(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
First recommendation for general turning for medium to large parts
Inserts with geometries and grades for all machining areas
Part Number |
---|
A50U-PCLNR19HP |
Part Number | Price | Name | Minimum Order Qty. | Volume Discount | Days to Ship | Minimum Machining Diameter | Selfishly | Overall Length | Protrusion length (L/D) | Specifications | Torque (Nm) | Function Width (mm) | Tip Size (mm) | Shank height (mm) | Usable length (mm) | Gauge Chip | Connection Diameter (mm) | Connection Size | Tool Style | Coolant Inlet Style |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
฿ 32,650.04 | SDV HOLDER | 1 Piece(s) | 6 Day(s) | 63 | Right-hand | 350 | 45 | Lever clamp, latest coolant technology | 10 | 35 | 19 | 47 | 200 | CNMG 19 06 12 | 50 | 50 | A..PCLNR/L..HP | Coolant center-through |
Loading...
Applicable Tip Shape | C (80° Diamond-Shape) | Application | Internal Diameter | Clamp Shape | Lever lock |
---|---|---|---|---|---|
Lubrication Hole Y/N | Available | Cutting Angle(°) | 95 | Tool Lead Angle(°) | -5 |
Coolant Inlet Thread Size | G1/8" | Coolant Pressure | 275 |
Please check the type/dimensions/specifications of the part A50U-PCLNR19HP in the T-Max P Inner-Diameter Boring Bit PCLNR/L series.
Part Number |
---|
A16R-PCLNL09HP |
A16R-PCLNR09HP |
A20S-PCLNL09HP |
A20S-PCLNR09HP |
A25T-PCLNL12HP |
A25T-PCLNR12HP |
Part Number | Price | Minimum Order Qty | Volume Discount | Days to Ship | Minimum Machining Diameter | Selfishly | Overall Length | Protrusion length (L/D) | Specifications | Torque (Nm) | Function Width (mm) | Tip Size (mm) | Shank height (mm) | Usable length (mm) | Gauge Chip | Connection Diameter (mm) | Connection Size | Tool Style | Coolant Inlet Style |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
฿ 19,596.92 | 1 Piece(s) | 6 Day(s) | 26 | Left-hand | 200 | 37 | Lever Clamp\tLatest Coolant Technology | 2 | 11 | 9 | 15 | 64 | CNMG 09 03 08 | 16 | 16 | A..PCLNR / L..HP | Coolant Center Through | ||
฿ 19,596.92 | 1 Piece(s) | 6 Day(s) | 26 | Right-hand | 200 | 37 | Lever Clamp\tLatest Coolant Technology | 2 | 11 | 9 | 15 | 64 | CNMG 09 03 08 | 16 | 16 | A..PCLNR / L..HP | Coolant Center Through | ||
฿ 21,157.06 | 1 Piece(s) | 6 Day(s) | 25 | Left-hand | 250 | 34 | Lever clamp, latest coolant technology | 2 | 13 | 9 | 18 | 80 | CNMG 09 03 08 | 20 | 20 | A..PCLNR/L..HP | Coolant center-through | ||
฿ 21,157.06 | 1 Piece(s) | 6 Day(s) | 25 | Right-hand | 250 | 34 | Lever clamp, latest coolant technology | 2 | 13 | 9 | 18 | 80 | CNMG 09 03 08 | 20 | 20 | A..PCLNR/L..HP | Coolant center-through | ||
฿ 23,029.22 | 1 Piece(s) | 6 Day(s) | 32 | Left-hand | 300 | 37 | Lever clamp, latest coolant technology | 5 | 17 | 12 | 23 | 100 | CNMG 12 04 08 | 25 | 25 | A..PCLNR/L..HP | Coolant center-through | ||
฿ 23,029.22 | 1 Piece(s) | 6 Day(s) | 32 | Right-hand | 300 | 37 | Lever clamp, latest coolant technology | 5 | 17 | 12 | 23 | 100 | CNMG 12 04 08 | 25 | 25 | A..PCLNR/L..HP | Coolant center-through |
How can we improve?
How can we improve?