(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
Chamfering end mill with the angle that can be freely selected in 1° increments
Part Number |
---|
MEM2S10-[60-160/1] |
MEM2S11-[60-160/1] |
MEM2S12-[60-160/1] |
MEM2S13-[60-160/1] |
MEM2S14-[60-160/1] |
MEM2S15-[60-160/1] |
MEM2S16-[60-160/1] |
MEM2S18-[60-160/1] |
MEM2S20-[60-160/1] |
MEM2S22-[60-160/1] |
MEM2S25-[60-160/1] |
V-MEM2S10-[60-160/1] |
V-MEM2S11-[60-160/1] |
V-MEM2S12-[60-160/1] |
V-MEM2S13-[60-160/1] |
V-MEM2S14-[60-160/1] |
V-MEM2S15-[60-160/1] |
V-MEM2S16-[60-160/1] |
V-MEM2S18-[60-160/1] |
V-MEM2S20-[60-160/1] |
V-MEM2S22-[60-160/1] |
V-MEM2S25-[60-160/1] |
Part Number | Price | Name | Minimum Order Qty. | Volume Discount | Days to Ship | Double Angle (θ) | Outer Diameter (D) (mm) | Work Material | Coating Presence | Coating Type | Shank Diameter (d) | Flute Length ℓ | Overall Length L | Under Neck Angle θ2 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
- | END MILL | 1 Piece(s) | 5 Day(s) | 60 ~ 160 | 10 | General Steel[○] / Cast Iron[○] / Aluminum[○] / Copper[○] | None | - | 10 | 18 | 70 | - | ||
- | END MILL | 1 Piece(s) | 5 Day(s) | 60 ~ 160 | 11 | General Steel[○] / Cast Iron[○] / Aluminum[○] / Copper[○] | None | - | 12 | 22 | 80 | 15 | ||
- | END MILL | 1 Piece(s) | 5 Day(s) | 60 ~ 160 | 12 | General Steel[○] / Cast Iron[○] / Aluminum[○] / Copper[○] | None | - | 12 | 22 | 80 | - | ||
- | END MILL | 1 Piece(s) | 5 Day(s) | 60 ~ 160 | 13 | General Steel[○] / Cast Iron[○] / Aluminum[○] / Copper[○] | None | - | 12 | 26 | 85 | - | ||
- | END MILL | 1 Piece(s) | 5 Day(s) | 60 ~ 160 | 14 | General Steel[○] / Cast Iron[○] / Aluminum[○] / Copper[○] | None | - | 16 | 26 | 90 | 15 | ||
- | END MILL | 1 Piece(s) | 5 Day(s) | 60 ~ 160 | 15 | General Steel[○] / Cast Iron[○] / Aluminum[○] / Copper[○] | None | - | 16 | 30 | 95 | 15 | ||
- | END MILL | 1 Piece(s) | 5 Day(s) | 60 ~ 160 | 16 | General Steel[○] / Cast Iron[○] / Aluminum[○] / Copper[○] | None | - | 16 | 30 | 95 | - | ||
- | END MILL | 1 Piece(s) | 5 Day(s) | 60 ~ 160 | 18 | General Steel[○] / Cast Iron[○] / Aluminum[○] / Copper[○] | None | - | 16 | 34 | 95 | - | ||
- | END MILL | 1 Piece(s) | 5 Day(s) | 60 ~ 160 | 20 | General Steel[○] / Cast Iron[○] / Aluminum[○] / Copper[○] | None | - | 20 | 38 | 110 | - | ||
- | END MILL | 1 Piece(s) | 5 Day(s) | 60 ~ 160 | 22 | General Steel[○] / Cast Iron[○] / Aluminum[○] / Copper[○] | None | - | 20 | 45 | 110 | - | ||
- | END MILL | 1 Piece(s) | 5 Day(s) | 60 ~ 160 | 25 | General Steel[○] / Cast Iron[○] / Aluminum[○] / Copper[○] | None | - | 25 | 50 | 120 | - | ||
- | END MILL | 1 Piece(s) | 11 Day(s) | 60 ~ 160 | 10 | General Steel[○] / Heat-Treated Steel[○] / Cast Iron[○] / Aluminum[○] / Copper[○] | Included | TiCN | 10 | 18 | 70 | - | ||
- | END MILL | 1 Piece(s) | 11 Day(s) | 60 ~ 160 | 11 | General Steel[○] / Heat-Treated Steel[○] / Cast Iron[○] / Aluminum[○] / Copper[○] | Included | TiCN | 12 | 22 | 80 | 15 | ||
- | END MILL | 1 Piece(s) | 11 Day(s) | 60 ~ 160 | 12 | General Steel[○] / Heat-Treated Steel[○] / Cast Iron[○] / Aluminum[○] / Copper[○] | Included | TiCN | 12 | 22 | 80 | - | ||
- | END MILL | 1 Piece(s) | 11 Day(s) | 60 ~ 160 | 13 | General Steel[○] / Heat-Treated Steel[○] / Cast Iron[○] / Aluminum[○] / Copper[○] | Included | TiCN | 12 | 26 | 85 | - | ||
- | END MILL | 1 Piece(s) | 11 Day(s) | 60 ~ 160 | 14 | General Steel[○] / Heat-Treated Steel[○] / Cast Iron[○] / Aluminum[○] / Copper[○] | Included | TiCN | 16 | 26 | 90 | 15 | ||
- | END MILL | 1 Piece(s) | 11 Day(s) | 60 ~ 160 | 15 | General Steel[○] / Heat-Treated Steel[○] / Cast Iron[○] / Aluminum[○] / Copper[○] | Included | TiCN | 16 | 30 | 95 | 15 | ||
- | END MILL | 1 Piece(s) | 11 Day(s) | 60 ~ 160 | 16 | General Steel[○] / Heat-Treated Steel[○] / Cast Iron[○] / Aluminum[○] / Copper[○] | Included | TiCN | 16 | 30 | 95 | - | ||
- | END MILL | 1 Piece(s) | 11 Day(s) | 60 ~ 160 | 18 | General Steel[○] / Heat-Treated Steel[○] / Cast Iron[○] / Aluminum[○] / Copper[○] | Included | TiCN | 16 | 34 | 95 | - | ||
- | END MILL | 1 Piece(s) | 11 Day(s) | 60 ~ 160 | 20 | General Steel[○] / Heat-Treated Steel[○] / Cast Iron[○] / Aluminum[○] / Copper[○] | Included | TiCN | 20 | 38 | 110 | - | ||
- | END MILL | 1 Piece(s) | 11 Day(s) | 60 ~ 160 | 22 | General Steel[○] / Heat-Treated Steel[○] / Cast Iron[○] / Aluminum[○] / Copper[○] | Included | TiCN | 20 | 45 | 110 | - | ||
- | END MILL | 1 Piece(s) | 11 Day(s) | 60 ~ 160 | 25 | General Steel[○] / Heat-Treated Steel[○] / Cast Iron[○] / Aluminum[○] / Copper[○] | Included | TiCN | 25 | 50 | 120 | - |
Loading...
Model Number | Beveling Angle θ1 1° Increment Designation |
Flute Length ℓ |
Under Neck Angle θ2 |
Overall Length L |
Shank Diameter d |
|
Outer Diameter D |
||||||
MEM2S (Non-Coated Type) V-MEM2S (TiCN Coating Type) |
10 | 60° ~ 160° | 18 | — | 70 | 10 |
11 | 60° ~ 160° | 22 | 15° | 80 | 12 | |
12 | 60° ~ 160° | 22 | — | 80 | 12 | |
13 | 60° ~ 160° | 26 | — | 85 | 12 | |
14 | 60° ~ 160° | 26 | 15° | 90 | 16 | |
15 | 60° ~ 160° | 30 | 15° | 95 | 16 | |
16 | 60° ~ 160° | 30 | — | 95 | 16 | |
18 | 60° ~ 160° | 34 | — | 95 | 16 | |
20 | 60° ~ 160° | 38 | — | 110 | 20 | |
22 | 60° ~ 160° | 45 | — | 110 | 20 | |
25 | 60° ~ 160° | 50 | — | 120 | 25 |
[ ! ]Since additional processing is given to EM2S, the flute length (ℓ) and total length (L) are somewhat shorter than the indicated dimensions.
Use | Centering (Positioning) / Hole Chamfer / Chamfering / Horizontal | Single Blade / Double Blade | Single Blade | Peripheral Blade Availability | Included |
---|---|---|---|---|---|
Tool Material Type | Cobalt High-Speed Steel | Diameter Tolerance | 0 ~ -0.03 | Tolerance of Shank Diameter | h7 |
How can we improve?
How can we improve?