(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
[Thread ridge type] Tap-Tight
[Nominal Thread (M)] 3
[Detailed shape] Pan
[Mounting hole dimensions] Phillips
[Basic shape] Standard (Round)
[Materials] Steel
[Tip shape] Flat End
[Additional shapes] Washer Insert
[Sales unit] Box/package
[Length L (mm)] 6 8 10 12
[Surface treatment] Trivalent chromate, Trivalent black, Trivalent white, Bright chromate plating, Chromate plating, Chromate plating, Black chromate
Thread Type | Tap-Tight | Nominal of Thread (M) | 3 | Detailed Shape | Pan |
---|---|---|---|---|---|
Mounting Hole Shape | Phillips | Basic Shape | Standard (Round) | Material | Steel |
Tip Shape | Flat End | Additional Shape | Washer Included | Sales Unit | Box/package |
Please check the type/dimensions/specifications of the part CSPPNHNDBLO2-ST3W-TPT3-8 in the Tap-Tight B Type Pan Screw LO=2 (Internal Tooth SW) series.
Part Number |
---|
CSPPNHNDBLO2-ST3B-TPT3-12 |
CSPPNHNDBLO2-ST3B-TPT3-8 |
CSPPNHNDBLO2-ST3W-TPT3-6 |
CSPPNHNDBLO2-STC-TPT3-12 |
CSPPNHNDBLO2-STC-TPT3-8 |
CSPPNHNDBLO2-STCB-TPT3-12 |
Part Number | Price | Minimum Order Qty | Number of pc(s). included in pkg. | Volume Discount | Days to Ship | RoHS | Length L (mm) | Surface Treatment |
---|---|---|---|---|---|---|---|---|
฿ 4,930.39 | 1 Pack(s) | 2,500 Pieces Per Package | 6 Day(s) | 10 | 12 | [Trivalent Chromate] Trivalent Black | ||
฿ 5,237.81 | 1 Pack(s) | 3,000 Pieces Per Package | 6 Day(s) | 10 | 8 | [Trivalent Chromate] Trivalent Black | ||
฿ 5,112.30 | 1 Pack(s) | 4,000 Pieces Per Package | 15 Day(s) | 10 | 6 | [Trivalent Chromate] Trivalent White | ||
฿ 4,007.12 | 1 Pack(s) | 2,500 Pieces Per Package | 15 Day(s) | - | 12 | [Chromate Plating] Chromate Plating | ||
฿ 3,891.77 | 1 Pack(s) | 3,000 Pieces Per Package | 15 Day(s) | - | 8 | [Chromate Plating] Chromate Plating | ||
฿ 4,320.13 | 1 Pack(s) | 2,500 Pieces Per Package | 15 Day(s) | - | 12 | [Chromate Plating] Black Chromate |
How can we improve?
How can we improve?