(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
[Features]
It is possible to mirror-finish drilled hole of general steel, and it is possible to drill without following pilot hole.
Part Number | Price | Name | Minimum Order Qty. | Volume Discount | Days to Ship | Tool Diameter (mm) | Groove Length (mm) | Overall Length L (mm) | shank diameter d | Number of flutes |
---|---|---|---|---|---|---|---|---|---|---|
฿ 2,125.63 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 2.71 | 40 | 80 | 2.71 | 4 | ||
฿ 2,125.63 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 2.72 | 40 | 80 | 2.72 | 4 | ||
฿ 2,125.63 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 2.73 | 40 | 80 | 2.73 | 4 | ||
฿ 2,125.63 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 2.74 | 40 | 80 | 2.74 | 4 | ||
฿ 2,125.63 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 2.75 | 40 | 80 | 2.75 | 4 | ||
฿ 2,125.63 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 2.76 | 40 | 80 | 2.76 | 4 | ||
฿ 2,125.63 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 2.77 | 40 | 80 | 2.77 | 4 | ||
฿ 2,125.63 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 2.78 | 40 | 80 | 2.78 | 4 | ||
฿ 2,125.63 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 2.79 | 40 | 80 | 2.79 | 4 | ||
฿ 1,782.16 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 2.8 | 40 | 80 | 2.8 | 4 | ||
฿ 2,125.63 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 2.81 | 40 | 80 | 2.81 | 4 | ||
฿ 2,125.63 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 2.82 | 40 | 80 | 2.82 | 4 | ||
฿ 2,125.63 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 2.83 | 40 | 80 | 2.83 | 4 | ||
฿ 2,125.63 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 2.84 | 40 | 80 | 2.84 | 4 | ||
฿ 2,125.63 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 2.85 | 40 | 80 | 2.85 | 4 | ||
฿ 2,125.63 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 2.86 | 40 | 80 | 2.86 | 4 | ||
฿ 2,125.63 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 2.87 | 40 | 80 | 2.87 | 4 | ||
฿ 2,125.63 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 2.88 | 40 | 80 | 2.88 | 4 | ||
฿ 2,125.63 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 2.89 | 40 | 80 | 2.89 | 4 | ||
฿ 1,782.16 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 2.9 | 40 | 80 | 2.9 | 4 | ||
฿ 2,169.17 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 2.91 | 40 | 80 | 2.91 | 4 | ||
฿ 2,169.17 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 2.92 | 40 | 80 | 2.92 | 4 | ||
฿ 2,169.17 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 2.93 | 40 | 80 | 2.93 | 4 | ||
฿ 2,169.17 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 2.94 | 40 | 80 | 2.94 | 4 | ||
฿ 2,169.17 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 2.95 | 40 | 80 | 2.95 | 4 | ||
฿ 2,169.17 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 2.96 | 40 | 80 | 2.96 | 4 | ||
฿ 2,169.17 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 2.97 | 40 | 80 | 2.97 | 4 | ||
฿ 2,186.26 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 2.98 | 40 | 80 | 2.98 | 4 | ||
฿ 2,169.17 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 2.99 | 40 | 80 | 2.99 | 4 | ||
฿ 1,833.12 | CARBIDE REAMER_CB | 1 Piece(s) | 9 Day(s) | 3 | 40 | 80 | 3 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.01 | 40 | 80 | 3.01 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.02 | 40 | 80 | 3.02 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.03 | 40 | 80 | 3.03 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.04 | 40 | 80 | 3.04 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.05 | 40 | 80 | 3.05 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.06 | 40 | 80 | 3.06 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.07 | 40 | 80 | 3.07 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.08 | 40 | 80 | 3.08 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.09 | 40 | 80 | 3.09 | 4 | ||
฿ 2,111.12 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.1 | 40 | 80 | 3.1 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.11 | 40 | 80 | 3.11 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.12 | 40 | 80 | 3.12 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.13 | 40 | 80 | 3.13 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.15 | 40 | 80 | 3.15 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.16 | 40 | 80 | 3.16 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.17 | 40 | 80 | 3.17 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.18 | 40 | 80 | 3.18 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.19 | 40 | 80 | 3.19 | 4 | ||
฿ 2,111.12 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.2 | 40 | 80 | 3.2 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.21 | 40 | 80 | 3.21 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.22 | 40 | 80 | 3.22 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.23 | 40 | 80 | 3.23 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.24 | 40 | 80 | 3.24 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.25 | 40 | 80 | 3.25 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.26 | 40 | 80 | 3.26 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.27 | 40 | 80 | 3.27 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.28 | 40 | 80 | 3.28 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.29 | 40 | 80 | 3.29 | 4 | ||
฿ 2,111.12 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.3 | 40 | 80 | 3.3 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.31 | 40 | 80 | 3.31 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.32 | 40 | 80 | 3.32 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.33 | 40 | 80 | 3.33 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.34 | 40 | 80 | 3.34 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.35 | 40 | 80 | 3.35 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.36 | 40 | 80 | 3.36 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.37 | 40 | 80 | 3.37 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.38 | 40 | 80 | 3.38 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.39 | 40 | 80 | 3.39 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.41 | 40 | 80 | 3.41 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.42 | 40 | 80 | 3.42 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.43 | 40 | 80 | 3.43 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.44 | 40 | 80 | 3.44 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.45 | 40 | 80 | 3.45 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.46 | 40 | 80 | 3.46 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.47 | 40 | 80 | 3.47 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.48 | 40 | 80 | 3.48 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.49 | 40 | 80 | 3.49 | 4 | ||
฿ 2,128.21 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.5 | 40 | 80 | 3.5 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.51 | 40 | 80 | 3.51 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.52 | 40 | 80 | 3.52 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.53 | 40 | 80 | 3.53 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.54 | 40 | 80 | 3.54 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.55 | 40 | 80 | 3.55 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.56 | 40 | 80 | 3.56 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.57 | 40 | 80 | 3.57 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.58 | 40 | 80 | 3.58 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.59 | 40 | 80 | 3.59 | 4 | ||
฿ 2,111.12 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.6 | 40 | 80 | 3.6 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.61 | 40 | 80 | 3.61 | 4 | ||
฿ 2,522.32 | CARBIDE REAMER_CB | 1 Piece(s) | 5 Day(s) | 3.62 | 40 | 80 | 3.62 | 4 |
Loading...
Shank Type | straight shank | work material | general steel / Resin / Alloy Steel | Coating Y/N | NA |
---|---|---|---|---|---|
Groove Shape | Straight | Base Blade Y/N | NA | Grip length B(mm) | 0.5 |
Diameter tolerance(mm) | 0~0.003 |
How can we improve?
How can we improve?