(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
Hinge type handing band for SGP pipes and stainless steel pipes (thick pipe)
[Features]
· Hinged hanging band for use with SGP pipes.
· 175A or higher are made of flat steel without ribs.
· For 350A or higher, a reinforcement plate is welded to the band lug part.
· Can be used for VP pipes of up to 300 A. (VP20, VP25, and VP30 are sizes for specific VP tubes).
· Zinc Zinc Plating Finish
Part Number | Price | Name | Minimum Order Qty. | Volume Discount | Days to Ship | Main fit tube(or application tube)outside diameter (mm) | Material | Applicable Tube Type | Surface Treatment | Nominal Diameter (A) | Nominal Diameter (B) | Compatible Pipe Outer Diameter (mm) |
---|---|---|---|---|---|---|---|---|---|---|---|---|
฿ 44.78 | AKG PIPE HANGERS | 1 Piece(s) | 12 Day(s) | 10~Less than 20 | Steel | SGP Pipe | [Zinc Plating] Electrolytic Zinc Plating | 10A | 3/8 | 17.3 | ||
฿ 21.91 | AKG PIPE HANGERS | 1 Piece(s) | Available | 3 Day(s) | 20~Less than 30 | Steel | SGP Pipe | [Zinc Plating] Electrolytic Zinc Plating | 15A | 1/2 | 21.7 | |
฿ 23.81 | AKG PIPE HANGERS | 1 Piece(s) | Available | 3 Day(s) | 20~Less than 30 | Steel | SGP Pipe | [Zinc Plating] Electrolytic Zinc Plating | 20A | 3/4 | 27.2 | |
฿ 94.01 | PIPE HANGERS | 1 Piece(s) | Available | 3 Day(s) | 30~Less than 40 | Steel | SGP Pipe | [Zinc Plating] Electrolytic Zinc Plating | 25A | 1 | 34 | |
฿ 31.48 | AKG PIPE HANGERS | 1 Piece(s) | 3 Day(s) | 40~Less than 50 | Steel | SGP Pipe | [Zinc Plating] Electrolytic Zinc Plating | 32A | 1 1/4 | 42.7 | ||
฿ 31.43 | AKG PIPE HANGERS | 1 Piece(s) | Available | 5 Day(s) | 40~Less than 50 | Steel | SGP Pipe | [Zinc Plating] Electrolytic Zinc Plating | 40A | 1 1/2 | 48.6 | |
฿ 33.90 | AKG PIPE HANGERS | 1 Piece(s) | 5 Day(s) | 60~Less than 70 | Steel | SGP Pipe | [Zinc Plating] Electrolytic Zinc Plating | 50A | 2 | 60.5 | ||
฿ 45.72 | AKG PIPE HANGERS | 1 Piece(s) | Available | 3 Day(s) | 70~Less than 80 | Steel | SGP Pipe | [Zinc Plating] Electrolytic Zinc Plating | 65A | 2 1/2 | 76.3 | |
฿ 39.95 | AKG PIPE HANGERS | 1 Piece(s) | 3 Day(s) | 80~Less than 90 | Steel | SGP Pipe | [Zinc Plating] Electrolytic Zinc Plating | 80A | 3 | 89.1 | ||
฿ 76.23 | AKG PIPE HANGERS | 1 Piece(s) | 8 Day(s) | 100~Less than 200 | Steel | SGP Pipe | [Zinc Plating] Electrolytic Zinc Plating | 90A | 3 1/2 | 101.6 | ||
฿ 56.00 | AKG PIPE HANGERS | 1 Piece(s) | Available | 3 Day(s) | 100~Less than 200 | Steel | SGP Pipe | [Zinc Plating] Electrolytic Zinc Plating | 100A | 4 | 114.3 | |
฿ 98.67 | AKG PIPE HANGERS | 1 Piece(s) | Available | 5 Day(s) | 100~Less than 200 | Steel | SGP Pipe | [Zinc Plating] Electrolytic Zinc Plating | 125A | 5 | 139.8 | |
฿ 113.15 | AKG PIPE HANGERS | 1 Piece(s) | Available | 3 Day(s) | 100~Less than 200 | Steel | SGP Pipe | [Zinc Plating] Electrolytic Zinc Plating | 150A | 6 | 165.2 | |
฿ 336.77 | AKG PIPE HANGERS | 1 Piece(s) | 8 Day(s) | 100~Less than 200 | Steel | SGP Pipe | [Zinc Plating] Electrolytic Zinc Plating | 175A | 7 | 190.7 | ||
฿ 216.77 | AKG PIPE HANGERS | 1 Piece(s) | 3 Day(s) | 200~Less than 300 | Steel | SGP Pipe | [Zinc Plating] Electrolytic Zinc Plating | 200A | 8 | 216.3 | ||
฿ 792.00 | AKG PIPE HANGERS | 1 Piece(s) | 11 Day(s) | 200~Less than 300 | Steel | SGP Pipe | [Zinc Plating] Electrolytic Zinc Plating | 250A | 10 | 267.4 | ||
฿ 1,340.19 | AKG PIPE HANGERS | 1 Piece(s) | 11 Day(s) | 300~Less than 400 | Steel | SGP Pipe | [Zinc Plating] Electrolytic Zinc Plating | 300A | 12 | 318.5 | ||
฿ 1,764.96 | AKG PIPE HANGERS | 1 Piece(s) | 11 Day(s) | 300~Less than 400 | Steel | SGP Pipe | [Zinc Plating] Electrolytic Zinc Plating | 350A | 14 | 355.6 | ||
฿ 2,331.05 | AKG PIPE HANGERS | 1 Piece(s) | 11 Day(s) | 400~Less than 500 | Steel | SGP Pipe | [Zinc Plating] Electrolytic Zinc Plating | 400A | 16 | 406.4 | ||
฿ 52.87 | AKG PIPE HANGERS | 1 Piece(s) | 5 Day(s) | 30~Less than 40 | Steel | SGP Pipe | [Zinc Plating] Electrolytic Zinc Plating | VP25 | V-25 | 32 | ||
฿ 70.18 | AKG PIPE HANGERS | 1 Piece(s) | 12 Day(s) | 20~Less than 30 | Steel | SGP Pipe | [Zinc Plating] Hot zinc plating (dip plating) | 15A | 1/2 | 21.7 | ||
฿ 73.21 | AKG PIPE HANGERS | 1 Piece(s) | 12 Day(s) | 20~Less than 30 | Steel | SGP Pipe | [Zinc Plating] Hot zinc plating (dip plating) | 20A | 3/4 | 27.2 | ||
฿ 87.24 | AKG PIPE HANGERS | 1 Piece(s) | Available | 17 Day(s) | 30~Less than 40 | Steel | SGP Pipe | [Zinc Plating] Hot zinc plating (dip plating) | 25A | 1 | 34 | |
฿ 91.81 | AKG PIPE HANGERS | 1 Piece(s) | Available | 17 Day(s) | 40~Less than 50 | Steel | SGP Pipe | [Zinc Plating] Hot zinc plating (dip plating) | 32A | 1 1/4 | 42.7 | |
฿ 95.24 | AKG PIPE HANGERS | 1 Piece(s) | Available | 17 Day(s) | 40~Less than 50 | Steel | SGP Pipe | [Zinc Plating] Hot zinc plating (dip plating) | 40A | 1 1/2 | 48.6 | |
฿ 102.86 | AKG PIPE HANGERS | 1 Piece(s) | Available | 17 Day(s) | 60~Less than 70 | Steel | SGP Pipe | [Zinc Plating] Hot zinc plating (dip plating) | 50A | 2 | 60.5 | |
฿ 149.34 | AKG PIPE HANGERS | 1 Piece(s) | Available | 17 Day(s) | 70~Less than 80 | Steel | SGP Pipe | [Zinc Plating] Hot zinc plating (dip plating) | 65A | 2 1/2 | 76.3 | |
฿ 155.43 | AKG PIPE HANGERS | 1 Piece(s) | Available | 17 Day(s) | 80~Less than 90 | Steel | SGP Pipe | [Zinc Plating] Hot zinc plating (dip plating) | 80A | 3 | 89.1 | |
฿ 171.05 | AKG PIPE HANGERS | 1 Piece(s) | Available | 17 Day(s) | 100~Less than 200 | Steel | SGP Pipe | [Zinc Plating] Hot zinc plating (dip plating) | 100A | 4 | 114.3 | |
฿ 443.43 | AKG PIPE HANGERS | 1 Piece(s) | Available | 17 Day(s) | 100~Less than 200 | Steel | SGP Pipe | [Zinc Plating] Hot zinc plating (dip plating) | 125A | 5 | 139.8 | |
฿ 528.00 | AKG PIPE HANGERS | 1 Piece(s) | Available | 17 Day(s) | 100~Less than 200 | Steel | SGP Pipe | [Zinc Plating] Hot zinc plating (dip plating) | 150A | 6 | 165.2 |
Loading...
Type | Hanging Band | Qty.(piece) | 1 |
---|
How can we improve?
How can we improve?