(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
The long shank allows machining in deep sections
Part Number |
---|
FX-LS-MG-EBD-R12.5X25 |
Part Number | Price | Name | Minimum Order Qty. | Volume Discount | Days to Ship | R Size (mm) | Blade length (ℓ) (mm) | Overall Length (L) (mm) | Shank diameter (d) (mm) | Major Diameter (mm) | Tool No. |
---|---|---|---|---|---|---|---|---|---|---|---|
฿ 50,114.00 ฿ 38,693.02 | CARBIDE END MILL | 1 Piece(s) | 91 Day(s) | 12.5 | 50 | 280 | 25 | 25 | 8541250 |
Loading...
Type | Bore | work material | General Steel / Heat-Treated Steel / High-Hardness Steel ~ HRC55 / High-Hardness Steel ~ HRC60 / Stainless Steel / Cast Iron / Aluminum / Titanium / Copper | Number of flutes(sheet) | 2 |
---|---|---|---|---|---|
Coating | TiAlN | R Precision(μm) | -0.01~+0.01 | Machining Application | Curved Surface / Side Surface / Carving / R-Groove |
Torsion Availability | Available |
Please check the type/dimensions/specifications of the part FX-LS-MG-EBD-R12.5X25 in the Long Shank Ball Type, 2-Flute FX-LS-MG-EBD series.
Part Number |
---|
FX-LS-MG-EBD-R0.5X1 |
FX-LS-MG-EBD-R1.5X3 |
FX-LS-MG-EBD-R10X20 |
FX-LS-MG-EBD-R15X30 |
FX-LS-MG-EBD-R1X2 |
FX-LS-MG-EBD-R2.5X5 |
Part Number | Price | Minimum Order Qty | Volume Discount | Days to Ship | R Size (mm) | Blade length (ℓ) (mm) | Overall Length (L) (mm) | Shank diameter (d) (mm) | Major Diameter (mm) | Tool No. |
---|---|---|---|---|---|---|---|---|---|---|
฿ 3,856.00 | 1 Piece(s) | 91 Day(s) | 0.5 | 2.5 | 70 | 3 | 1 | 8541010 | ||
฿ 4,601.00 | 1 Piece(s) | 91 Day(s) | 1.5 | 8 | 80 | 3 | 3 | 8541030 | ||
฿ 47,259.00 | 1 Piece(s) | 91 Day(s) | 10 | 38 | 250 | 20 | 20 | 8541200 | ||
฿ 71,400.00 | 1 Piece(s) | 91 Day(s) | 15 | 55 | 280 | 25 | 30 | 8541300 | ||
฿ 4,012.00 | 1 Piece(s) | Same day | 1 | 5 | 70 | 3 | 2 | 8541020 | ||
฿ 7,053.00 | 1 Piece(s) | 91 Day(s) | 2.5 | 10 | 100 | 4 | 5 | 8541050 |
How can we improve?
How can we improve?