(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
Brand-name products provided by MISUMI-VONA are carefully-selected from the products of Asian manufacturers and offered based on customers' needs. Please select the right item for your individual usage environment. A Korean manufacturer established in 1987. Excellent variations on cable carriers, making the price more affordable. A no waste design with a selectable number of link unit.
Part Number | Price | Name | Minimum Order Qty. | Volume Discount | Days to Ship | RoHS | Number of Divided Sections inside Carrier | Bending radius R (mm) | Number of Links | Required Physical Height H (mm) |
---|---|---|---|---|---|---|---|---|---|---|
฿ 16,427.23 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 42 | 460 | ||
฿ 16,770.19 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 43 | 460 | ||
฿ 17,112.00 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 44 | 460 | ||
฿ 17,493.68 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 45 | 460 | ||
฿ 17,836.26 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 46 | 460 | ||
฿ 18,178.84 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 47 | 460 | ||
฿ 18,560.52 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 48 | 460 | ||
฿ 18,903.10 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 49 | 460 | ||
฿ 19,245.29 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 50 | 460 | ||
฿ 19,627.35 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 51 | 460 | ||
฿ 19,969.55 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 52 | 460 | ||
฿ 20,312.13 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 53 | 460 | ||
฿ 20,693.81 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 54 | 460 | ||
฿ 21,036.39 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 55 | 460 | ||
฿ 21,378.97 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 56 | 460 | ||
฿ 21,760.65 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 57 | 460 | ||
฿ 22,102.84 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 58 | 460 | ||
฿ 22,445.42 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 59 | 460 | ||
฿ 22,827.10 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 60 | 460 | ||
฿ 23,169.68 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 61 | 460 | ||
฿ 23,512.26 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 62 | 460 | ||
฿ 23,893.94 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 63 | 460 | ||
฿ 24,235.74 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 64 | 460 | ||
฿ 24,578.71 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 65 | 460 | ||
฿ 24,960.00 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 66 | 460 | ||
฿ 25,302.97 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 67 | 460 | ||
฿ 25,645.55 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 68 | 460 | ||
฿ 26,027.23 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 69 | 460 | ||
฿ 26,369.03 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 70 | 460 | ||
฿ 26,711.61 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 71 | 460 | ||
฿ 27,093.29 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 72 | 460 | ||
฿ 27,435.87 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 73 | 460 | ||
฿ 27,778.84 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 74 | 460 | ||
฿ 28,160.13 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 75 | 460 | ||
฿ 28,503.10 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 76 | 460 | ||
฿ 28,844.90 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 77 | 460 | ||
฿ 29,226.58 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 78 | 460 | ||
฿ 29,569.16 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 79 | 460 | ||
฿ 29,911.74 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 80 | 460 | ||
฿ 30,293.42 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 81 | 460 | ||
฿ 30,636.00 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 82 | 460 | ||
฿ 30,978.19 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 83 | 460 | ||
฿ 31,359.87 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 84 | 460 | ||
฿ 31,702.45 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 85 | 460 | ||
฿ 32,045.03 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 86 | 460 | ||
฿ 32,426.71 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 87 | 460 | ||
฿ 32,769.29 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 88 | 460 | ||
฿ 33,111.48 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 89 | 460 | ||
฿ 33,492.77 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 90 | 460 | ||
฿ 33,835.74 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 91 | 460 | ||
฿ 34,178.32 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 92 | 460 | ||
฿ 34,560.00 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 93 | 460 | ||
฿ 34,902.58 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 94 | 460 | ||
฿ 35,244.39 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 95 | 460 | ||
฿ 35,626.84 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 96 | 460 | ||
฿ 35,968.65 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 97 | 460 | ||
฿ 36,311.61 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 98 | 460 | ||
฿ 36,692.90 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 99 | 460 | ||
฿ 37,035.87 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 100 | 460 | ||
฿ 37,378.45 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 101 | 460 | ||
฿ 37,760.13 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 102 | 460 | ||
฿ 38,101.94 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 103 | 460 | ||
฿ 38,444.52 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 104 | 460 | ||
฿ 38,826.19 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 105 | 460 | ||
฿ 39,168.77 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 106 | 460 | ||
฿ 39,511.74 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 107 | 460 | ||
฿ 39,893.03 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 108 | 460 | ||
฿ 40,235.23 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 109 | 460 | ||
฿ 40,577.81 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 110 | 460 | ||
฿ 40,959.48 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 111 | 460 | ||
฿ 41,302.06 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 112 | 460 | ||
฿ 41,644.65 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 113 | 460 | ||
฿ 42,026.32 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 114 | 460 | ||
฿ 42,368.52 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 115 | 460 | ||
฿ 42,711.10 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 116 | 460 | ||
฿ 43,092.77 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 117 | 460 | ||
฿ 43,435.35 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 118 | 460 | ||
฿ 43,777.94 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 119 | 460 | ||
฿ 44,159.61 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 120 | 460 | ||
฿ 44,502.19 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 121 | 460 | ||
฿ 44,844.39 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 122 | 460 | ||
฿ 45,225.68 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 123 | 460 | ||
฿ 45,568.65 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 124 | 460 | ||
฿ 45,911.23 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 125 | 460 | ||
฿ 46,292.90 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 126 | 460 | ||
฿ 46,635.48 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Two] Width 2 separate | 200 | 127 | 460 | ||
฿ 7,366.06 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Three] Width 3 separate | 200 | 16 | 460 | ||
฿ 7,707.87 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Three] Width 3 separate | 200 | 17 | 460 | ||
฿ 8,129.03 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Three] Width 3 separate | 200 | 18 | 460 | ||
฿ 8,471.61 | HNS CABLE CARRIER HSC | 1 Piece(s) | 9 Day(s) | 10 | [Horizontally divided into Three] Width 3 separate | 200 | 19 | 460 |
Loading...
Type | Square type | Cover Type | One Side Cover Type | Properties | Standard |
---|---|---|---|---|---|
Height of Inside(mm) | 42 | Width of Inside(mm) | 150 | Maximum Cable Outer Diameter(Ø) | 33 |
Operating Speed(m/s) | 3.3 | Link Pitch(mm) | 66.5 | Cable Insertion Surface | Inner Peripheral Surface |
Cable Insertion Type | Snap(Opening and Closing) | Motion Type | 2-Axis motion | Operating Temperature Range(°C) | -40::100 |
Carrier Material | Resin | Note | One bracket is included for each of the fixed side and moving side |
How can we improve?
How can we improve?