(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
pipe roller whose length can be specified. Since the shaft is already joined, the number of parts can be reduced.
The length of the roller part can be specified in 10mm increments from 100 to 800.
[Type] Metal roller
[Roller shape] Straight
[Diameter] Selectable from 50, 60, 80
[Shaft end] Straight, female thread at both ends, retaining ring groove at both ends Attached
[Roller end specifications] Already joined to the shaft
[Material] Steel
[Surface treatment] Electroless nickel plating
Part Number |
---|
ROLJ50-15-[100-800/10]-E[5-45/1]-F[5-45/1] |
ROLJ50-20-[100-800/10]-E[5-60/1]-F[5-60/1] |
ROLJ50-25-[100-800/10]-E[5-75/1]-F[5-75/1] |
ROLJ60-20-[100-800/10]-E[5-60/1]-F[5-60/1] |
ROLJ60-25-[100-800/10]-E[5-75/1]-F[5-75/1] |
ROLJ60-30-[100-800/10]-E[5-90/1]-F[5-90/1] |
ROLJ80-25-[100-800/10]-E[5-75/1]-F[5-75/1] |
ROLJ80-30-[100-800/10]-E[5-90/1]-F[5-90/1] |
ROLJ80-35-[100-800/10]-E[5-100/1]-F[5-100/1] |
ROLJM50-15-[100-800/10]-E[5-45/1]-F[5-45/1]-M[5,6]-N[5,6] |
ROLJM50-20-[100-800/10]-E[5-60/1]-F[5-60/1]-M[5,6,8,10,12]-N[5,6,8,10,12] |
ROLJM50-25-[100-800/10]-E[5-75/1]-F[5-75/1]-M[5,6,8,10,12,16]-N[5,6,8,10,12,16] |
ROLJM60-20-[100-800/10]-E[5-60/1]-F[5-60/1]-M[5,6,8,10,12]-N[5,6,8,10,12] |
ROLJM60-25-[100-800/10]-E[5-75/1]-F[5-75/1]-M[5,6,8,10,12,16]-N[5,6,8,10,12,16] |
ROLJM60-30-[100-800/10]-E[5-90/1]-F[5-90/1]-M[8,10,12,16,20]-N[8,10,12,16,20] |
ROLJM80-25-[100-800/10]-E[5-75/1]-F[5-75/1]-M[5,6,8,10,12,16]-N[5,6,8,10,12,16] |
ROLJM80-30-[100-800/10]-E[5-90/1]-F[5-90/1]-M[8,10,12,16,20]-N[8,10,12,16,20] |
ROLJM80-35-[100-800/10]-E[5-100/1]-F[5-100/1]-M[8,10,12,16,20,24]-N[8,10,12,16,20,24] |
ROLJT50-15-[100-800/10]-E[5-45/1]-F[5-45/1]-P[5-39/1]-S[5-39/1] |
ROLJT50-20-[100-800/10]-E[5-60/1]-F[5-60/1]-P[5-54/1]-S[5-54/1] |
ROLJT50-25-[100-800/10]-E[5-75/1]-F[5-75/1]-P[5-69/1]-S[5-69/1] |
ROLJT60-20-[100-800/10]-E[5-60/1]-F[5-60/1]-P[5-54/1]-S[5-54/1] |
ROLJT60-25-[100-800/10]-E[5-75/1]-F[5-75/1]-P[5-69/1]-S[5-69/1] |
ROLJT60-30-[100-800/10]-E[5-90/1]-F[5-90/1]-P[5-84/1]-S[5-84/1] |
ROLJT80-25-[100-800/10]-E[5-75/1]-F[5-75/1]-P[5-69/1]-S[5-69/1] |
ROLJT80-30-[100-800/10]-E[5-90/1]-F[5-90/1]-P[5-84/1]-S[5-84/1] |
ROLJT80-35-[100-800/10]-E[5-100/1]-F[5-100/1]-P[5-94/1]-S[5-94/1] |
Part Number | Price | Name | Minimum Order Qty. | Volume Discount | Days to Ship | RoHS | Metal part outer diameter D (mm) | Shaft Outer Dia. d (mm) | E (mm) | F (mm) | L (mm) | M (mm) | N (mm) | P (mm) | S (mm) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
- | ROLLER | 1 Piece(s) | 10 Day(s) | 10 | 50 | 15 | 5 ~ 45 | 5 ~ 45 | 100 ~ 800 | - | - | - | - | ||
- | ROLLER | 1 Piece(s) | 10 Day(s) | 10 | 50 | 20 | 5 ~ 60 | 5 ~ 60 | 100 ~ 800 | - | - | - | - | ||
- | ROLLER | 1 Piece(s) | 10 Day(s) | 10 | 50 | 25 | 5 ~ 75 | 5 ~ 75 | 100 ~ 800 | - | - | - | - | ||
- | ROLLER | 1 Piece(s) | 10 Day(s) | 10 | 60 | 20 | 5 ~ 60 | 5 ~ 60 | 100 ~ 800 | - | - | - | - | ||
- | ROLLER | 1 Piece(s) | 10 Day(s) | 10 | 60 | 25 | 5 ~ 75 | 5 ~ 75 | 100 ~ 800 | - | - | - | - | ||
- | ROLLER | 1 Piece(s) | 10 Day(s) | 10 | 60 | 30 | 5 ~ 90 | 5 ~ 90 | 100 ~ 800 | - | - | - | - | ||
- | ROLLER | 1 Piece(s) | 10 Day(s) | 10 | 80 | 25 | 5 ~ 75 | 5 ~ 75 | 100 ~ 800 | - | - | - | - | ||
- | ROLLER | 1 Piece(s) | 10 Day(s) | 10 | 80 | 30 | 5 ~ 90 | 5 ~ 90 | 100 ~ 800 | - | - | - | - | ||
- | ROLLER | 1 Piece(s) | 10 Day(s) | 10 | 80 | 35 | 5 ~ 100 | 5 ~ 100 | 100 ~ 800 | - | - | - | - | ||
- | ROLLER | 1 Piece(s) | 10 Day(s) | 10 | 50 | 15 | 5 ~ 45 | 5 ~ 45 | 100 ~ 800 | 5 ~ 6 | 5 ~ 6 | - | - | ||
- | ROLLER | 1 Piece(s) | 10 Day(s) | 10 | 50 | 20 | 5 ~ 60 | 5 ~ 60 | 100 ~ 800 | 5 ~ 12 | 5 ~ 12 | - | - | ||
- | ROLLER | 1 Piece(s) | 10 Day(s) | 10 | 50 | 25 | 5 ~ 75 | 5 ~ 75 | 100 ~ 800 | 5 ~ 16 | 5 ~ 16 | - | - | ||
- | ROLLER | 1 Piece(s) | 10 Day(s) | 10 | 60 | 20 | 5 ~ 60 | 5 ~ 60 | 100 ~ 800 | 5 ~ 12 | 5 ~ 12 | - | - | ||
- | ROLLER | 1 Piece(s) | 10 Day(s) | 10 | 60 | 25 | 5 ~ 75 | 5 ~ 75 | 100 ~ 800 | 5 ~ 16 | 5 ~ 16 | - | - | ||
- | ROLLER | 1 Piece(s) | 10 Day(s) | 10 | 60 | 30 | 5 ~ 90 | 5 ~ 90 | 100 ~ 800 | 8 ~ 20 | 8 ~ 20 | - | - | ||
- | ROLLER | 1 Piece(s) | 10 Day(s) | 10 | 80 | 25 | 5 ~ 75 | 5 ~ 75 | 100 ~ 800 | 5 ~ 16 | 5 ~ 16 | - | - | ||
- | ROLLER | 1 Piece(s) | 10 Day(s) | 10 | 80 | 30 | 5 ~ 90 | 5 ~ 90 | 100 ~ 800 | 8 ~ 20 | 8 ~ 20 | - | - | ||
- | ROLLER | 1 Piece(s) | 10 Day(s) | 10 | 80 | 35 | 5 ~ 100 | 5 ~ 100 | 100 ~ 800 | 8 ~ 24 | 8 ~ 24 | - | - | ||
- | ROLLER | 1 Piece(s) | 10 Day(s) | 10 | 50 | 15 | 5 ~ 45 | 5 ~ 45 | 100 ~ 800 | - | - | 5 ~ 39 | 5 ~ 39 | ||
- | ROLLER | 1 Piece(s) | 10 Day(s) | 10 | 50 | 20 | 5 ~ 60 | 5 ~ 60 | 100 ~ 800 | - | - | 5 ~ 54 | 5 ~ 54 | ||
- | ROLLER | 1 Piece(s) | 10 Day(s) | 10 | 50 | 25 | 5 ~ 75 | 5 ~ 75 | 100 ~ 800 | - | - | 5 ~ 69 | 5 ~ 69 | ||
- | ROLLER | 1 Piece(s) | 10 Day(s) | 10 | 60 | 20 | 5 ~ 60 | 5 ~ 60 | 100 ~ 800 | - | - | 5 ~ 54 | 5 ~ 54 | ||
- | ROLLER | 1 Piece(s) | 10 Day(s) | 10 | 60 | 25 | 5 ~ 75 | 5 ~ 75 | 100 ~ 800 | - | - | 5 ~ 69 | 5 ~ 69 | ||
- | ROLLER | 1 Piece(s) | 10 Day(s) | 10 | 60 | 30 | 5 ~ 90 | 5 ~ 90 | 100 ~ 800 | - | - | 5 ~ 84 | 5 ~ 84 | ||
- | ROLLER | 1 Piece(s) | 10 Day(s) | 10 | 80 | 25 | 5 ~ 75 | 5 ~ 75 | 100 ~ 800 | - | - | 5 ~ 69 | 5 ~ 69 | ||
- | ROLLER | 1 Piece(s) | 10 Day(s) | 10 | 80 | 30 | 5 ~ 90 | 5 ~ 90 | 100 ~ 800 | - | - | 5 ~ 84 | 5 ~ 84 | ||
- | ROLLER | 1 Piece(s) | 10 Day(s) | 10 | 80 | 35 | 5 ~ 100 | 5 ~ 100 | 100 ~ 800 | - | - | 5 ~ 94 | 5 ~ 94 |
Loading...
Roller Type | Metal Roller | Mounting Method | Shaft | Roller Shape | Straight |
---|---|---|---|---|---|
Length(mm) | ~50 / ~100 / ~300 / ~500 / ~1000 | Surface Treatment | Electroless Nickel Plating |
How can we improve?
How can we improve?