(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
Up to R4.5 specification products (solid tip) have a torsional shape on the rounded section as well, resulting in corners with improved profiling efficiency, which are ideal for rounding.
Part Number |
---|
BEM2045K |
Part Number | Price | Name | Minimum Order Qty. | Volume Discount | Days to Ship | R Size (mm) | Blade length (ℓ) (mm) | Overall Length (L) (mm) | Shank diameter (d) (mm) | Torsion Angle (°) | Neck Shape | Outer Diameter D (mm) |
---|---|---|---|---|---|---|---|---|---|---|---|---|
฿ 8,257.72 | ASS SOLID CARBIDE END MILLS | 1 Piece(s) | 5 Day(s) | 4.5 | 14 | 120 | 12 | 15 | A | 9 |
Loading...
Type | Bore | work material | General Steel / Heat-Treated Steel / Stainless Steel / Cast Iron / Aluminum / Copper / Resin | Number of flutes(sheet) | 2 |
---|---|---|---|---|---|
Coating | Non-Coated | Machining Application | Curved Surface / R-Groove | Flute Diameter Tolerance(mm) | 0~-0.05 |
Torsion Availability | Available |
Please check the type/dimensions/specifications of the part BEM2045K in the BEM2 ball end mill G2 series.
Part Number |
---|
BEM2030K |
BEM2035K |
BEM2040K |
BEM2050K |
BEM2060K |
BEM2075K |
Part Number | Price | Minimum Order Qty | Volume Discount | Days to Ship | R Size (mm) | Blade length (ℓ) (mm) | Overall Length (L) (mm) | Shank diameter (d) (mm) | Torsion Angle (°) | Neck Shape | Outer Diameter D (mm) |
---|---|---|---|---|---|---|---|---|---|---|---|
฿ 6,661.30 | 1 Piece(s) | 5 Day(s) | 3 | 11 | 120 | 10 | 15 | A | 6 | ||
฿ 7,060.41 | 1 Piece(s) | 5 Day(s) | 3.5 | 14 | 120 | 10 | 15 | A | 7 | ||
฿ 7,592.55 | 1 Piece(s) | 5 Day(s) | 4 | 14 | 120 | 12 | 15 | A | 8 | ||
฿ 7,193.44 | 1 Piece(s) | 5 Day(s) | 5 | 30 | 120 | 10 | 20 | B | 10 | ||
฿ 7,758.84 | 1 Piece(s) | 5 Day(s) | 6 | 30 | 120 | 12 | 20 | B | 12 | ||
฿ 9,055.93 | 1 Piece(s) | 5 Day(s) | 7.5 | 40 | 120 | 16 | 20 | A | 15 |
How can we improve?
How can we improve?