(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
[Features]
· Supports a wide range of machining and enables high-efficiency, high-speed machining.
Part Number |
---|
5515-009.250 |
Part Number | Price | Name | Minimum Order Qty. | Volume Discount | Days to Ship | Hole diameter (drill diameter) d1 (mm) | Groove Length l2 (mm) | Overall Length L1 (mm) | Shank diameter d2 (mm) | Shank length l3 (mm) |
---|---|---|---|---|---|---|---|---|---|---|
฿ 5,892.01 | GRG CARBIDE DRILL | 1 Piece(s) | 24 Day(s) | 9.25 | 61 | 103 | 10 | 40 |
Loading...
work material | general steel / Quenched and tempered steel / high hardness steel / Stainless Steel / Cast Iron / Aluminum / Titanium / Copper | Tool Material Type | Carbide | Shank Type | End Mill Shank |
---|---|---|---|---|---|
Coating Y/N | Available | Coating Type | Other | With/without Oil Hole | NA |
Number of flutes(sheet) | 2 | Tip angle(°) | 140 | Standard | DIN6537L |
Blade diameter tolerance | m7 | Shank diameter tolerance | h6 | Coating Details | FIRE |
Please check the type/dimensions/specifications of the part 5515-009.250 in the End Mill Shank Type 5xD RT100U 5515 series.
Part Number |
---|
5515-003.300 |
5515-003.400 |
5515-003.500 |
5515-009.300 |
5515-009.400 |
5515-009.500 |
Part Number | Price | Minimum Order Qty | Volume Discount | Days to Ship | Hole diameter (drill diameter) d1 (mm) | Groove Length l2 (mm) | Overall Length L1 (mm) | Shank diameter d2 (mm) | Shank length l3 (mm) |
---|---|---|---|---|---|---|---|---|---|
฿ 3,208.94 | 1 Piece(s) | 5 Day(s) | 3.3 | 28 | 66 | 6 | 36 | ||
฿ 3,208.94 | 1 Piece(s) | 5 Day(s) | 3.4 | 28 | 66 | 6 | 36 | ||
฿ 3,208.94 | 1 Piece(s) | 5 Day(s) | 3.5 | 28 | 66 | 6 | 36 | ||
฿ 3,675.17 | 1 Piece(s) | 5 Day(s) | 9.3 | 61 | 103 | 10 | 40 | ||
฿ 5,892.01 | 1 Piece(s) | 5 Day(s) | 9.4 | 61 | 103 | 10 | 40 | ||
฿ 3,675.17 | 1 Piece(s) | 5 Day(s) | 9.5 | 61 | 103 | 10 | 40 |
How can we improve?
How can we improve?