(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
300 V cable, ULAWM2464 standard compliant. Excellent noise prevention effect is achieved by using a double shield consisting of aluminum foil tape and braided shield.
Model Number | Number of Pairs 1P = 2 Cores | Total Length or Specified Length | Sample Provided |
NA28WSB | 1P | 1 ~ 100 (Specify 1 m Increment) | ◎ |
2P | ◎ | ||
3P | ◎ | ||
5P | ◎ | ||
8P | ◎ | ||
13P | ◎ | ||
20P | ◎ |
Sheath Color | Navy |
Operating Temperature Range | - 10 ~ 80°C |
Standard Acquired | ULAWM2464 |
Bending Radius | Finished Outer Diameter x 8 (Fixed Part Only) |
Model Number | AWG Size | Number of Pairs 1P = 2 Cores | Specified Length (m) | Conductor | Insulation Thickness (mm) | Twisted Pair Outer Diameter (mm) | Shield Part (Tape) Thickness (mm) | Shield Part (Braid) Thickness (mm) | Shield Part (Braid) Density (%) | Sheath Thickness (mm) | Finished Outer Diameter (mm) | Electrical Properties | Approximate Mass kg/km | ||||
Structure Strands / mm | Outer Diameter Approx. (mm) | Conductor Resistance (20 °C) | Insulation Properties MΩkm (20°C) | Test Voltage V / Min | Allowable Current A (30 °C) | ||||||||||||
NA28WSB | 28 * (0.08 mm2) | 1P | 1 ~ 100 m (Specify 1 m Increment) | 7/0.127 (Tin Plating) | 0.38 | 0.33 | 2.1 | 0.05 | 0.3 | 80 | 0.81 | 4.5 | 229 or less | 10 or more | 1500 AC | 4.0 | 30 |
2P | 6 | 3.3 | 40 | ||||||||||||||
3P | 6.3 | 2.8 | 50 | ||||||||||||||
5P | 7.5 | 2.3 | 70 | ||||||||||||||
8P | 8.3 | 1.9 | 80 | ||||||||||||||
13P | 9.9 | 1.6 | 100 | ||||||||||||||
20P | 11.7 | 1.4 | 160 |
Conductor | Tin Plated Annealed Copper Stranded Wire |
Insulator | Heat Resistant Vinyl |
Twisting | Twisted Pair |
Shield | Aluminum Foil Tape + Braided Shield |
Sheath | Heat-Resistant Vinyl Sheath / Matte |
Ambient Temperature (°C) | 30 or less | 40 | 50 | 60 | 70 |
Current Reduction Factor | 1.00 | 0.89 | 0.77 | 0.63 | 0.45 |
Pair No. | Insulator Color | Dot Mark | Dot Mark Color | Pair No. | Insulator Color | Dot Mark | Dot Mark Color | ||
Core of Wire 1 | Core of Wire 2 | Core of Wire 1 | Core of Wire 2 | ||||||
1 | Orange | ■ | Black | Red | 11 | Orange | ■■■ | Black | Red |
2 | Gray | ■ | Black | Red | 12 | Gray | ■■■ | Black | Red |
3 | White | ■ | Black | Red | 13 | White | ■■■ | Black | Red |
4 | Yellow | ■ | Black | Red | 14 | Yellow | ■■■ | Black | Red |
5 | Pink | ■ | Black | Red | 15 | Pink | ■■■ | Black | Red |
6 | Orange | ■■ | Black | Red | 16 | Orange | ■■■■ | Black | Red |
7 | Gray | ■■ | Black | Red | 17 | Gray | ■■■■ | Black | Red |
8 | White | ■■ | Black | Red | 18 | White | ■■■■ | Black | Red |
9 | Yellow | ■■ | Black | Red | 19 | Yellow | ■■■■ | Black | Red |
10 | Pink | ■■ | Black | Red | 20 | Pink | ■■■■ | Black | Red |
Part Number | Price | Name | Minimum Order Qty. | Volume Discount | Days to Ship | Overall Length (m) | Logarithm | Finished outer diameter (mm) |
---|---|---|---|---|---|---|---|---|
฿ 5,834.56 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 91 | 1P | 4.5 | ||
฿ 5,897.68 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 92 | 1P | 4.5 | ||
฿ 5,960.80 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 93 | 1P | 4.5 | ||
฿ 6,023.92 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 94 | 1P | 4.5 | ||
฿ 6,087.04 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 95 | 1P | 4.5 | ||
฿ 6,150.16 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 96 | 1P | 4.5 | ||
฿ 6,213.28 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 97 | 1P | 4.5 | ||
฿ 6,276.40 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 98 | 1P | 4.5 | ||
฿ 6,339.53 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 99 | 1P | 4.5 | ||
฿ 6,710.67 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 100 | 1P | 4.5 | ||
฿ 181.56 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 1 | 2P | 6 | ||
฿ 272.57 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 2 | 2P | 6 | ||
฿ 363.58 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 3 | 2P | 6 | ||
฿ 454.60 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 4 | 2P | 6 | ||
฿ 545.61 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 5 | 2P | 6 | ||
฿ 636.62 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 6 | 2P | 6 | ||
฿ 727.63 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 7 | 2P | 6 | ||
฿ 818.64 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 8 | 2P | 6 | ||
฿ 909.66 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 9 | 2P | 6 | ||
฿ 1,000.67 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 10 | 2P | 6 | ||
฿ 1,091.68 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 11 | 2P | 6 | ||
฿ 1,182.69 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 12 | 2P | 6 | ||
฿ 1,273.70 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 13 | 2P | 6 | ||
฿ 1,364.72 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 14 | 2P | 6 | ||
฿ 1,455.73 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 15 | 2P | 6 | ||
฿ 1,546.74 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 16 | 2P | 6 | ||
฿ 1,637.75 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 17 | 2P | 6 | ||
฿ 1,728.76 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 18 | 2P | 6 | ||
฿ 1,819.78 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 19 | 2P | 6 | ||
฿ 1,910.79 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 20 | 2P | 6 | ||
฿ 2,001.80 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 21 | 2P | 6 | ||
฿ 2,092.81 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 22 | 2P | 6 | ||
฿ 2,183.82 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 23 | 2P | 6 | ||
฿ 2,274.84 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 24 | 2P | 6 | ||
฿ 2,365.85 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 25 | 2P | 6 | ||
฿ 2,456.86 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 26 | 2P | 6 | ||
฿ 2,547.87 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 27 | 2P | 6 | ||
฿ 2,638.88 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 28 | 2P | 6 | ||
฿ 2,729.90 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 29 | 2P | 6 | ||
฿ 2,820.91 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 30 | 2P | 6 | ||
฿ 2,911.92 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 31 | 2P | 6 | ||
฿ 3,002.93 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 32 | 2P | 6 | ||
฿ 3,093.95 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 33 | 2P | 6 | ||
฿ 3,184.96 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 34 | 2P | 6 | ||
฿ 3,275.97 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 35 | 2P | 6 | ||
฿ 3,366.98 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 36 | 2P | 6 | ||
฿ 3,457.99 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 37 | 2P | 6 | ||
฿ 3,549.01 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 38 | 2P | 6 | ||
฿ 3,640.02 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 39 | 2P | 6 | ||
฿ 3,731.03 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 40 | 2P | 6 | ||
฿ 3,822.04 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 41 | 2P | 6 | ||
฿ 3,913.05 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 42 | 2P | 6 | ||
฿ 4,004.07 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 43 | 2P | 6 | ||
฿ 4,095.08 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 44 | 2P | 6 | ||
฿ 4,186.09 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 45 | 2P | 6 | ||
฿ 4,277.10 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 46 | 2P | 6 | ||
฿ 4,368.11 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 47 | 2P | 6 | ||
฿ 4,459.13 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 48 | 2P | 6 | ||
฿ 4,550.14 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 49 | 2P | 6 | ||
฿ 4,641.15 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 50 | 2P | 6 | ||
฿ 4,732.16 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 51 | 2P | 6 | ||
฿ 4,823.17 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 52 | 2P | 6 | ||
฿ 4,914.19 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 53 | 2P | 6 | ||
฿ 5,005.20 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 54 | 2P | 6 | ||
฿ 5,096.21 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 55 | 2P | 6 | ||
฿ 5,187.22 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 56 | 2P | 6 | ||
฿ 5,278.23 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 57 | 2P | 6 | ||
฿ 5,369.25 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 58 | 2P | 6 | ||
฿ 5,460.26 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 59 | 2P | 6 | ||
฿ 5,551.27 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 60 | 2P | 6 | ||
฿ 5,642.28 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 61 | 2P | 6 | ||
฿ 5,733.29 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 62 | 2P | 6 | ||
฿ 5,824.31 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 63 | 2P | 6 | ||
฿ 5,915.32 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 64 | 2P | 6 | ||
฿ 6,006.33 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 65 | 2P | 6 | ||
฿ 6,097.34 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 66 | 2P | 6 | ||
฿ 6,188.36 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 67 | 2P | 6 | ||
฿ 6,279.37 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 68 | 2P | 6 | ||
฿ 6,370.38 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 69 | 2P | 6 | ||
฿ 6,461.39 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 70 | 2P | 6 | ||
฿ 6,552.40 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 71 | 2P | 6 | ||
฿ 6,643.42 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 72 | 2P | 6 | ||
฿ 6,734.43 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 73 | 2P | 6 | ||
฿ 6,825.44 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 74 | 2P | 6 | ||
฿ 6,916.45 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 75 | 2P | 6 | ||
฿ 7,007.46 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 76 | 2P | 6 | ||
฿ 7,098.48 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 77 | 2P | 6 | ||
฿ 7,189.49 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 78 | 2P | 6 | ||
฿ 7,280.50 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 79 | 2P | 6 | ||
฿ 7,371.51 | CABLE ASSEMBLY | 1 Piece(s) | 3 Day(s) | 80 | 2P | 6 |
Loading...
Conductor Cross Section(mm2) | 0.08 | AWG size(AWG) | 28 | Rated Voltage | 300V |
---|---|---|---|---|---|
Shield | Present | Representative Standard | UL | Sheath (outer coating) color | Navy color |
Sheath (outer coating) material | PVC | Insulation body materials | PVC | Power supply/signal | Dual use |
Other properties | Noise Resistance |
How can we improve?
How can we improve?