(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
[Features]
• Specialist cable for use with Japan's FA open field network system CC-Link.
• This product is CC-Link compliant.
• Standard cable for fixed wiring and cable for movable parts suitable for the wiring of movable parts of Cableveyors and the like are available.
Part Number | Price | Name | Minimum Order Qty. | Volume Discount | Days to Ship | RoHS | Standard | Cable Outer Diameter (mm) | Length (m) | Application | Finished outer diameter (mm) | Overall Length (m) | Conductor Cross Section (mm2) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
฿ 20,304.12 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 8.0 to 8.9 | 80 to 89 | Movable Section | 8 | 81 | 0.5 | ||
฿ 20,552.49 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 8.0 to 8.9 | 80 to 89 | Movable Section | 8 | 82 | 0.5 | ||
฿ 20,800.86 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 8.0 to 8.9 | 80 to 89 | Movable Section | 8 | 83 | 0.5 | ||
฿ 21,049.24 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 8.0 to 8.9 | 80 to 89 | Movable Section | 8 | 84 | 0.5 | ||
฿ 21,297.60 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 8.0 to 8.9 | 80 to 89 | Movable Section | 8 | 85 | 0.5 | ||
฿ 21,545.98 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 8.0 to 8.9 | 80 to 89 | Movable Section | 8 | 86 | 0.5 | ||
฿ 21,794.35 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 8.0 to 8.9 | 80 to 89 | Movable Section | 8 | 87 | 0.5 | ||
฿ 22,042.72 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 8.0 to 8.9 | 80 to 89 | Movable Section | 8 | 88 | 0.5 | ||
฿ 22,291.09 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 8.0 to 8.9 | 80 to 89 | Movable Section | 8 | 89 | 0.5 | ||
฿ 22,539.47 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 8.0 to 8.9 | 90 to 99 | Movable Section | 8 | 90 | 0.5 | ||
฿ 22,787.83 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 8.0 to 8.9 | 90 to 99 | Movable Section | 8 | 91 | 0.5 | ||
฿ 23,036.21 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 8.0 to 8.9 | 90 to 99 | Movable Section | 8 | 92 | 0.5 | ||
฿ 23,284.58 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 8.0 to 8.9 | 90 to 99 | Movable Section | 8 | 93 | 0.5 | ||
฿ 23,532.95 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 8.0 to 8.9 | 90 to 99 | Movable Section | 8 | 94 | 0.5 | ||
฿ 23,781.32 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 8.0 to 8.9 | 90 to 99 | Movable Section | 8 | 95 | 0.5 | ||
฿ 24,029.70 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 8.0 to 8.9 | 90 to 99 | Movable Section | 8 | 96 | 0.5 | ||
฿ 24,278.07 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 8.0 to 8.9 | 90 to 99 | Movable Section | 8 | 97 | 0.5 | ||
฿ 24,526.44 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 8.0 to 8.9 | 90 to 99 | Movable Section | 8 | 98 | 0.5 | ||
฿ 24,774.81 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 8.0 to 8.9 | 90 to 99 | Movable Section | 8 | 99 | 0.5 | ||
฿ 25,023.19 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 8.0 to 8.9 | 100 or More | Movable Section | 8 | 100 | 0.5 | ||
฿ 306.20 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 1 to 9 | For Fixed Parts | 7 | 1 | 0.5 | ||
฿ 426.41 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 1 to 9 | For Fixed Parts | 7 | 2 | 0.5 | ||
฿ 613.94 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 1 to 9 | For Fixed Parts | 7 | 3 | 0.5 | ||
฿ 818.71 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 1 to 9 | For Fixed Parts | 7 | 4 | 0.5 | ||
฿ 1,023.48 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 1 to 9 | For Fixed Parts | 7 | 5 | 0.5 | ||
฿ 1,228.26 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 1 to 9 | For Fixed Parts | 7 | 6 | 0.5 | ||
฿ 1,433.03 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 1 to 9 | For Fixed Parts | 7 | 7 | 0.5 | ||
฿ 1,637.81 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 1 to 9 | For Fixed Parts | 7 | 8 | 0.5 | ||
฿ 1,842.58 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 1 to 9 | For Fixed Parts | 7 | 9 | 0.5 | ||
฿ 1,572.39 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 10 to 19 | For Fixed Parts | 7 | 10 | 0.5 | ||
฿ 1,729.55 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 10 to 19 | For Fixed Parts | 7 | 11 | 0.5 | ||
฿ 1,887.10 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 10 to 19 | For Fixed Parts | 7 | 12 | 0.5 | ||
฿ 2,044.26 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 10 to 19 | For Fixed Parts | 7 | 13 | 0.5 | ||
฿ 2,201.42 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 10 to 19 | For Fixed Parts | 7 | 14 | 0.5 | ||
฿ 2,358.58 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 10 to 19 | For Fixed Parts | 7 | 15 | 0.5 | ||
฿ 2,516.13 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 10 to 19 | For Fixed Parts | 7 | 16 | 0.5 | ||
฿ 2,673.29 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 10 to 19 | For Fixed Parts | 7 | 17 | 0.5 | ||
฿ 2,830.45 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 10 to 19 | For Fixed Parts | 7 | 18 | 0.5 | ||
฿ 2,987.61 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 10 to 19 | For Fixed Parts | 7 | 19 | 0.5 | ||
฿ 2,602.84 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 20 to 29 | For Fixed Parts | 7 | 20 | 0.5 | ||
฿ 2,732.90 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 20 to 29 | For Fixed Parts | 7 | 21 | 0.5 | ||
฿ 2,862.97 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 20 to 29 | For Fixed Parts | 7 | 22 | 0.5 | ||
฿ 2,993.03 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 20 to 29 | For Fixed Parts | 7 | 23 | 0.5 | ||
฿ 3,123.10 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 20 to 29 | For Fixed Parts | 7 | 24 | 0.5 | ||
฿ 3,253.55 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 20 to 29 | For Fixed Parts | 7 | 25 | 0.5 | ||
฿ 3,383.61 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 20 to 29 | For Fixed Parts | 7 | 26 | 0.5 | ||
฿ 3,513.68 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 20 to 29 | For Fixed Parts | 7 | 27 | 0.5 | ||
฿ 3,643.74 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 20 to 29 | For Fixed Parts | 7 | 28 | 0.5 | ||
฿ 3,774.19 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 20 to 29 | For Fixed Parts | 7 | 29 | 0.5 | ||
฿ 3,904.26 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 30 to 39 | For Fixed Parts | 7 | 30 | 0.5 | ||
฿ 4,034.32 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 30 to 39 | For Fixed Parts | 7 | 31 | 0.5 | ||
฿ 4,164.39 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 30 to 39 | For Fixed Parts | 7 | 32 | 0.5 | ||
฿ 4,294.45 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 30 to 39 | For Fixed Parts | 7 | 33 | 0.5 | ||
฿ 4,424.90 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 30 to 39 | For Fixed Parts | 7 | 34 | 0.5 | ||
฿ 4,554.97 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 30 to 39 | For Fixed Parts | 7 | 35 | 0.5 | ||
฿ 4,685.03 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 30 to 39 | For Fixed Parts | 7 | 36 | 0.5 | ||
฿ 4,815.10 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 30 to 39 | For Fixed Parts | 7 | 37 | 0.5 | ||
฿ 4,945.16 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 30 to 39 | For Fixed Parts | 7 | 38 | 0.5 | ||
฿ 5,075.61 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 30 to 39 | For Fixed Parts | 7 | 39 | 0.5 | ||
฿ 5,205.68 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 40 to 49 | For Fixed Parts | 7 | 40 | 0.5 | ||
฿ 5,335.74 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 40 to 49 | For Fixed Parts | 7 | 41 | 0.5 | ||
฿ 5,465.81 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 40 to 49 | For Fixed Parts | 7 | 42 | 0.5 | ||
฿ 5,595.87 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 40 to 49 | For Fixed Parts | 7 | 43 | 0.5 | ||
฿ 5,726.32 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 40 to 49 | For Fixed Parts | 7 | 44 | 0.5 | ||
฿ 5,856.39 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 40 to 49 | For Fixed Parts | 7 | 45 | 0.5 | ||
฿ 5,986.45 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 40 to 49 | For Fixed Parts | 7 | 46 | 0.5 | ||
฿ 6,116.52 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 40 to 49 | For Fixed Parts | 7 | 47 | 0.5 | ||
฿ 6,246.58 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 40 to 49 | For Fixed Parts | 7 | 48 | 0.5 | ||
฿ 6,076.53 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 40 to 49 | For Fixed Parts | 7 | 49 | 0.5 | ||
฿ 6,196.75 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 50 to 59 | For Fixed Parts | 7 | 50 | 0.5 | ||
฿ 6,316.96 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 50 to 59 | For Fixed Parts | 7 | 51 | 0.5 | ||
฿ 6,437.18 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 50 to 59 | For Fixed Parts | 7 | 52 | 0.5 | ||
฿ 6,557.39 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 50 to 59 | For Fixed Parts | 7 | 53 | 0.5 | ||
฿ 6,677.61 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 50 to 59 | For Fixed Parts | 7 | 54 | 0.5 | ||
฿ 6,797.83 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 50 to 59 | For Fixed Parts | 7 | 55 | 0.5 | ||
฿ 6,918.04 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 50 to 59 | For Fixed Parts | 7 | 56 | 0.5 | ||
฿ 7,038.25 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 50 to 59 | For Fixed Parts | 7 | 57 | 0.5 | ||
฿ 7,158.47 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 50 to 59 | For Fixed Parts | 7 | 58 | 0.5 | ||
฿ 7,278.69 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 50 to 59 | For Fixed Parts | 7 | 59 | 0.5 | ||
฿ 7,398.90 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 60 to 69 | For Fixed Parts | 7 | 60 | 0.5 | ||
฿ 7,519.11 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 60 to 69 | For Fixed Parts | 7 | 61 | 0.5 | ||
฿ 7,639.33 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 60 to 69 | For Fixed Parts | 7 | 62 | 0.5 | ||
฿ 7,759.55 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 60 to 69 | For Fixed Parts | 7 | 63 | 0.5 | ||
฿ 7,879.76 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 60 to 69 | For Fixed Parts | 7 | 64 | 0.5 | ||
฿ 7,999.98 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 60 to 69 | For Fixed Parts | 7 | 65 | 0.5 | ||
฿ 8,120.20 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 60 to 69 | For Fixed Parts | 7 | 66 | 0.5 | ||
฿ 8,240.40 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 60 to 69 | For Fixed Parts | 7 | 67 | 0.5 | ||
฿ 8,360.62 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 60 to 69 | For Fixed Parts | 7 | 68 | 0.5 | ||
฿ 8,480.84 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 60 to 69 | For Fixed Parts | 7 | 69 | 0.5 | ||
฿ 8,601.06 | CABLE | 1 Piece(s) | 3 Day(s) | - | - | 7.0 to 7.9 | 70 to 79 | For Fixed Parts | 7 | 70 | 0.5 |
Loading...
Category | Others | Shield Structure | Shielded・STP | Shield Details | Double Layer Shield |
---|---|---|---|---|---|
FA Network Standard | CC-LINK | Cable Conductor | Single Wire | Conductor Size | AWG20 (0.50sq) |
No. of Cores | 3 Core (3C) | Color | Black | Cable Feature | Oil-Resistant / Heat-Resistant |
Sheath Material | PVC | Insulation body color | Blue/White/Yellow | Grounding Wire | NA |
Other Properties | Flexibility |
How can we improve?
How can we improve?