | 10 | C10 | 4 | 0.05 or Less | 1 x 2.5 | 150 ~ 600 | 2300 | 4800 | Standard | 10 ~ 18 | - | Phosphate Conversion Coating | Configurable | 5 ~ 6 | ||
- | BALL SCREW | 1 Piece(s) | 7 Day(s) | 10 | C10 | 4 | 0.05 or Less | 1 x 2.5 | 150 ~ 600 | 2300 | 4800 | Type G | 10 ~ 18 | - | Phosphate Conversion Coating | Configurable | 5 ~ 6 | ||
- | BALL SCREW | 1 Piece(s) | 7 Day(s) | 10 | C10 | 4 | 0.05 or Less | 1 x 2.5 | 150 ~ 600 | 2300 | 4800 | Type L | 10 ~ 18 | - | Phosphate Conversion Coating | Configurable | 5 ~ 6 | ||
- | BALL SCREW | 1 Piece(s) | 5 Day(s) | 10 | C10 | 10 | 0.05 or Less | 1 x 1.5 | 150 ~ 595 | 1850 | 3200 | Standard | 10 ~ 18 | - | Phosphate Conversion Coating | Configurable | 5 ~ 6 | ||
- | BALL SCREW | 1 Piece(s) | 7 Day(s) | 10 | C10 | 10 | 0.05 or Less | 1 x 1.5 | 150 ~ 595 | 1850 | 3200 | Type G | 10 ~ 18 | - | Phosphate Conversion Coating | Configurable | 5 ~ 6 | ||
- | BALL SCREW | 1 Piece(s) | 7 Day(s) | 10 | C10 | 10 | 0.05 or Less | 1 x 1.5 | 150 ~ 595 | 1850 | 3200 | Type L | 10 ~ 18 | - | Phosphate Conversion Coating | Configurable | 5 ~ 6 | ||
- | BALL SCREW | 1 Piece(s) | 5 Day(s) | 10 | C7 | 4 | 0.030 or Less | 1 x 2.5 | 150 ~ 595 | 2300 | 4800 | Standard | 10 | 6 | Not Provided | Selectable | - | ||
- | BALL SCREW | 1 Piece(s) | 7 Day(s) | 10 | C7 | 4 | 0.030 or Less | 1 x 2.5 | 150 ~ 595 | 2300 | 4800 | Type G | 10 | 6 | Not Provided | Selectable | - | ||
- | BALL SCREW | 1 Piece(s) | 7 Day(s) | 10 | C7 | 4 | 0.030 or Less | 1 x 2.5 | 150 ~ 595 | 2300 | 4800 | Type L | 10 | 6 | Not Provided | Selectable | - | ||
- | BALL SCREW | 1 Piece(s) | 5 Day(s) | 10 | C10 | 4 | 0.05 or Less | 1 x 2.5 | 150 ~ 600 | 2300 | 4800 | Standard | 10 | 6 | Not Provided | Selectable | - | ||
- | BALL SCREW | 1 Piece(s) | 7 Day(s) | 10 | C10 | 4 | 0.05 or Less | 1 x 2.5 | 150 ~ 600 | 2300 | 4800 | Type G | 10 | 6 | Not Provided | Selectable | - | ||
- | BALL SCREW | 1 Piece(s) | 7 Day(s) | 10 | C10 | 4 | 0.05 or Less | 1 x 2.5 | 150 ~ 600 | 2300 | 4800 | Type L | 10 | 6 | Not Provided | Selectable | - | ||
- | BALL SCREW | 1 Piece(s) | 5 Day(s) | 10 | C10 | 4 | 0.05 or Less | 1 x 2.5 | 150 ~ 600 | 2300 | 4800 | Standard | 10 ~ 18 | - | Not Provided | Configurable | 5 | ||
- | BALL SCREW | 1 Piece(s) | 5 Day(s) | 10 | C10 | 4 | 0.05 or Less | 1 x 2.5 | 150 ~ 600 | 2300 | 4800 | Standard | 10 ~ 18 | - | Not Provided | Configurable | 6 | ||
- | BALL SCREW | 1 Piece(s) | 7 Day(s) | 10 | C10 | 4 | 0.05 or Less | 1 x 2.5 | 150 ~ 600 | 2300 | 4800 | Type G | 10 ~ 18 | - | Not Provided | Configurable | 5 ~ 6 | ||
- | BALL SCREW | 1 Piece(s) | 7 Day(s) | 10 | C10 | 4 | 0.05 or Less | 1 x 2.5 | 150 ~ 600 | 2300 | 4800 | Type L | 10 ~ 18 | - | Not Provided | Configurable | 5 ~ 6 |
Loading...
Type | Rolled | Nut Type | Standard Nut | Flange Shape | Round Shape, 2 Set Screw Flats at both ends |
---|---|---|---|---|---|
Screw Shaft O.D.(Ø) | 10 | Preload | Not Preloaded | Operating Condition | Standard |
Twisting Direction | Right | Nut Structure | Single | Recirculating Method | Tube Type |
Nut Size | Standard |
How can we improve?
How can we improve?