(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Brand |
|
---|---|
CAD |
|
C-Cutter Mini, 1-Flute Front-Chamfering Type
BIG DAISHOWA SEIKI
From: ฿ 4,239.44 |
---|
Days to Ship: |
C-Cutter Mini, Multi-Flute Front/Back-Chamfering Type
BIG DAISHOWA SEIKI
From: ฿ 5,801.33 |
---|
Days to Ship: |
BIG DAISHOWA SEIKI
From: ฿ 4,477.04 |
---|
Days to Ship: |
BIG DAISHOWA SEIKI
From: ฿ 4,346.31 |
---|
Days to Ship: |
BIG DAISHOWA SEIKI
From: ฿ 6,749.40 |
---|
Days to Ship: |
C-Cutter Mini, Tap and Bolt Hole Type
BIG DAISHOWA SEIKI
From: ฿ 7,363.23 |
---|
Days to Ship: |
BIG DAISHOWA SEIKI
From: ฿ 5,590.27 |
---|
Days to Ship: |
High speed coating for Center Boy throwaway bit【5 Pieces Per Package】
BIG DAISHOWA SEIKI
From: ฿ 4,849.51 |
---|
Days to Ship: |
C-Cutter Mini, 1-Flute Front/Back-Chamfering Type
BIG DAISHOWA SEIKI
From: ฿ 4,239.44 |
---|
Days to Ship: |
BIG DAISHOWA SEIKI
From: ฿ 1,550.00 |
---|
Days to Ship: |
R-Cutter Front/Back Round Chamfer
BIG DAISHOWA SEIKI
From: ฿ 6,645.60 |
---|
Days to Ship: |
Brand |
---|
Product Series |
From |
Days to Ship |
Tool Material Type |
Tool Diameter (D)(mm) |
Tip angle (θ) |
Application |
work material |
Single blade, two blades |
Peripheral Blade Y/N |
Coating Y/N |
Coating Type |
R Size (R)(mm) |
You can add up to 6 items per a category to the compare list. | You can add up to 6 items per a category to the compare list. | You can add up to 6 items per a category to the compare list. | You can add up to 6 items per a category to the compare list. | You can add up to 6 items per a category to the compare list. | You can add up to 6 items per a category to the compare list. | You can add up to 6 items per a category to the compare list. | You can add up to 6 items per a category to the compare list. | You can add up to 6 items per a category to the compare list. | You can add up to 6 items per a category to the compare list. | You can add up to 6 items per a category to the compare list. | |
Brand | BIG DAISHOWA SEIKI | BIG DAISHOWA SEIKI | BIG DAISHOWA SEIKI | BIG DAISHOWA SEIKI | BIG DAISHOWA SEIKI | BIG DAISHOWA SEIKI | BIG DAISHOWA SEIKI | BIG DAISHOWA SEIKI | BIG DAISHOWA SEIKI | BIG DAISHOWA SEIKI | BIG DAISHOWA SEIKI |
Product Series | High speed coating for Center Boy throwaway bit【5 Pieces Per Package】 | ||||||||||
From | ฿ 4,239.44 | ฿ 5,801.33 | ฿ 4,477.04 | ฿ 4,346.31 | ฿ 6,749.40 | ฿ 7,363.23 | ฿ 5,590.27 | ฿ 4,849.51 | ฿ 4,239.44 | ฿ 1,550.00 | ฿ 6,645.60 |
Days to Ship | 3 Day(s) | 3 Day(s) | 3 Day(s) | 3 Day(s) | 3 Day(s) | 7 Day(s) | 5 Day(s) | Same day | 5 Day(s) | 9 Day(s) | 9 Day(s) |
Tool Material Type | - | - | High-speed steel | - | - | - | - | High-speed steel | - | - | - |
Tool Diameter (D)(mm) | - | - | - | - | - | - | - | - | - | - | - |
Tip angle (θ) | 30 ~ 60 | 45° | 90 ~ 120 | 5~85 ~ 60 | 45 | 45° | 45° | 90 | 45° | 45° | 45° |
Application | Chamfering/Horizontal | Hole Chamfer | Centering (Positioning) / Hole Chamfer | Chamfering/Horizontal | Chamfering/Horizontal | Hole Chamfer | Round Chamfer | Centering (Positioning) / Hole Chamfer | Chamfering/Horizontal | Round Chamfer | Chamfering/Horizontal / Round Chamfer |
work material | - | - | general steel[○] / Cast Iron[○] / Aluminum[○] / Copper[○] | - | general steel[○] / Cast Iron[○] / Aluminum[○] | - | - | general steel[○] / Cast Iron[○] / Aluminum[○] / Copper[○] | - | general steel[○] / Quenched and tempered steel[○] / Cast Iron[○] / Aluminum[○] | general steel[○] / Quenched and tempered steel[○] / Cast Iron[○] / Aluminum[○] / Copper[○] |
Single blade, two blades | - | - | - | - | - | - | - | - | - | Single blade | - |
Peripheral Blade Y/N | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA |
Coating Y/N | - | - | Available | - | - | - | - | Available | - | Available | - |
Coating Type | - | - | TiN | - | - | - | - | TiN | - | Other | - |
R Size (R)(mm) | - | - | - | - | - | - | 0.5/1/1.5/2 ~ 1/2/3/4 | - | - | 0.5 ~ 4 | 0.5/1/1.5/2 ~ 1/2/3/4 |
Loading...
How can we improve?
How can we improve?