(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
[Features]
· Long neck ball end mill for resin processing.
· Ideal for processing deep grooves by undercutting the neck.
Part Number |
---|
CPRB2040-10 |
Part Number | Price | Name | Minimum Order Qty. | Volume Discount | Days to Ship | R Size (mm) | Blade length (mm) | Overall Length (L) (mm) | Underneck length (mm) | Shank diameter (d) (mm) | Neck Diameter φd1 (mm) | Shank Taper Angle Bta (°) |
---|---|---|---|---|---|---|---|---|---|---|---|---|
฿ 1,878.84 | UNI SOLID CARBIDE END MILLS | 1 Piece(s) | 5 Day(s) | 2 | 3 | 70 | 10 | 6 | 3.8 | 11° |
Loading...
Type | Long Neck Bore | work material | Aluminum / Copper / Resin | Number of flutes(sheet) | 2 |
---|---|---|---|---|---|
Coating | Non-Coated | R Precision(μm) | -0.01~0.01 | Machining Application | Curved Surface / Side Surface / Carving / R-Groove |
Torsion Availability | Available |
Please check the type/dimensions/specifications of the part CPRB2040-10 in the CPRB 2-Flute Long Neck Ball End Mill for Resin Machining series.
Part Number |
---|
CPRB2005-10 |
CPRB2005-2 |
CPRB2005-4 |
CPRB2040-12 |
CPRB2040-16 |
CPRB2040-20 |
Part Number | Price | Minimum Order Qty | Volume Discount | Days to Ship | R Size (mm) | Blade length (mm) | Overall Length (L) (mm) | Underneck length (mm) | Shank diameter (d) (mm) | Neck Diameter φd1 (mm) | Shank Taper Angle Bta (°) |
---|---|---|---|---|---|---|---|---|---|---|---|
฿ 2,059.29 | 1 Piece(s) | 6 Day(s) | 0.25 | 0.8 | 50 | 10 | 4 | 0.46 | 11° | ||
฿ 1,742.70 | 1 Piece(s) | 6 Day(s) | 0.25 | 0.8 | 45 | 2 | 4 | 0.46 | 11° | ||
฿ 1,742.70 | 1 Piece(s) | 6 Day(s) | 0.25 | 0.8 | 45 | 4 | 4 | 0.46 | 11° | ||
฿ 1,878.84 | 1 Piece(s) | 5 Day(s) | 2 | 3 | 70 | 12 | 6 | 3.8 | 11° | ||
฿ 1,878.84 | 1 Piece(s) | 5 Day(s) | 2 | 3 | 70 | 16 | 6 | 3.8 | 11° | ||
฿ 1,878.84 | 1 Piece(s) | 6 Day(s) | 2 | 3 | 70 | 20 | 6 | 3.8 | 11° |
How can we improve?
How can we improve?