(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Brand |
|
---|---|
Filter By |
|
CAD |
|
Days to Ship |
|
Pipe Manifolds - 1 Way Female Threaded Type
MISUMI
Days to Ship: Same day |
Pipe Manifolds - Socket Confi gurable Type
MISUMI
Days to Ship: 9 Day(s) |
JFEPIPEFITTING
From: ฿ 100.00 |
---|
Days to Ship: Quote |
Stainless Steel Products, SFH Type Header Rc Thread
ONDASEISAKUSYO
From: ฿ 883.15 |
---|
Special Price |
Days to Ship: Same day |
MISUMI
Days to Ship: 5 Day(s) |
CHIYODA
From: ฿ 952.81 |
---|
Days to Ship: 8 Day(s) |
[Clean & Pack]Pipe Manifold - 1 Way, Both Ends Male Threaded
MISUMI
·Degreasing (Anti-rust single packing) | : Part Number SL-□□ |
·Precision cleaning (Degassing double packing) | : Part Number SH-□□ |
·Electrolytic polishing + precision cleaning (Degassing double packing) | : Part Number SHD-□□ |
Product Part Number | Cleaning Method | Packaging Type | Effects Compared to Uncleaned Product | Environment (Standard) | Process |
SL-□□ | Degreasing | Anti-rust packing | Oil removal | General environment | Regular assembly process |
Post battery assembly process | |||||
SH-□□ | Precision cleaning | Degassing double packing | Oil removal Dust removal | Clean environment (Class 10 to 1,000) | Battery assembly process |
LCD-related post assembly process | |||||
In-vehicle camera assembly process | |||||
SHD-□□ | Electrolytic polishing + precision cleaning | Degassing double packing | Oil removal Dust removal Outgas reduction | Vacuum environment Clean environment (Class 10 to 1,000) | Pre-semiconductor process |
Liquid crystal deposition process | |||||
Pre-OLED process |
Days to Ship: 11 Day(s) |
Pipe Manifolds - 1 Way Male Threaded Type
MISUMI
Days to Ship: 9 Day(s) |
ONDASEISAKUSYO
From: ฿ 1,730.71 |
---|
Days to Ship: 8 Day(s) |
Pipe Manifolds - 2 Way Type (180° & 90°)
MISUMI
Days to Ship: 7 Day(s) |
Pipe Manifolds - 2 Way 90° Type
MISUMI
Days to Ship: 9 Day(s) |
Free Joing 3 Touch Connector type
CHIYODA
From: ฿ 1,392.19 |
---|
Days to Ship: 8 Day(s) |
CHIYODA
From: ฿ 4,282.95 |
---|
Days to Ship: 8 Day(s) |
Brand |
---|
Product Series |
CAD |
From |
Days to Ship |
Piping - Screw Nominal - 2nd Fitting |
Environmentally friendly |
Number of Branch Holes |
Characteristics/Applications |
Multipoint Connection - Screw Nominal |
Material |
Piping - Screw Nominal - 1st Fitting |
Type |
Pipe Opening Type |
Surface Treatment |
Piping Type - 1st Fitting |
Piping Type – 2nd Fitting |
Multipoint Connection Type |
Multipoint Connection - Applicable Tube O.D.(Ø) |
Fitting Type |
Cleaning Method |
You can add up to 6 items per a category to the compare list. | You can add up to 6 items per a category to the compare list. | You can add up to 6 items per a category to the compare list. | You can add up to 6 items per a category to the compare list. | You can add up to 6 items per a category to the compare list. | You can add up to 6 items per a category to the compare list. | You can add up to 6 items per a category to the compare list. | You can add up to 6 items per a category to the compare list. | You can add up to 6 items per a category to the compare list. | You can add up to 6 items per a category to the compare list. | You can add up to 6 items per a category to the compare list. | You can add up to 6 items per a category to the compare list. | You can add up to 6 items per a category to the compare list. | You can add up to 6 items per a category to the compare list. | |
Brand | MISUMI | MISUMI | JFEPIPEFITTING | ONDASEISAKUSYO | MISUMI | CHIYODA | MISUMI | MISUMI | ONDASEISAKUSYO | CK KINZOKU | MISUMI | MISUMI | CHIYODA | CHIYODA |
Product Series | [Clean & Pack]Pipe Manifold - 1 Way, Both Ends Male Threaded | |||||||||||||
CAD |
|
|
|
|
|
|
|
|
|
|
|
| ||
From | ฿ 100.00 | ฿ 883.15 Special Price On Sale Until 31/03/2025 | ฿ 952.81 | ฿ 1,730.71 | ฿ 1,641.29 | ฿ 1,392.19 | ฿ 4,282.95 | |||||||
Days to Ship | Same day | 9 Day(s) | Quote | Same day | 5 Day(s) | 8 Day(s) | 11 Day(s) | 9 Day(s) | 8 Day(s) | 5 Day(s) | 7 Day(s) | 9 Day(s) | 8 Day(s) | 8 Day(s) |
Piping - Screw Nominal - 2nd Fitting | 1B ~ 3/4B | 1B ~ 3/4B | 3/4B | 3/4B | 1 1/4B ~ 1/2B | 1/4B ~ 3/8B | 1B ~ 3/4B | 1B ~ 3/4B | 1B ~ 3/4B | - | 1B ~ 3/4B | 1B ~ 3/4B | 1/4B ~ 1/8B | 3/8B |
Environmentally friendly | - | - | - | - | - | - | RoHS Compliant (10 Substances) | - | - | - | - | - | - | - |
Number of Branch Holes | 2 ~ 6 | 2 ~ 5 | 2 ~ 5 | 2 ~ 7 | 1 ~ 12 | 2 ~ 5 | 2 ~ 6 | 2 ~ 6 | 4 ~ 6 | 3 | 2 ~ 6 | 2 ~ 6 | 2 ~ 4 | 10 |
Characteristics/Applications | - | - | - | - | - | - | Clean Washed | - | - | - | - | - | - | - |
Multipoint Connection - Screw Nominal | 1B ~ 3/8B | - | 1/2B | 1/2B | 1/4B ~ M5 | 1/2B ~ 3/8B | 1/2B ~ 3/8B | 1/2B ~ 3/8B | 1/2B | 1/2B | 1/2B ~ 3/8B | 1/2B ~ 3/8B | - | - |
Material | Stainless Steel / Steel | Stainless Steel / Steel | Steel | Stainless Steel | Stainless Steel / Steel | Copper Alloy | Stainless Steel | Stainless Steel / Steel | Copper Alloy | Copper Alloy | Stainless Steel / Steel | Stainless Steel / Steel | Copper Alloy | Copper Alloy |
Piping - Screw Nominal - 1st Fitting | 1B ~ 3/4B | 1B ~ 3/4B | 3/4B | 3/4B | 1 1/4B ~ 1/2B | 1/2B ~ 3/8B | 1B ~ 3/4B | 1B ~ 3/4B | 1B ~ 3/4B | 3/4B | 1B ~ 3/4B | 1B ~ 3/4B | 1/4B ~ 3/8B | 3/8B |
Type | Pipe Manifolds | Pipe Manifolds | Pipe Manifolds | Pipe Manifolds | Pipe Manifolds | Pipe Manifolds | Pipe Manifolds | Pipe Manifolds | Pipe Manifolds | Pipe Manifolds | Pipe Manifolds | Pipe Manifolds | Pipe Manifolds | Pipe Manifolds |
Pipe Opening Type | Stationary | Stationary | Stationary | Stationary | Stationary | Rotation | Stationary | Stationary | Stationary | Stationary | Stationary | Stationary | Rotation | Coupling Type (Set) |
Surface Treatment | - | Trivalent Chromate / Nickel Plating | Zinc Plating | - | - | - | Not Provided | - | - | Not Provided | - | - | - | - |
Piping Type - 1st Fitting | Rc/R Thread | Rc/R Thread | Rc/R Thread | Rc/R Thread | Rc/R Thread | Rc/R Thread | Rc/R Thread | Rc/R Thread | Rc/R Thread | Rc/R Thread | Rc/R Thread | Rc/R Thread | Rc/R Thread | Rc/R Thread |
Piping Type – 2nd Fitting | Rc/R Thread | Rc/R Thread | Rc/R Thread | Rc/R Thread | Rc/R Thread | Rc/R Thread | Rc/R Thread | Rc/R Thread | Rc/R Thread | - | Rc/R Thread | Rc/R Thread | Rc/R Thread | Rc/R Thread |
Multipoint Connection Type | Rc/R Thread | Rc/R Thread | Rc/R Thread | Rc/R Thread | M Thread ~ Rc/R Thread | Rc/R Thread | Rc/R Thread | Rc/R Thread | Rc/R Thread | - | Rc/R Thread | Rc/R Thread | - | - |
Multipoint Connection - Applicable Tube O.D.(Ø) | - | - | - | - | - | - | - | - | - | - | - | - | 6 | 8 |
Fitting Type | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
Cleaning Method | - | - | - | - | - | - | Degreasing / Precision Cleaning / Electrolytic Polishing + Precision Cleaning | - | - | - | - | - | - | - |
Loading...
How can we improve?
How can we improve?