(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
[Features]
・ 5K Threaded Type Flange (JIS B 2239 compliant or compliant)
・ The material is black-heart malleable cast iron or ductile cast iron, which is 1.5 times stronger than gray cast iron and tough
・ Since thread cutting is performed by a strictly controlled machine, the thread axis, angle, thread shape, and thread fitting are all correct threaded-type flanges that comply with JIS standards
・ CK cast iron compound flange is strictly checked at each point of the manufacturing process such as material inspection, model inspection, raw material inspection, product inspection, so you can use it with confidence as a flange with stable quality
[Applications]
・ Ideal for threaded flange connection
Connecting Shape | Flange | Connection Type | Flange | Material | Cast Iron |
---|---|---|---|---|---|
Connection Thread Type M1 | Rc | Type | Fitting | Max. Operating Pressure(MPa) | 1 |
Divisions of Max. Operating Pressure | 1.0Mpa or Less | Interior Resin Lining | No |
Please check the type/dimensions/specifications of the part 5KF-40-B in the CK Cast-Iron Mating Companion Flange 5K Flange series.
Part Number |
---|
5KF-125-B |
5KF-125-C |
5KF-125-W |
5KF-40-C |
5KF-40-W |
5KF-50-B |
Part Number | Price | Minimum Order Qty | Volume Discount | Days to Ship | Nominal of Thread M1 | Applicable Fluid | Surface Treatment |
---|---|---|---|---|---|---|---|
฿ 868.58 | 1 Piece(s) | 6 Day(s) | 5B(125A) | - | No | ||
฿ 1,665.29 | 1 Piece(s) | 6 Day(s) | 5B(125A) | Water | Resin Coating | ||
฿ 1,272.95 | 1 Piece(s) | 6 Day(s) | 5B(125A) | Oil / Air / Water / Gas / Steam | Zinc Plating | ||
฿ 440.39 | 1 Piece(s) | 6 Day(s) | 1 1/2B(40A) | Water | Resin Coating | ||
฿ 288.62 | 1 Piece(s) | 3 Day(s) | 1 1/2B(40A) | Oil / Air / Water / Gas / Steam | Zinc Plating | ||
฿ 241.45 | 1 Piece(s) | 6 Day(s) | 2B(50A) | - | No |
How can we improve?
How can we improve?