(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
[Features]
·The adhesion length and spring constant are reference values.
·It is adjusted to correspond to various materials.
·Please feel free to contact us if there is a material you would like to purchase.
·Durability and chemical resistance will vary depending on the conditions of use, so be sure to test in advance under conditions of use.
Part Number |
---|
POM/PB-4-8-L40 |
Part Number | Price | Name | Minimum Order Qty. | Volume Discount | Days to Ship | RoHS | Free Length L (mm) | I.D. d (Ø) | O.D. D (Ø) | Spring Constant (N/mm) | Allowable Load (Configurable Range) (N) | Solid Length (mm) |
---|---|---|---|---|---|---|---|---|---|---|---|---|
฿ 247.15 | NCS PLASTIC SPRING | 1 Piece(s) | Available | 7 Day(s) | 10 | - | 4 | 8 | 0.35 | ~1.50 | 24 |
Loading...
Material | POM | End Surface Status | Not Grounded |
---|
Please check the type/dimensions/specifications of the part POM/PB-4-8-L40 in the Polyacetal / Plastic Spring POM / PB series.
Part Number |
---|
POM/PB-1-2-L8 |
POM/PB-4-8-L30 |
POM/PB-5-9-L20 |
POM/PB-5-9-L30 |
POM/PB-5-9-L40 |
POM/PB-5-9-L50 |
Part Number | Price | Minimum Order Qty | Volume Discount | Days to Ship | RoHS | Free Length L (mm) | I.D. d (Ø) | O.D. D (Ø) | Spring Constant (N/mm) | Allowable Load (Configurable Range) (N) | Solid Length (mm) |
---|---|---|---|---|---|---|---|---|---|---|---|
฿ 200.59 | 1 Piece(s) | Available | 7 Day(s) | 10 | 8 | 1 | 2 | 0.24 | ~1.50 | 5 | |
฿ 246.55 | 1 Piece(s) | Available | 7 Day(s) | 10 | - | 4 | 8 | 0.501 | ~1.50 | 18 | |
฿ 245.34 | 1 Piece(s) | Available | 7 Day(s) | 10 | - | - | 9 | 0.546 | ~1.50 | 12 | |
฿ 247.15 | 1 Piece(s) | Available | 7 Day(s) | 10 | - | - | 9 | 0.415 | ~1.50 | 18 | |
฿ 248.97 | 1 Piece(s) | Available | 7 Day(s) | 10 | - | - | 9 | 0.312 | ~1.50 | 24 | |
฿ 252.60 | 1 Piece(s) | Available | 7 Day(s) | 10 | - | - | 9 | 0.259 | ~1.50 | 30 |
How can we improve?
How can we improve?