(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
[Features]
▪ Pin holes and corrosion leaks of steel tube straight pipes can be repaired.
▪ It is best for preventing any type of fluid leakage from the pipes. The fluid can be water, hot water, oil, or vapor.
▪ Two types of pressure bonding sockets are available: long-size and half size.
Part Number |
---|
L15A |
L15AX1/2 |
L20A |
L20AX1/2 |
L25A |
L25AX1/2 |
L32A |
L32AX1/2 |
L40A |
L40AX1/2 |
L50A |
L50AX1/2 |
L65A |
L65AX1/2 |
L80A |
L80AX1/2 |
L100A |
L100AX1/2 |
Part Number | Price | Name | Minimum Order Qty. | Volume Discount | Days to Ship | Nominal Diameter | D (mm) | d (mm) | W (mm) | L (mm) | Hex Wrench Used (mm) |
---|---|---|---|---|---|---|---|---|---|---|---|
฿ 3,224.17 | KDK SOCKET FOR STEEL PIPE | 1 Piece(s) | 7 Day(s) | 15A | 37 | 21 | 72 | 80 | 6 | ||
฿ 2,029.28 | KDK SOCKET FOR STEEL PIPE | 1 Piece(s) | 9 Day(s) | 15A | 37 | 21 | 72 | 40 | 6 | ||
฿ 3,224.17 | KDK SOCKET FOR STEEL PIPE | 1 Piece(s) | 7 Day(s) | 20A | 43 | 27 | 72 | 80 | 6 | ||
฿ 2,073.21 | KDK SOCKET FOR STEEL PIPE | 1 Piece(s) | 5 Day(s) | 20A | 43 | 27 | 72 | 40 | 6 | ||
฿ 3,444.29 | KDK SOCKET FOR STEEL PIPE | 1 Piece(s) | 7 Day(s) | 25A | 49 | 33 | 78 | 80 | 6 | ||
฿ 2,186.50 | KDK SOCKET FOR STEEL PIPE | 1 Piece(s) | 9 Day(s) | 25A | 49 | 33 | 78 | 40 | 6 | ||
฿ 3,813.48 | KDK SOCKET FOR STEEL PIPE | 1 Piece(s) | 7 Day(s) | 32A | 59 | 42 | 96 | 104 | 8 | ||
฿ 2,511.87 | KDK SOCKET FOR STEEL PIPE | 1 Piece(s) | 9 Day(s) | 32A | 59 | 42 | 96 | 52 | 8 | ||
฿ 4,127.07 | KDK SOCKET FOR STEEL PIPE | 1 Piece(s) | 7 Day(s) | 40A | 67 | 48 | 107 | 120 | 8 | ||
฿ 2,705.42 | KDK SOCKET FOR STEEL PIPE | 1 Piece(s) | 9 Day(s) | 40A | 67 | 48 | 107 | 60 | 8 | ||
฿ 4,597.45 | KDK SOCKET FOR STEEL PIPE | 1 Piece(s) | 7 Day(s) | 50A | 79 | 59 | 117 | 120 | 8 | ||
฿ 2,972.62 | KDK SOCKET FOR STEEL PIPE | 1 Piece(s) | 9 Day(s) | 50A | 79 | 59 | 117 | 60 | 8 | ||
฿ 6,635.75 | KDK SOCKET FOR STEEL PIPE | 1 Piece(s) | 9 Day(s) | 65A | 100 | 75 | 145 | 140 | 10 | ||
฿ 3,944.77 | KDK SOCKET FOR STEEL PIPE | 1 Piece(s) | 9 Day(s) | 65A | 100 | 75 | 145 | 70 | 10 | ||
฿ 8,517.26 | KDK SOCKET FOR STEEL PIPE | 1 Piece(s) | 9 Day(s) | 80A | 116 | 88 | 165 | 160 | 10 | ||
฿ 4,606.98 | KDK SOCKET FOR STEEL PIPE | 1 Piece(s) | 9 Day(s) | 80A | 116 | 88 | 165 | 80 | 10 | ||
฿ 10,085.19 | KDK SOCKET FOR STEEL PIPE | 1 Piece(s) | 9 Day(s) | 100A | 142 | 112 | 195 | 160 | 10 | ||
฿ 5,547.74 | KDK SOCKET FOR STEEL PIPE | 1 Piece(s) | 9 Day(s) | 100A | 142 | 112 | 195 | 80 | 10 |
Loading...
Material | Steel | Pressure Resistance(Mpa) | 2 | Heat Resistant Temperature(℃) | -30~130 |
---|
How can we improve?
How can we improve?