(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
Lightweight and low cost mechanical pipe fitting with excellent corrosion resistance.
[Features]
· Low cost was achieved by simplifying the components while adopting SUS316, which is highly resistant to rust and other corrosion, for the main body (U bar structure is patented).
· Compact and lighter than other fittings in spite of high performance.
· Therefore, construction in narrow work spaces is easy.
· Secondary processing such as threading and grooving is not required at all due to unique a structure that prevents pipe disconnection, thus enabling reductions in processing cost and working time.
Part Number | Price | Name | Minimum Order Qty. | Volume Discount | Days to Ship | Applicable Plumbing | Applicable Fluid | Nominal Diameter | Maximum Pressure Gas used [There are limites in the usage condition] (MPa) | Rubber Sleeve Material | Inner Plate |
---|---|---|---|---|---|---|---|---|---|---|---|
฿ 1,858.44 ฿ 1,035.52 | SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | Same day | Steel pipe / Stainless Steel Pipe | Water / Air / Chemical | 20A | 1.6 | EPDM | No | ||
฿ 2,098.97 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 5 Day(s) | Steel pipe / Stainless Steel Pipe | Water / Air / Organic Gas / Oils and Fats | 20A | 1.6 | NBR | No | ||
฿ 1,924.78 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 3 Day(s) | Steel pipe / Stainless Steel Pipe | Water / Air / Chemical | 25A | 1.6 | EPDM | No | ||
฿ 2,171.35 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 5 Day(s) | Steel pipe / Stainless Steel Pipe | Water / Air / Organic Gas / Oils and Fats | 25A | 1.6 | NBR | No | ||
฿ 1,976.83 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 4 Day(s) | Steel pipe / Stainless Steel Pipe | Water / Air / Chemical | 32A | 1.6 | EPDM | No | ||
฿ 2,265.42 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 5 Day(s) | Steel pipe / Stainless Steel Pipe | Water / Air / Organic Gas / Oils and Fats | 32A | 1.6 | NBR | No | ||
฿ 2,076.33 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 4 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 40A | 1.6 | EPDM | No | ||
฿ 2,403.97 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 5 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 40A | 1.6 | NBR | No | ||
฿ 2,346.62 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 3 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 50A | 1.6 | EPDM | No | ||
฿ 2,608.93 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 5 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 50A | 1.6 | NBR | No | ||
฿ 3,591.62 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 4 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 65A | 1.6 | EPDM | No | ||
฿ 3,327.29 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 5 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 65A | 1.6 | NBR | No | ||
฿ 3,598.21 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 5 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 80A | 1.6 | EPDM | No | ||
฿ 3,598.21 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 5 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 80A | 1.6 | NBR | No | ||
฿ 3,970.74 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 5 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 100A | 1.6 | EPDM | No | ||
฿ 4,040.89 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 5 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 100A | 1.6 | NBR | No | ||
฿ 6,307.51 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 5 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 125A | 1.6 | EPDM | No | ||
฿ 6,307.51 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 5 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 125A | 1.6 | NBR | No | ||
฿ 8,102.32 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 5 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 150A | 1.3 | EPDM | No | ||
฿ 8,102.32 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 5 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 150A | 1.3 | NBR | No | ||
฿ 16,433.07 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 5 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 200A | 1.0 | EPDM | No | ||
฿ 16,433.07 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 5 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 200A | 1.0 | NBR | No | ||
฿ 2,243.65 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 6 Day(s) | Steel pipe / Stainless Steel Pipe | Water / Air / Chemical | 20A | 1.6 | EPDM | Equipped Products | ||
฿ 2,243.65 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 6 Day(s) | Steel pipe / Stainless Steel Pipe | Water / Air / Organic Gas / Oils and Fats | 20A | 1.6 | NBR | Equipped Products | ||
฿ 2,345.24 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 6 Day(s) | Steel pipe / Stainless Steel Pipe | Water / Air / Chemical | 25A | 1.6 | EPDM | Equipped Products | ||
฿ 2,345.24 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 6 Day(s) | Steel pipe / Stainless Steel Pipe | Water / Air / Organic Gas / Oils and Fats | 25A | 1.6 | NBR | Equipped Products | ||
฿ 2,429.89 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 6 Day(s) | Steel pipe / Stainless Steel Pipe | Water / Air / Chemical | 32A | 1.6 | EPDM | Equipped Products | ||
฿ 2,429.89 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 6 Day(s) | Steel pipe / Stainless Steel Pipe | Water / Air / Organic Gas / Oils and Fats | 32A | 1.6 | NBR | Equipped Products | ||
฿ 2,582.28 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 6 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 40A | 1.6 | EPDM | Equipped Products | ||
฿ 2,582.28 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 6 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 40A | 1.6 | NBR | Equipped Products | ||
฿ 2,768.53 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 6 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 50A | 1.6 | EPDM | Equipped Products | ||
฿ 2,768.53 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 6 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 50A | 1.6 | NBR | Equipped Products | ||
฿ 3,598.18 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 7 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 65A | 1.6 | EPDM | Equipped Products | ||
฿ 3,598.18 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 6 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 65A | 1.6 | NBR | Equipped Products | ||
฿ 3,886.02 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 6 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 80A | 1.6 | EPDM | Equipped Products | ||
฿ 3,886.02 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 6 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 80A | 1.6 | NBR | Equipped Products | ||
฿ 4,309.31 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 6 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 100A | 1.6 | EPDM | Equipped Products | ||
฿ 4,309.31 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 6 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 100A | 1.6 | NBR | Equipped Products | ||
฿ 6,679.74 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 6 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 125A | 1.6 | EPDM | Equipped Products | ||
฿ 6,679.74 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 6 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 125A | 1.6 | NBR | Equipped Products | ||
฿ 8,508.37 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 6 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 150A | 1.3 | EPDM | Equipped Products | ||
฿ 8,508.37 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 6 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 150A | 1.3 | NBR | Equipped Products | ||
฿ 17,041.93 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 6 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 200A | 1.0 | EPDM | Equipped Products | ||
฿ 17,041.93 | SBC SBCCOUPLING FOR MECHANICAL | 1 Piece(s) | 6 Day(s) | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 200A | 1.0 | NBR | Equipped Products |
Loading...
Type | Joint | Casing Material | SUS316 | Tightening Bolt Type | Hexagon socket head bolt |
---|
How can we improve?
How can we improve?