(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
[Features]
· For general wiring (global product).
· UL for standard items (CSA) certified. It is a truly international breaker [EAGU].
Part Number |
---|
EW100EAGU-3P060 B 4L |
Part Number | Price | Name | Minimum Order Qty. | Volume Discount | Days to Ship | Rated block capacity AC 400 V (kA) | Number of Poles | Rated Current (A) | rate sensitivity current (mA) | Dimension height (mm) | Rated block capacity AC 230 V (kA) |
---|---|---|---|---|---|---|---|---|---|---|---|
฿ 17,418.33 ฿ 13,063.75 | EARTH LEAKAGE CIRCUIT BREAKER | 1 Piece(s) | 61 Day(s) | 10/5 | 3 | 60 | 30 | 120 | 25/13 |
Loading...
Ampere frame AF | 100AF | Dimension width(mm) | 75 | Dimension depth(mm) | 84 |
---|---|---|---|---|---|
Specifications | Global product [U:L listed] |
Please check the type/dimensions/specifications of the part EW100EAGU-3P060 B 4L in the G-TWIN Earth Leakage Breaker EW Series EAGU (100AF) series.
Part Number |
---|
EW100EAGU-2P060 K WK A |
EW100EAGU-2P060B |
EW100EAGU-2P060K |
EW100EAGU-3P060 B FAC200V50HZ/AC200-220V60HZ A |
EW100EAGU-3P060 B K |
EW100EAGU-3P060 B K A |
Part Number | Price | Minimum Order Qty | Volume Discount | Days to Ship | Rated block capacity AC 400 V (kA) | Number of Poles | Rated Current (A) | rate sensitivity current (mA) | Dimension height (mm) | Rated block capacity AC 230 V (kA) |
---|---|---|---|---|---|---|---|---|---|---|
฿ 16,523.33 | 1 Piece(s) | 61 Day(s) | 7.5/4 | 2 | 60 | 100/200/500/1000 | 120 | 10/5 | ||
฿ 13,953.33 | 1 Piece(s) | 61 Day(s) | 7.5/4 | 2 | 60 | 30 | 100 | 10/5 | ||
฿ 13,953.33 | 1 Piece(s) | 61 Day(s) | 7.5/4 | 2 | 60 | 100/200/500/1000 | 100 | 10/5 | ||
฿ 20,435.00 | 1 Piece(s) | 61 Day(s) | 10/5 | 3 | 60 | 30 | 120 | 25/13 | ||
฿ 18,590.00 | 1 Piece(s) | 61 Day(s) | 10/5 | 3 | 60 | 30 | 120 | 25/13 | ||
฿ 18,813.34 | 1 Piece(s) | 61 Day(s) | 10/5 | 3 | 60 | 30 | 120 | 25/13 |
How can we improve?
How can we improve?