1. No. of part number of this product, can see and select from the list here
2. Or select spec by configure tab until part number generated
3. Product information available in this area

(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.

    Sales
  • Viewed
    Products
  • My
    Components
  • Cart
Recently Viewed Products
X
My Components
X
Cart Item(s)
X
Loading...
  • Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 8:00 30/6/2024 to 5:00 1/7/2024. We apologize for the inconvenience.
  • แจ้งวันหยุดทำการในเดือน มิถุนายน 2567 | Notice holiday in June 2024 > คลิก

Hinged Hanging Band, HH Hinged Hanging Band, without Turn

Hinged Hanging Band, HH Hinged Hanging Band, without Turn
You can add up to 6 items per a category to the compare list.

Part Number :
  • From :
    ฿ 35.81/Unit
  • Qty :
  • Days to Ship :
    ---
  • Total Price :
    ---

Select part number to Order Now/ Add to Cart

  • CAD Data unavailable

Product Description

[Features]
· This product is a suspension pipe bracket for steel pipe.
· Can also be used for PVC pipes (VP40 ~ 250A).
· Part numbers ending in M indicate the Super M type.
· 175A and 200A or higher are made of flat steel plate without protrusion in the center.
· Hot-dip galvanized 90A and stainless steel 125A or higher are not super M type.

 
Part Number
Z-HH15
Z-HH20
Z-HH25
Z-HH32
Z-HH40
Z-HH50
Z-HH65
Z-HH80
Z-HH100
Z-HH125
Z-HH150
Part NumberPriceNameMinimum Order Qty.Volume DiscountDays to ShipMain Applicable Tube O.D.
(mm)
Surface Treatment Nominal Diameter A

฿ 76.49

SYC PIPE SUPPORT 1 Piece(s) 9 Day(s) 10~Less than 20Zinc Plating15

฿ 78.30

SYC PIPE SUPPORT 1 Piece(s) 9 Day(s) 20~Less than 30Zinc Plating20

฿ 80.71

SYC PIPE SUPPORT 1 Piece(s) 9 Day(s) 20~Less than 30Zinc Plating25

฿ 83.73

SYC PIPE SUPPORT 1 Piece(s) 9 Day(s) 30~Less than 40Zinc Plating32

฿ 86.74

SYC PIPE SUPPORT 1 Piece(s) 9 Day(s) 40~Less than 50Zinc Plating40

฿ 90.96

SYC PIPE SUPPORT 1 Piece(s) 9 Day(s) 40~Less than 50Zinc Plating50

฿ 262.26

SYC PIPE SUPPORT 1 Piece(s) 9 Day(s) 60~Less than 70Zinc Plating65

฿ 280.86

SYC PIPE SUPPORT 1 Piece(s) 9 Day(s) 70~Less than 80Zinc Plating80

฿ 287.75

SYC PIPE SUPPORT 1 Piece(s) 9 Day(s) 80~Less than 90Zinc Plating100

฿ 423.81

SYC PIPE SUPPORT 1 Piece(s) 9 Day(s) 100~Less than 200Zinc Plating125

฿ 463.72

SYC PIPE SUPPORT 1 Piece(s) 9 Day(s) 100~Less than 200Zinc Plating150

Loading...

  1. 1

Basic Information

Type Hanging Band Material Steel Applicable Tube Type Steel pipe