(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
[Features]
• Specialist cable for use with Japan's FA open field network system CC-Link.
• This product is CC-Link compliant.
• Standard cable for fixed wiring and cable for movable parts suitable for the wiring of movable parts of Cableveyors and the like are available.
Part Number | Price | Name | Minimum Order Qty. | Volume Discount | Days to Ship | RoHS | Standard | Cable Outer Diameter (mm) | Length (m) | Application | Finished outer diameter (mm) | Overall Length (m) | Conductor Cross Section (mm2) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
฿ 8,865.46 | CABLE | 1 Piece(s) | 6 Day(s) | 10 | - | 8.0 to 8.9 | 60 to 69 | For Fixed Parts | 8 | 61 | 0.5 | ||
฿ 9,006.58 | CABLE | 1 Piece(s) | 6 Day(s) | 10 | - | 8.0 to 8.9 | 60 to 69 | For Fixed Parts | 8 | 62 | 0.5 | ||
฿ 9,147.69 | CABLE | 1 Piece(s) | 6 Day(s) | 10 | - | 8.0 to 8.9 | 60 to 69 | For Fixed Parts | 8 | 63 | 0.5 | ||
฿ 9,288.80 | CABLE | 1 Piece(s) | 6 Day(s) | 10 | - | 8.0 to 8.9 | 60 to 69 | For Fixed Parts | 8 | 64 | 0.5 | ||
฿ 9,429.91 | CABLE | 1 Piece(s) | 6 Day(s) | 10 | - | 8.0 to 8.9 | 60 to 69 | For Fixed Parts | 8 | 65 | 0.5 | ||
฿ 9,571.03 | CABLE | 1 Piece(s) | 6 Day(s) | 10 | - | 8.0 to 8.9 | 60 to 69 | For Fixed Parts | 8 | 66 | 0.5 | ||
฿ 9,712.14 | CABLE | 1 Piece(s) | 6 Day(s) | 10 | - | 8.0 to 8.9 | 60 to 69 | For Fixed Parts | 8 | 67 | 0.5 | ||
฿ 9,853.26 | CABLE | 1 Piece(s) | 6 Day(s) | 10 | - | 8.0 to 8.9 | 60 to 69 | For Fixed Parts | 8 | 68 | 0.5 | ||
฿ 9,994.37 | CABLE | 1 Piece(s) | 6 Day(s) | 10 | - | 8.0 to 8.9 | 60 to 69 | For Fixed Parts | 8 | 69 | 0.5 | ||
฿ 10,135.48 | CABLE | 1 Piece(s) | 6 Day(s) | 10 | - | 8.0 to 8.9 | 70 to 79 | For Fixed Parts | 8 | 70 | 0.5 | ||
฿ 10,276.60 | CABLE | 1 Piece(s) | 6 Day(s) | 10 | - | 8.0 to 8.9 | 70 to 79 | For Fixed Parts | 8 | 71 | 0.5 | ||
฿ 10,417.71 | CABLE | 1 Piece(s) | 6 Day(s) | 10 | - | 8.0 to 8.9 | 70 to 79 | For Fixed Parts | 8 | 72 | 0.5 | ||
฿ 10,558.82 | CABLE | 1 Piece(s) | 6 Day(s) | 10 | - | 8.0 to 8.9 | 70 to 79 | For Fixed Parts | 8 | 73 | 0.5 | ||
฿ 10,699.93 | CABLE | 1 Piece(s) | 6 Day(s) | 10 | - | 8.0 to 8.9 | 70 to 79 | For Fixed Parts | 8 | 74 | 0.5 | ||
฿ 10,841.05 | CABLE | 1 Piece(s) | 6 Day(s) | 10 | - | 8.0 to 8.9 | 70 to 79 | For Fixed Parts | 8 | 75 | 0.5 | ||
฿ 10,982.16 | CABLE | 1 Piece(s) | 6 Day(s) | 10 | - | 8.0 to 8.9 | 70 to 79 | For Fixed Parts | 8 | 76 | 0.5 | ||
฿ 11,123.28 | CABLE | 1 Piece(s) | 6 Day(s) | 10 | - | 8.0 to 8.9 | 70 to 79 | For Fixed Parts | 8 | 77 | 0.5 | ||
฿ 11,264.39 | CABLE | 1 Piece(s) | 6 Day(s) | 10 | - | 8.0 to 8.9 | 70 to 79 | For Fixed Parts | 8 | 78 | 0.5 | ||
฿ 11,405.50 | CABLE | 1 Piece(s) | 6 Day(s) | 10 | - | 8.0 to 8.9 | 70 to 79 | For Fixed Parts | 8 | 79 | 0.5 | ||
฿ 11,546.62 | CABLE | 1 Piece(s) | 6 Day(s) | 10 | - | 8.0 to 8.9 | 80 to 89 | For Fixed Parts | 8 | 80 | 0.5 | ||
฿ 11,687.73 | CABLE | 1 Piece(s) | 6 Day(s) | 10 | - | 8.0 to 8.9 | 80 to 89 | For Fixed Parts | 8 | 81 | 0.5 | ||
฿ 11,828.84 | CABLE | 1 Piece(s) | 6 Day(s) | 10 | - | 8.0 to 8.9 | 80 to 89 | For Fixed Parts | 8 | 82 | 0.5 | ||
฿ 11,969.95 | CABLE | 1 Piece(s) | 6 Day(s) | 10 | - | 8.0 to 8.9 | 80 to 89 | For Fixed Parts | 8 | 83 | 0.5 | ||
฿ 12,111.06 | CABLE | 1 Piece(s) | 6 Day(s) | 10 | - | 8.0 to 8.9 | 80 to 89 | For Fixed Parts | 8 | 84 | 0.5 | ||
฿ 12,252.19 | CABLE | 1 Piece(s) | 6 Day(s) | 10 | - | 8.0 to 8.9 | 80 to 89 | For Fixed Parts | 8 | 85 | 0.5 | ||
฿ 12,393.30 | CABLE | 1 Piece(s) | 6 Day(s) | 10 | - | 8.0 to 8.9 | 80 to 89 | For Fixed Parts | 8 | 86 | 0.5 | ||
฿ 12,534.41 | CABLE | 1 Piece(s) | 6 Day(s) | 10 | - | 8.0 to 8.9 | 80 to 89 | For Fixed Parts | 8 | 87 | 0.5 | ||
฿ 12,675.52 | CABLE | 1 Piece(s) | 6 Day(s) | 10 | - | 8.0 to 8.9 | 80 to 89 | For Fixed Parts | 8 | 88 | 0.5 | ||
฿ 12,816.64 | CABLE | 1 Piece(s) | 6 Day(s) | 10 | - | 8.0 to 8.9 | 80 to 89 | For Fixed Parts | 8 | 89 | 0.5 | ||
฿ 12,957.75 | CABLE | 1 Piece(s) | 6 Day(s) | 10 | - | 8.0 to 8.9 | 90 to 99 | For Fixed Parts | 8 | 90 | 0.5 | ||
฿ 13,098.86 | CABLE | 1 Piece(s) | 6 Day(s) | 10 | - | 8.0 to 8.9 | 90 to 99 | For Fixed Parts | 8 | 91 | 0.5 | ||
฿ 13,239.97 | CABLE | 1 Piece(s) | 6 Day(s) | 10 | - | 8.0 to 8.9 | 90 to 99 | For Fixed Parts | 8 | 92 | 0.5 | ||
฿ 13,381.08 | CABLE | 1 Piece(s) | 6 Day(s) | 10 | - | 8.0 to 8.9 | 90 to 99 | For Fixed Parts | 8 | 93 | 0.5 | ||
฿ 13,522.21 | CABLE | 1 Piece(s) | 6 Day(s) | 10 | - | 8.0 to 8.9 | 90 to 99 | For Fixed Parts | 8 | 94 | 0.5 | ||
฿ 13,663.32 | CABLE | 1 Piece(s) | 6 Day(s) | 10 | - | 8.0 to 8.9 | 90 to 99 | For Fixed Parts | 8 | 95 | 0.5 | ||
฿ 13,804.43 | CABLE | 1 Piece(s) | 6 Day(s) | 10 | - | 8.0 to 8.9 | 90 to 99 | For Fixed Parts | 8 | 96 | 0.5 | ||
฿ 13,945.54 | CABLE | 1 Piece(s) | 6 Day(s) | 10 | - | 8.0 to 8.9 | 90 to 99 | For Fixed Parts | 8 | 97 | 0.5 | ||
฿ 14,086.65 | CABLE | 1 Piece(s) | 6 Day(s) | 10 | - | 8.0 to 8.9 | 90 to 99 | For Fixed Parts | 8 | 98 | 0.5 | ||
฿ 14,227.77 | CABLE | 1 Piece(s) | 6 Day(s) | 10 | - | 8.0 to 8.9 | 90 to 99 | For Fixed Parts | 8 | 99 | 0.5 | ||
฿ 13,946.75 | CABLE | 1 Piece(s) | 6 Day(s) | 10 | - | 8.0 to 8.9 | 100 or More | For Fixed Parts | 8 | 100 | 0.5 |
Loading...
Category | Others | Shield Structure | Shielded・STP | Shield Details | Double Layer Shield |
---|---|---|---|---|---|
FA Network Standard | CC-LINK | Cable Conductor | Single Wire | Conductor Size | AWG20 (0.50sq) |
No. of Cores | 3 Core (3C) | Color | Black | Cable Feature | Oil-Resistant / Heat-Resistant |
Sheath Material | PVC | Insulation body color | Blue/White/Yellow | Grounding Wire | NA |
Other Properties | Flexibility |
How can we improve?
How can we improve?