(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
Ideal for side and groove machining of castings, carbon steel, stainless steel, and hard-to-cut material (up to HRC 65). Capable of radial cutting depth of 1/8 D in semi-finishing and finishing of high-hardness steel.
Part Number |
---|
STN12048M |
Part Number | Price | Name | Minimum Order Qty. | Volume Discount | Days to Ship | Flute Diameter (D) (φ) | Flute Length (ℓ) (mm) | Number of Flutes (sheet) | Link Diameter (d) (mm) | Overall Length (L) (mm) | Neck Shape |
---|---|---|---|---|---|---|---|---|---|---|---|
฿ 7,858.62 | ASS SOLID CARBIDE END MILLS | 1 Piece(s) | 5 Day(s) | 12 | 48 | 6 | 12 | 110 | B |
Loading...
Work Material | General Steel / Heat-Treated Steel / High-Hardness Steel ~ HRC55 / High-Hardness Steel ~ HRC60 / Stainless Steel / Cast Iron | Type | Square | Coating | TiN |
---|---|---|---|---|---|
Processing Applications | Side Surface / Groove | Flute Shape | With Land | Torsion Angle (θ) | Standard Helix (30 to 40°) |
Flute Diameter Tolerance(mm) | 0~-0.05 |
Please check the type/dimensions/specifications of the part STN12048M in the STN Tornado End Mill MA series.
Part Number |
---|
STN04004M |
STN04008M |
STN04012M |
STN14014M |
STN14028M |
STN14042M |
Part Number | Price | Minimum Order Qty | Volume Discount | Days to Ship | Flute Diameter (D) (φ) | Flute Length (ℓ) (mm) | Number of Flutes (sheet) | Link Diameter (d) (mm) | Overall Length (L) (mm) | Neck Shape |
---|---|---|---|---|---|---|---|---|---|---|
฿ 2,703.53 | 1 Piece(s) | 5 Day(s) | 4 | 4 | 4 | 6 | 45 | A | ||
฿ 2,770.04 | 1 Piece(s) | 5 Day(s) | 4 | 8 | 4 | 6 | 45 | A | ||
฿ 3,036.11 | 1 Piece(s) | 5 Day(s) | 4 | 12 | 4 | 6 | 50 | A | ||
฿ 9,654.58 | 1 Piece(s) | 5 Day(s) | 14 | 14 | 6 | 16 | 95 | A | ||
฿ 9,687.84 | 1 Piece(s) | 5 Day(s) | 14 | 28 | 6 | 16 | 95 | A | ||
฿ 10,619.08 | 1 Piece(s) | 5 Day(s) | 14 | 42 | 6 | 16 | 110 | A |
How can we improve?
How can we improve?