(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
[Features]
· JIS standard compliant tap for blind holes.
· Supports a wide range of work materials from general steel to stainless steel.
Part Number |
---|
1013-M4.0X0.7 |
Part Number | Price | Name | Minimum Order Qty. | Volume Discount | Days to Ship | Nominal Diameter d1 | Pitch P (mm) | Overall Length L1 (mm) | shank diameter d2 (mm) | Length under neck l3 (mm) | Thread Length l2 (mm) | SW (mm) | Number of Grooves Z | Accuracy |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
฿ 923.00 | GRG TAP | 1 Piece(s) | 5 Day(s) | M4 | 0.7 | 52 | 5 | 21 | 7 | 4 | 3 | OH2 |
Loading...
Screw Types | Meter | Tool Material Type | HSS-E | Tap Type | Spiral Tap |
---|---|---|---|---|---|
Hole type | For blind hole | Coating Y/N | Available | Coating Type | TiN |
Chamfer | FormC |
Please check the type/dimensions/specifications of the part 1013-M4.0X0.7 in the Spiral Tap for Blind Hole 1013 series.
Part Number |
---|
1013-M16.0X2.0 |
1013-M18.0X2.5 |
1013-M2.0X0.4 |
1013-M5.0X0.8 |
1013-M6.0X1.0 |
1013-M8.0X1.25 |
Part Number | Price | Minimum Order Qty | Volume Discount | Days to Ship | Nominal Diameter d1 | Pitch P (mm) | Overall Length L1 (mm) | shank diameter d2 (mm) | Length under neck l3 (mm) | Thread Length l2 (mm) | SW (mm) | Number of Grooves Z | Accuracy |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
฿ 2,288.00 | 1 Piece(s) | 24 Day(s) | M16 | 2 | 95 | 12.5 | 52 | 20 | 10 | 4 | OH3 | ||
฿ 2,884.00 | 1 Piece(s) | 24 Day(s) | M18 | 2.5 | 100 | 14 | 55 | 25 | 11 | 4 | OH4 | ||
฿ 1,026.00 | 1 Piece(s) | 7 Day(s) | M2 | 0.4 | 40 | 3 | 15 | 4 | 2.5 | 3 | OH2 | ||
฿ 776.00 | 1 Piece(s) | 7 Day(s) | M5 | 0.8 | 60 | 5.5 | 24 | 8 | 4.5 | 3 | OH2 | ||
฿ 792.00 | 1 Piece(s) | 7 Day(s) | M6 | 1 | 62 | 6 | 29 | 10 | 4.5 | 3 | OH2 | ||
฿ 984.00 | 1 Piece(s) | 7 Day(s) | M8 | 1.25 | 70 | 6.2 | 37 | 12.5 | 5 | 3 | OH2 |
How can we improve?
How can we improve?