(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
[Specifications]
· Shape: Square
· Work Material: General Steel, Tempering Steel, Cast Iron, Aluminum
[Applications]
· Flat / side / groove / rush (Z feed) / inclined cutting depth
Part Number |
---|
MG-EDS-1.5-OH1 |
Part Number | Price | Name | Minimum Order Qty. | Volume Discount | Days to Ship | Blade diameter (D) (φ) | Blade length (ℓ) (mm) | Shank diameter (d) (mm) | Overall Length (L) (mm) | Machining Application | Tool No. |
---|---|---|---|---|---|---|---|---|---|---|---|
฿ 1,935.00 | CARBIDE END MILL | 1 Piece(s) | 91 Day(s) | 1.5 | 4 | 4 | 40 | Flat Surface / Side Surface / Groove / Thrust (Z-Feed) / Inclined Cutting | 70903 |
Loading...
work material | General Steel / Heat-Treated Steel / Cast Iron / Aluminum | Number of flutes(sheet) | 2 | Type | Square |
---|---|---|---|---|---|
Coating | Non-Coated | Blade tip shape | Sharp Corner | Torsion Angle (θ) | Standard Helix (30 to 40°) |
Please check the type/dimensions/specifications of the part MG-EDS-1.5-OH1 in the 2-flute short MG-EDS-OH1 [Alterations Available] series.
Part Number |
---|
MG-EDS-1-OH1 |
MG-EDS-10-OH1 |
MG-EDS-11-OH1 |
MG-EDS-12-OH1 |
MG-EDS-2-OH1 |
MG-EDS-2.5-OH1 |
Part Number | Price | Minimum Order Qty | Volume Discount | Days to Ship | Blade diameter (D) (φ) | Blade length (ℓ) (mm) | Shank diameter (d) (mm) | Overall Length (L) (mm) | Machining Application | Tool No. |
---|---|---|---|---|---|---|---|---|---|---|
฿ 1,935.00 | 1 Piece(s) | 91 Day(s) | 1 | 2.5 | 4 | 40 | Flat Surface | 70902 | ||
฿ 5,004.00 | 1 Piece(s) | 91 Day(s) | 10 | 22 | 10 | 70 | - | 70920 | ||
฿ 5,408.00 | 1 Piece(s) | 91 Day(s) | 11 | 22 | 12 | 75 | - | 70921 | ||
฿ 6,014.00 | 1 Piece(s) | 91 Day(s) | 12 | 26 | 12 | 75 | - | 70922 | ||
฿ 1,935.00 | 1 Piece(s) | 91 Day(s) | 2 | 6 | 4 | 40 | - | 70904 | ||
฿ 2,126.00 | 1 Piece(s) | 91 Day(s) | 2.5 | 8 | 4 | 40 | - | 70905 |
How can we improve?
How can we improve?