1. No. of part number of this product, can see and select from the list here
2. Or select spec by configure tab until part number generated
3. Product information available in this area

(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.

    Sales
  • Viewed
    Products
  • My
    Components
  • Cart
Recently Viewed Products
X
My Components
X
Cart Item(s)
X
Loading...
  • Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 6:00 20/10/2024 to 5:00 21/10/2024. We apologize for the inconvenience.
  • แจ้งวันหยุดทำการในเดือน ตุลาคม 2567 | Notice holiday in October 2024 > คลิก
  • การยกเลิกจำหน่ายสินค้าประเภทอุปกรณ์นิวเมติกส์ (Pneumatic equipment) รุ่น “Economy Series”​ | Notice of End of Sales for Economy Series Pneumatic Equipment Category > คลิก

Hexagon Sarae Nut Die (For Gas Pipe)

Hexagon Sarae Nut Die (For Gas Pipe)
You can add up to 6 items per a category to the compare list.

Part Number :
  • From :
    ฿ 792.03/Unit
  • Qty :
  • Days to Ship :
    ---
  • Total Price :
    ---

Select part number to Order Now/ Add to Cart

Product Description

Used to clean and fix bolt screws with putting on a wrench for hex nuts.

 
Part Number
G6P02K
G6P04
G6P06
G6P08Q
G6P10Q
G6P12Q
G6P14Q
G6P16U
G6P18U
G6P20U
G6P22U
G6P24U
G6T02K
G6T04
G6T06
G6T08Q
G6T10Q
G6T12Q
G6T14Q
G6T16U
G6T18U
G6T20U
G6T22U
G6T24U
Part NumberPriceNameMinimum Order Qty.Volume DiscountDays to ShipThread Types Screw size (Nominal) Pitch, Number of Threads
(mm)

฿ 792.03

SKC DIES 1 Piece(s) 31 Day(s) Pipe ParallelR1/828

฿ 1,018.79

SKC DIES 1 Piece(s) 31 Day(s) Pipe ParallelR1/419

฿ 1,215.32

SKC DIES 1 Piece(s) 31 Day(s) Pipe ParallelR3/819

฿ 1,578.14

SKC DIES 1 Piece(s) 31 Day(s) Pipe ParallelR1/214

฿ 1,759.55

SKC DIES 1 Piece(s) 31 Day(s) Pipe ParallelR5/814

฿ 2,636.37

SKC DIES 1 Piece(s) 31 Day(s) Pipe ParallelR3/414

฿ 3,044.54

SKC DIES 1 Piece(s) 31 Day(s) Pipe ParallelR7/814

฿ 3,815.54

SKC DIES 1 Piece(s) 31 Day(s) Pipe ParallelR111

฿ 4,707.48

SKC DIES 1 Piece(s) 31 Day(s) Pipe ParallelR1"1/811

฿ 5,750.59

SKC DIES 1 Piece(s) 31 Day(s) Pipe ParallelR1"1/411

฿ 7,126.29

SKC DIES 1 Piece(s) 31 Day(s) Pipe ParallelR1"3/811

฿ 8,260.10

SKC DIES 1 Piece(s) 31 Day(s) Pipe ParallelR1"1/211

฿ 958.32

SKC DIES 1 Piece(s) 31 Day(s) Pipe TaperR1/828

฿ 1,230.44

SKC DIES 1 Piece(s) 31 Day(s) Pipe TaperR1/419

฿ 1,457.20

SKC DIES 1 Piece(s) 31 Day(s) Pipe TaperR3/819

฿ 1,873.23

SKC DIES 1 Piece(s) 31 Day(s) Pipe TaperR1/214

฿ 2,364.25

SKC DIES 1 Piece(s) 31 Day(s) Pipe TaperR5/814

฿ 3,120.13

SKC DIES 1 Piece(s) 31 Day(s) Pipe TaperR3/414

฿ 3,724.83

SKC DIES 1 Piece(s) 31 Day(s) Pipe TaperR7/814

฿ 4,631.89

SKC DIES 1 Piece(s) 31 Day(s) Pipe TaperR111

฿ 5,614.53

SKC DIES 1 Piece(s) 31 Day(s) Pipe TaperR1"1/811

฿ 6,823.93

SKC DIES 1 Piece(s) 31 Day(s) Pipe TaperR1"1/411

฿ 8,562.45

SKC DIES 1 Piece(s) 31 Day(s) Pipe TaperR1"3/811

฿ 9,923.04

SKC DIES 1 Piece(s) 31 Day(s) Pipe TaperR1"1/211

Loading...

  1. 1

Basic Information

Work Material Low-Carbon Steel (C Content of 0.25% or Less) / Medium-Carbon Steel (C Content 0.25 - 0.45%) / High-Carbon Steel (C Content Exceeding 0.45%) / Tool Steel (Before SKD Quenching) / Cast Steel (SC) / Cast Iron (FC) / Ductile Cast Iron (FCD) / Copper (Cu) / Brass (Bs) / Brass Cast Iron (BsC) / Bronze (PB) / Rolled Aluminum Material (AL) / Cast Aluminum Alloy (AC, ADC) / Zinc Alloy Castings (ZDC) Tap Model Die