(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
[Features]
· This screw-in connection type fitting for medium and small bore steel pipes is used as a "Screw-in type malleable cast iron pipe fitting" specified in JISB2301.
· Some products which are not subject to JIS standards are also manufactured.
· Main material is Malleable (black heart malleable cast iron) and the thread section is tapered for pipes. Hot-dip galvanizing is applied when surface treatment is necessary.
· Hot-dip galvanizing used is a superior form of plating that helps reduce environmental load.
Connecting Shape | Bushings | Connection Type | Screw⇔Screw Different Diameter | Material | FCMB27-05 |
---|---|---|---|---|---|
Connection Thread Type M1 | R | Connection Thread Type M2 | Rc | Applicable Fluid | Water / Air / Steam / Gas / Oil |
Type | Fitting | Max. Operating Pressure(MPa) | 2.5 | Divisions of Max. Operating Pressure | than 2.0Mpa |
Interior Resin Lining | No |
Please check the type/dimensions/specifications of the part BU-25X20A-B in the Pipe Fitting, Bushing series.
Part Number |
---|
BU-100X32A-W |
BU-100X40A-W |
BU-100X50A-W |
BU-25X20A-W |
BU-25X6A-W |
BU-25X8A-B |
Part Number | Price | Minimum Order Qty | Volume Discount | Days to Ship | Nominal of Thread M1 | Nominal of Thread M2 | Surface Treatment |
---|---|---|---|---|---|---|---|
฿ 1,538.85 | 1 Piece(s) | 5 Day(s) | 4B(100A) | 1 1/4B(32A) | [Zinc Plating] Hot zinc plating | ||
฿ 1,538.85 | 1 Piece(s) | 5 Day(s) | 4B(100A) | 1 1/2B(40A) | [Zinc Plating] Hot zinc plating | ||
฿ 1,659.35 | 1 Piece(s) | 7 Day(s) | 4B(100A) | 2B(50A) | [Zinc Plating] Hot zinc plating | ||
฿ 145.06 | 1 Piece(s) | 5 Day(s) | 1B(25A) | 3/4B(20A) | [Zinc Plating] Hot zinc plating | ||
฿ 154.85 | 1 Piece(s) | 7 Day(s) | 1B(25A) | 1/8B(6A) | [Zinc Plating] Hot zinc plating | ||
฿ 146.41 | 1 Piece(s) | 5 Day(s) | 1B(25A) | 1/4B(8A) | [Not Provided] No |
How can we improve?
How can we improve?