(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
[Features]
• A suspension pipe fixture turn set product for steel pipe.
• Can also be used for PVC pipes (VP40 ~ 250A).
• Part numbers ending in M indicate the Super M type.
• Contact us for changes to the turn set.
• Regarding changes to suspension tongue size, use greater than standard diameter.
• Please confirm delivery date for 200 A and larger bright chromate products, 150 A and larger, stainless steel products and no-turn galvanized products.
Part Number |
---|
Z-KHT15 |
Z-KHT20 |
Z-KHT25 |
Z-KHT32 |
Z-KHT40 |
Z-KHT50 |
Z-KHT65 |
Z-KHT80 |
Z-KHT100 |
Z-KHT125 |
Z-KHT150 |
Z-KHT200 |
Part Number | Price | Name | Minimum Order Qty. | Volume Discount | Days to Ship | Main Applicable Tube O.D. (mm) | Material | Surface Treatment | Nominal Diameter A | Specifications |
---|---|---|---|---|---|---|---|---|---|---|
฿ 60.81 | SYC PIPE SUPPORT | 1 Piece(s) | 9 Day(s) | 20~Less than 30 | Steel | Zinc Plating | 15 | With Turnbuckle | ||
฿ 64.43 | SYC PIPE SUPPORT | 1 Piece(s) | 9 Day(s) | 20~Less than 30 | Steel | Zinc Plating | 20 | With Turnbuckle | ||
฿ 64.43 | SYC PIPE SUPPORT | 1 Piece(s) | 9 Day(s) | 30~Less than 40 | Steel | Zinc Plating | 25 | With Turnbuckle | ||
฿ 74.68 | SYC PIPE SUPPORT | 1 Piece(s) | 9 Day(s) | 40~Less than 50 | Steel | Zinc Plating | 32 | With Turnbuckle | ||
฿ 76.49 | SYC PIPE SUPPORT | 1 Piece(s) | 9 Day(s) | 40~Less than 50 | Steel | Zinc Plating | 40 | With Turnbuckle | ||
฿ 83.12 | SYC PIPE SUPPORT | 1 Piece(s) | 9 Day(s) | 60~Less than 70 | Steel | Zinc Plating | 50 | With Turnbuckle | ||
฿ 275.44 | SYC PIPE SUPPORT | 1 Piece(s) | 9 Day(s) | 70~Less than 80 | Steel | Zinc Plating | 65 | With Turnbuckle | ||
฿ 280.86 | SYC PIPE SUPPORT | 1 Piece(s) | 9 Day(s) | 80~Less than 90 | Steel | Zinc Plating | 80 | With Turnbuckle | ||
฿ 293.19 | SYC PIPE SUPPORT | 1 Piece(s) | 9 Day(s) | 90~Less than 100 | Steel | Zinc Plating | 100 | With Turnbuckle | ||
฿ 401.44 | SYC PIPE SUPPORT | 1 Piece(s) | 9 Day(s) | 100~Less than 200 | Steel | Zinc Plating | 125 | With Turnbuckle | ||
฿ 493.35 | SYC PIPE SUPPORT | 1 Piece(s) | 9 Day(s) | 100~Less than 200 | Steel | Zinc Plating | 150 | With Turnbuckle | ||
฿ 3,300.00 | SYC PIPE SUPPORT | 1 Piece(s) | 9 Day(s) | 200~Less than 300 | Steel | Zinc Plating | 200 | With Turnbuckle |
Loading...
Type | Hanging Band | Applicable Tube Type | Steel pipe |
---|
How can we improve?
How can we improve?