(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
[Features]
· Latest IEC60947-2 It is a compact new series compatible with international standards.
· JAG.
Part Number |
---|
EW125JAG-4P125B |
Part Number | Price | Name | Minimum Order Qty. | Volume Discount | Days to Ship | RoHS | Ampere frame AF | Number of Poles | Rated Current (A) | rate sensitivity current (mA) | Dimension height (mm) | Dimension width (mm) |
---|---|---|---|---|---|---|---|---|---|---|---|---|
฿ 15,283.33 ฿ 11,462.50 | CIRCIT BRAEAKER | 1 Piece(s) | 76 Day(s) | 10 | [100AF to 199AF] 125AF | 4 | 125 | 30 | 155 | 120 |
Loading...
Rated block capacity AC 400 V(kA) | 30/15 | Dimension depth(mm) | 95 | Specifications | Standard product |
---|---|---|---|---|---|
Rated block capacity AC 230 V(kA) | 50/25 |
Please check the type/dimensions/specifications of the part EW125JAG-4P125B in the G-TWIN Earth Leakage Breaker EW Series JAG (125AF~250AF) series.
Part Number |
---|
EW125JAG-3P050B |
EW125JAG-3P050K |
EW125JAG-3P060B |
EW125JAG-4P125K |
EW160JAG-3P125J |
EW160JAG-3P150J |
Part Number | Price | Minimum Order Qty | Volume Discount | Days to Ship | RoHS | Ampere frame AF | Number of Poles | Rated Current (A) | rate sensitivity current (mA) | Dimension height (mm) | Dimension width (mm) |
---|---|---|---|---|---|---|---|---|---|---|---|
฿ 11,316.67 | 1 Piece(s) | 61 Day(s) | - | [100AF to 199AF] 125AF | 3 | 50 | 30 | 155 | 90 | ||
฿ 11,316.67 | 1 Piece(s) | 61 Day(s) | - | [100AF to 199AF] 125AF | 3 | 50 | 100/200/500/1000 | 155 | 90 | ||
฿ 11,316.67 | 1 Piece(s) | 61 Day(s) | 10 | [100AF to 199AF] 125AF | 3 | 60 | 30 | 155 | 90 | ||
฿ 15,283.33 | 1 Piece(s) | 76 Day(s) | 10 | [100AF to 199AF] 125AF | 4 | 125 | 100/200/500/1000 | 155 | 120 | ||
฿ 18,216.67 | 1 Piece(s) | 61 Day(s) | - | 225AF | 3 | 125 | 100/300/500/1000 | 165 | 105 | ||
฿ 18,216.67 | 1 Piece(s) | 61 Day(s) | - | 225AF | 3 | 150 | 100/300/500/1000 | 165 | 105 |
How can we improve?
How can we improve?