(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
This is a circular rubber/sponge gasket.
Type | [ M ]Material | [ H ]Hardness | Color |
FRN | Nitrile Rubber (NBR) | Shore A70 | Black |
FRC | Chloroprene Rubber (CR) | Shore A65 | Black |
FRCAN | Amber Color Rubber | Shore A45 | Amber Color |
FRSM | Silicon Rubber | Shore A70 | Light Gray |
FRAM | Silicon Rubber | Shore A50 | Milky White |
FRFF | Fluororubber (FPM) | Shore A80 | Black |
FSNC | Chloroprene Rubber Sponge | Asker C25 | Black |
FSNF | Fluororubber Sponge | Asker C35 | Black |
FSNA | Silicon Rubber Sponge | Asker C35 | Orange |
FREP | Ethylene Rubber (EPDM Synthetic Rubber) | Shore A65 | Black |
Part Number | - | A | - | V | - | Q | - | N | ||||
Type | Shape | T | ||||||||||
FRN | 4A | 3 | - | A300 | - | V100 | - | Q250 | - | N11 |
Part Number | 1mm Increment (A≥B≥T) | V | Q | 0.5mm Increment | ||||
Type | Shape | T | A | N | ||||
Rubber | Sponge | |||||||
FRN FRC FRFF FRSM FRAM FRCAN FSNC FSNF FSNA FREP | (Nitrile Rubber) (Chloroprene Rubber) (Fluororubber) (Silicon A70) (Silicon A50) (Amber Color Rubber) (Chloroprene Rubber Sponge) (Fluororubber Sponge) (Silicon Rubber Sponge) (Ethylene Rubber EPDM Synthetic Rubber A65) | A 1A 4A 8A | 1 2 3 5 10 15 20 30 | 3 5 10 | 25~500 (When T=30, A≥30) | 0.5mm Increment | 3~30 |
Part Number |
---|
FSNC4A5-A[25-500/1]-V[3-484/0.5]-Q[11-492/0.5]-N[3-30/0.5] |
FSNC4A10-A[25-500/1]-V0-Q[11-492/0.5]-N[3-30/0.5] |
FSNC4A10-A[25-500/1]-V[3-484/0.5]-Q[11-492/0.5]-N[3-30/0.5] |
FSNC8A3-A[25-500/1]-V0-Q[11-492/0.5]-N[3-30/0.5] |
FSNC8A3-A[25-500/1]-V[11-489/0.5]-Q[11-492/0.5]-N[3-30/0.5] |
FSNC8A5-A[25-500/1]-V0-Q[11-492/0.5]-N[3-30/0.5] |
FSNC8A5-A[25-500/1]-V[3-484/0.5]-Q[11-492/0.5]-N[3-30/0.5] |
FSNC8A10-A[25-500/1]-V0-Q[11-492/0.5]-N[3-30/0.5] |
FSNC8A10-A[25-500/1]-V[3-484/0.5]-Q[11-492/0.5]-N[3-30/0.5] |
FSNCA3-A[25-500/1] |
FSNCA5-A[25-500/1] |
FSNCA10-A[25-500/1] |
FSNF1A3-A[25-500/1]-V[3-496/0.5] |
FSNF1A5-A[25-500/1]-V[3-496/0.5] |
FSNF1A10-A[25-500/1]-V[3-496/0.5] |
FSNF4A3-A[25-500/1]-V0-Q[11-492/0.5]-N[3-30/0.5] |
FSNF4A3-A[25-500/1]-V[3-484/0.5]-Q[11-492/0.5]-N[3-30/0.5] |
FSNF4A5-A[25-500/1]-V0-Q[11-492/0.5]-N[3-30/0.5] |
FSNF4A5-A[25-500/1]-V[3-484/0.5]-Q[11-492/0.5]-N[3-30/0.5] |
FSNF4A10-A[25-500/1]-V0-Q[11-492/0.5]-N[3-30/0.5] |
FSNF4A10-A[25-500/1]-V[3-484/0.5]-Q[11-492/0.5]-N[3-30/0.5] |
FSNF8A3-A[25-500/1]-V0-Q[11-492/0.5]-N[3-30/0.5] |
FSNF8A3-A[25-500/1]-V[11-489/0.5]-Q[11-492/0.5]-N[3-30/0.5] |
FSNF8A5-A[25-500/1]-V0-Q[11-492/0.5]-N[3-30/0.5] |
FSNF8A5-A[25-500/1]-V[3-484/0.5]-Q[11-492/0.5]-N[3-30/0.5] |
FSNF8A10-A[25-500/1]-V0-Q[11-492/0.5]-N[3-30/0.5] |
FSNF8A10-A[25-500/1]-V[3-484/0.5]-Q[11-492/0.5]-N[3-30/0.5] |
FSNFA3-A[25-500/1] |
FSNFA5-A[25-500/1] |
FSNFA10-A[25-500/1] |
Part Number | Price | Name | Minimum Order Qty. | Volume Discount | Days to Ship | RoHS | Grade, Type | Width A (mm) | Thickness T (mm) | Material | Hardness (Shore, Asker, Penetration) | Specifications | N (mm) | Q (mm) | V (mm) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
- | CHLOROPRENE RUBBER SPONGE | 1 Piece(s) | 5 Day(s) | 10 | [Chloroprene (CR)] Chloroprene Rubber Sponge | 25 ~ 500 | 5 | Sponge | Asker C25 | 4A (Round Shape, Round Center Hole + 4 Through Holes) | 3 ~ 30 | 11 ~ 492 | 3 ~ 484 | ||
- | CHLOROPRENE RUBBER SPONGE | 1 Piece(s) | 5 Day(s) | 10 | [Chloroprene (CR)] Chloroprene Rubber Sponge | 25 ~ 500 | 10 | Sponge | Asker C25 | 4A (Round Shape, Round Center Hole + 4 Through Holes) | 3 ~ 30 | 11 ~ 492 | 0 | ||
- | CHLOROPRENE RUBBER SPONGE | 1 Piece(s) | 5 Day(s) | 10 | [Chloroprene (CR)] Chloroprene Rubber Sponge | 25 ~ 500 | 10 | Sponge | Asker C25 | 4A (Round Shape, Round Center Hole + 4 Through Holes) | 3 ~ 30 | 11 ~ 492 | 3 ~ 484 | ||
- | CHLOROPRENE RUBBER SPONGE | 1 Piece(s) | 5 Day(s) | 10 | [Chloroprene (CR)] Chloroprene Rubber Sponge | 25 ~ 500 | 3 | Sponge | Asker C25 | 8A (Round Shape, Round Center Hole + 8 Through Holes) | 3 ~ 30 | 11 ~ 492 | 0 | ||
- | CHLOROPRENE RUBBER SPONGE | 1 Piece(s) | 5 Day(s) | 10 | [Chloroprene (CR)] Chloroprene Rubber Sponge | 25 ~ 500 | 3 | Sponge | Asker C25 | 8A (Round Shape, Round Center Hole + 8 Through Holes) | 3 ~ 30 | 11 ~ 492 | 11 ~ 489 | ||
- | CHLOROPRENE RUBBER SPONGE | 1 Piece(s) | 5 Day(s) | 10 | [Chloroprene (CR)] Chloroprene Rubber Sponge | 25 ~ 500 | 5 | Sponge | Asker C25 | 8A (Round Shape, Round Center Hole + 8 Through Holes) | 3 ~ 30 | 11 ~ 492 | 0 | ||
- | CHLOROPRENE RUBBER SPONGE | 1 Piece(s) | 5 Day(s) | 10 | [Chloroprene (CR)] Chloroprene Rubber Sponge | 25 ~ 500 | 5 | Sponge | Asker C25 | 8A (Round Shape, Round Center Hole + 8 Through Holes) | 3 ~ 30 | 11 ~ 492 | 3 ~ 484 | ||
- | CHLOROPRENE RUBBER SPONGE | 1 Piece(s) | 5 Day(s) | 10 | [Chloroprene (CR)] Chloroprene Rubber Sponge | 25 ~ 500 | 10 | Sponge | Asker C25 | 8A (Round Shape, Round Center Hole + 8 Through Holes) | 3 ~ 30 | 11 ~ 492 | 0 | ||
- | CHLOROPRENE RUBBER SPONGE | 1 Piece(s) | 5 Day(s) | 10 | [Chloroprene (CR)] Chloroprene Rubber Sponge | 25 ~ 500 | 10 | Sponge | Asker C25 | 8A (Round Shape, Round Center Hole + 8 Through Holes) | 3 ~ 30 | 11 ~ 492 | 3 ~ 484 | ||
- | CHLOROPRENE RUBBER SPONGE | 1 Piece(s) | 5 Day(s) | 10 | [Chloroprene (CR)] Chloroprene Rubber Sponge | 25 ~ 500 | 3 | Sponge | Asker C25 | A (Round Shape) | - | - | - | ||
- | CHLOROPRENE RUBBER SPONGE | 1 Piece(s) | 5 Day(s) | 10 | [Chloroprene (CR)] Chloroprene Rubber Sponge | 25 ~ 500 | 5 | Sponge | Asker C25 | A (Round Shape) | - | - | - | ||
- | CHLOROPRENE RUBBER SPONGE | 1 Piece(s) | 5 Day(s) | 10 | [Chloroprene (CR)] Chloroprene Rubber Sponge | 25 ~ 500 | 10 | Sponge | Asker C25 | A (Round Shape) | - | - | - | ||
- | FLUORO RUBBER SPONGE | 1 Piece(s) | 5 Day(s) | 10 | [Fluorine (FPM)] Fluororubber Sponge | 25 ~ 500 | 3 | Sponge | Asker C35 | 1A (Round Shape, Round Center Hole) | - | - | 3 ~ 496 | ||
- | FLUORO RUBBER SPONGE | 1 Piece(s) | 5 Day(s) | 10 | [Fluorine (FPM)] Fluororubber Sponge | 25 ~ 500 | 5 | Sponge | Asker C35 | 1A (Round Shape, Round Center Hole) | - | - | 3 ~ 496 | ||
- | FLUORO RUBBER SPONGE | 1 Piece(s) | 5 Day(s) | 10 | [Fluorine (FPM)] Fluororubber Sponge | 25 ~ 500 | 10 | Sponge | Asker C35 | 1A (Round Shape, Round Center Hole) | - | - | 3 ~ 496 | ||
- | FLUORO RUBBER SPONGE | 1 Piece(s) | 5 Day(s) | 10 | [Fluorine (FPM)] Fluororubber Sponge | 25 ~ 500 | 3 | Sponge | Asker C35 | 4A (Round Shape, Round Center Hole + 4 Through Holes) | 3 ~ 30 | 11 ~ 492 | 0 | ||
- | FLUORO RUBBER SPONGE | 1 Piece(s) | 5 Day(s) | 10 | [Fluorine (FPM)] Fluororubber Sponge | 25 ~ 500 | 3 | Sponge | Asker C35 | 4A (Round Shape, Round Center Hole + 4 Through Holes) | 3 ~ 30 | 11 ~ 492 | 3 ~ 484 | ||
- | FLUORO RUBBER SPONGE | 1 Piece(s) | 5 Day(s) | 10 | [Fluorine (FPM)] Fluororubber Sponge | 25 ~ 500 | 5 | Sponge | Asker C35 | 4A (Round Shape, Round Center Hole + 4 Through Holes) | 3 ~ 30 | 11 ~ 492 | 0 | ||
- | FLUORO RUBBER SPONGE | 1 Piece(s) | 5 Day(s) | 10 | [Fluorine (FPM)] Fluororubber Sponge | 25 ~ 500 | 5 | Sponge | Asker C35 | 4A (Round Shape, Round Center Hole + 4 Through Holes) | 3 ~ 30 | 11 ~ 492 | 3 ~ 484 | ||
- | FLUORO RUBBER SPONGE | 1 Piece(s) | 5 Day(s) | 10 | [Fluorine (FPM)] Fluororubber Sponge | 25 ~ 500 | 10 | Sponge | Asker C35 | 4A (Round Shape, Round Center Hole + 4 Through Holes) | 3 ~ 30 | 11 ~ 492 | 0 | ||
- | FLUORO RUBBER SPONGE | 1 Piece(s) | 5 Day(s) | 10 | [Fluorine (FPM)] Fluororubber Sponge | 25 ~ 500 | 10 | Sponge | Asker C35 | 4A (Round Shape, Round Center Hole + 4 Through Holes) | 3 ~ 30 | 11 ~ 492 | 3 ~ 484 | ||
- | FLUORO RUBBER SPONGE | 1 Piece(s) | 5 Day(s) | 10 | [Fluorine (FPM)] Fluororubber Sponge | 25 ~ 500 | 3 | Sponge | Asker C35 | 8A (Round Shape, Round Center Hole + 8 Through Holes) | 3 ~ 30 | 11 ~ 492 | 0 | ||
- | FLUORO RUBBER SPONGE | 1 Piece(s) | 5 Day(s) | 10 | [Fluorine (FPM)] Fluororubber Sponge | 25 ~ 500 | 3 | Sponge | Asker C35 | 8A (Round Shape, Round Center Hole + 8 Through Holes) | 3 ~ 30 | 11 ~ 492 | 11 ~ 489 | ||
- | FLUORO RUBBER SPONGE | 1 Piece(s) | 5 Day(s) | 10 | [Fluorine (FPM)] Fluororubber Sponge | 25 ~ 500 | 5 | Sponge | Asker C35 | 8A (Round Shape, Round Center Hole + 8 Through Holes) | 3 ~ 30 | 11 ~ 492 | 0 | ||
- | FLUORO RUBBER SPONGE | 1 Piece(s) | 5 Day(s) | 10 | [Fluorine (FPM)] Fluororubber Sponge | 25 ~ 500 | 5 | Sponge | Asker C35 | 8A (Round Shape, Round Center Hole + 8 Through Holes) | 3 ~ 30 | 11 ~ 492 | 3 ~ 484 | ||
- | FLUORO RUBBER SPONGE | 1 Piece(s) | 5 Day(s) | 10 | [Fluorine (FPM)] Fluororubber Sponge | 25 ~ 500 | 10 | Sponge | Asker C35 | 8A (Round Shape, Round Center Hole + 8 Through Holes) | 3 ~ 30 | 11 ~ 492 | 0 | ||
- | FLUORO RUBBER SPONGE | 1 Piece(s) | 5 Day(s) | 10 | [Fluorine (FPM)] Fluororubber Sponge | 25 ~ 500 | 10 | Sponge | Asker C35 | 8A (Round Shape, Round Center Hole + 8 Through Holes) | 3 ~ 30 | 11 ~ 492 | 3 ~ 484 | ||
- | FLUORO RUBBER SPONGE | 1 Piece(s) | 5 Day(s) | 10 | [Fluorine (FPM)] Fluororubber Sponge | 25 ~ 500 | 3 | Sponge | Asker C35 | A (Round Shape) | - | - | - | ||
- | FLUORO RUBBER SPONGE | 1 Piece(s) | 5 Day(s) | 10 | [Fluorine (FPM)] Fluororubber Sponge | 25 ~ 500 | 5 | Sponge | Asker C35 | A (Round Shape) | - | - | - | ||
- | FLUORO RUBBER SPONGE | 1 Piece(s) | 5 Day(s) | 10 | [Fluorine (FPM)] Fluororubber Sponge | 25 ~ 500 | 10 | Sponge | Asker C35 | A (Round Shape) | - | - | - |
Loading...
With or Without Adhesive | Without Adhesive | Hole Machining | No Drilling Alteration |
---|
How can we improve?
How can we improve?