(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
Irregularly shaped punches with TiCN coating, WPC® treatment, HW coating (TiCN coating + WPC® treatment), and RW coating (Al-Cr coating + WPC® treatment). The material can be selected from die steel (some high speed steel) and powder high speed steel.
Part Number |
---|
H-PJ9K20-LC[37-99.9/0.1]-P[6-20/0.01]-W[6-20/0.01]-A[1-19/0.01]-B[1-19.8/0.1]-R0-S[0.2-20/0.01] |
H-PJ9K20-LC[37-99.9/0.1]-P[6-20/0.01]-W[6-20/0.01]-A[1-19/0.01]-B[1-19.8/0.1]-R[0.2-40/0.01]-S[0.2-20/0.01] |
H-PJ9K25-[40-100/10]-P[6-25/0.01]-W[6-25/0.01]-A[1-24/0.01]-B[1-24.8/0.1]-R0-S[0.2-20/0.01] |
H-PJ9K25-[40-100/10]-P[6-25/0.01]-W[6-25/0.01]-A[1-24/0.01]-B[1-24.8/0.1]-R[0.2-40/0.01]-S[0.2-20/0.01] |
H-PJ9K25-LC[37-99.9/0.1]-P[6-25/0.01]-W[6-25/0.01]-A[1-24/0.01]-B[1-24.8/0.1]-R0-S[0.2-20/0.01] |
H-PJ9K25-LC[37-99.9/0.1]-P[6-25/0.01]-W[6-25/0.01]-A[1-24/0.01]-B[1-24.8/0.1]-R[0.2-40/0.01]-S[0.2-20/0.01] |
H-PJ10H5-[40-80/10]-P[2-4.9/0.01]-W[2-4.9/0.01]-R[1-24/0.01] |
H-PJ10H5-LC[37-79.9/0.1]-P[2-4.9/0.01]-W[2-4.9/0.01]-R[1-24/0.01] |
H-PJ10H6-[40-80/10]-P[2-5.9/0.01]-W[2-5.9/0.01]-R[2.9-24/0.01] |
H-PJ10H6-LC[37-79.9/0.1]-P[2-5.9/0.01]-W[2-5.9/0.01]-R[2.9-24/0.01] |
H-PJ10H8-[40-100/10]-P[3-7.9/0.01]-W[3-7.9/0.01]-R[3.9-24/0.01] |
H-PJ10H8-LC[37-99.9/0.1]-P[3-7.9/0.01]-W[3-7.9/0.01]-R[3.9-24/0.01] |
H-PJ10H10-[40-100/10]-P[3-9.9/0.01]-W[3-9.9/0.01]-R[4.9-24/0.01] |
H-PJ10H10-LC[37-99.9/0.1]-P[3-9.9/0.01]-W[3-9.9/0.01]-R[4.9-24/0.01] |
H-PJ10H13-[40-100/10]-P[6-12.9/0.01]-W[6-12.9/0.01]-R[6.4-24/0.01] |
H-PJ10H13-LC[37-99.9/0.1]-P[6-12.9/0.01]-W[6-12.9/0.01]-R[6.4-24/0.01] |
H-PJ10H16-[40-100/10]-P[6-15.9/0.01]-W[6-15.9/0.01]-R[7.9-24/0.01] |
H-PJ10H16-LC[37-99.9/0.1]-P[6-15.9/0.01]-W[6-15.9/0.01]-R[7.9-24/0.01] |
H-PJ10H20-[40-100/10]-P[6-19.9/0.01]-W[6-19.9/0.01]-R[9.9-24/0.01] |
H-PJ10H20-LC[37-99.9/0.1]-P[6-19.9/0.01]-W[6-19.9/0.01]-R[9.9-24/0.01] |
H-PJ10H25-[40-100/10]-P[6-24.9/0.01]-W[6-24.9/0.01]-R[12.4-24/0.01] |
H-PJ10H25-LC[37-99.9/0.1]-P[6-24.9/0.01]-W[6-24.9/0.01]-R[12.4-24/0.01] |
H-PJ11H5-[40-80/10]-P[2-4.9/0.01]-W[2-4.9/0.01]-R0-S0 |
H-PJ11H5-[40-80/10]-P[2-4.9/0.01]-W[2-4.9/0.01]-R0-S[0.2-20/0.01] |
H-PJ11H5-[40-80/10]-P[2-4.9/0.01]-W[2-4.9/0.01]-R[0.2-40/0.01]-S0 |
H-PJ11H5-[40-80/10]-P[2-4.9/0.01]-W[2-4.9/0.01]-R[0.2-40/0.01]-S[0.2-20/0.01] |
H-PJ11H5-LC[37-79.9/0.1]-P[2-4.9/0.01]-W[2-4.9/0.01]-R0-S0 |
H-PJ11H5-LC[37-79.9/0.1]-P[2-4.9/0.01]-W[2-4.9/0.01]-R0-S[0.2-20/0.01] |
H-PJ11H5-LC[37-79.9/0.1]-P[2-4.9/0.01]-W[2-4.9/0.01]-R[0.2-40/0.01]-S0 |
H-PJ11H5-LC[37-79.9/0.1]-P[2-4.9/0.01]-W[2-4.9/0.01]-R[0.2-40/0.01]-S[0.2-20/0.01] |
H-PJ11H6-[40-80/10]-P[2-5.9/0.01]-W[2-5.9/0.01]-R0-S0 |
H-PJ11H6-[40-80/10]-P[2-5.9/0.01]-W[2-5.9/0.01]-R0-S[0.2-20/0.01] |
H-PJ11H6-[40-80/10]-P[2-5.9/0.01]-W[2-5.9/0.01]-R[0.2-40/0.01]-S0 |
H-PJ11H6-[40-80/10]-P[2-5.9/0.01]-W[2-5.9/0.01]-R[0.2-40/0.01]-S[0.2-20/0.01] |
H-PJ11H6-LC[37-79.9/0.1]-P[2-5.9/0.01]-W[2-5.9/0.01]-R0-S0 |
H-PJ11H6-LC[37-79.9/0.1]-P[2-5.9/0.01]-W[2-5.9/0.01]-R0-S[0.2-20/0.01] |
H-PJ11H6-LC[37-79.9/0.1]-P[2-5.9/0.01]-W[2-5.9/0.01]-R[0.2-40/0.01]-S0 |
H-PJ11H6-LC[37-79.9/0.1]-P[2-5.9/0.01]-W[2-5.9/0.01]-R[0.2-40/0.01]-S[0.2-20/0.01] |
H-PJ11H8-[40-100/10]-P[3-7.9/0.01]-W[3-7.9/0.01]-R0-S0 |
H-PJ11H8-[40-100/10]-P[3-7.9/0.01]-W[3-7.9/0.01]-R0-S[0.2-20/0.01] |
H-PJ11H8-[40-100/10]-P[3-7.9/0.01]-W[3-7.9/0.01]-R[0.2-40/0.01]-S0 |
H-PJ11H8-[40-100/10]-P[3-7.9/0.01]-W[3-7.9/0.01]-R[0.2-40/0.01]-S[0.2-20/0.01] |
H-PJ11H8-LC[37-99.9/0.1]-P[3-7.9/0.01]-W[3-7.9/0.01]-R0-S0 |
H-PJ11H8-LC[37-99.9/0.1]-P[3-7.9/0.01]-W[3-7.9/0.01]-R0-S[0.2-20/0.01] |
H-PJ11H8-LC[37-99.9/0.1]-P[3-7.9/0.01]-W[3-7.9/0.01]-R[0.2-40/0.01]-S0 |
H-PJ11H8-LC[37-99.9/0.1]-P[3-7.9/0.01]-W[3-7.9/0.01]-R[0.2-40/0.01]-S[0.2-20/0.01] |
H-PJ11H10-[40-100/10]-P[3-9.9/0.01]-W[3-9.9/0.01]-R0-S0 |
H-PJ11H10-[40-100/10]-P[3-9.9/0.01]-W[3-9.9/0.01]-R0-S[0.2-20/0.01] |
H-PJ11H10-[40-100/10]-P[3-9.9/0.01]-W[3-9.9/0.01]-R[0.2-40/0.01]-S0 |
H-PJ11H10-[40-100/10]-P[3-9.9/0.01]-W[3-9.9/0.01]-R[0.2-40/0.01]-S[0.2-20/0.01] |
H-PJ11H10-LC[37-99.9/0.1]-P[3-9.9/0.01]-W[3-9.9/0.01]-R0-S0 |
H-PJ11H10-LC[37-99.9/0.1]-P[3-9.9/0.01]-W[3-9.9/0.01]-R0-S[0.2-20/0.01] |
H-PJ11H10-LC[37-99.9/0.1]-P[3-9.9/0.01]-W[3-9.9/0.01]-R[0.2-40/0.01]-S0 |
H-PJ11H10-LC[37-99.9/0.1]-P[3-9.9/0.01]-W[3-9.9/0.01]-R[0.2-40/0.01]-S[0.2-20/0.01] |
H-PJ11H13-[40-100/10]-P[6-12.9/0.01]-W[6-12.9/0.01]-R0-S0 |
H-PJ11H13-[40-100/10]-P[6-12.9/0.01]-W[6-12.9/0.01]-R0-S[0.2-20/0.01] |
H-PJ11H13-[40-100/10]-P[6-12.9/0.01]-W[6-12.9/0.01]-R[0.2-40/0.01]-S0 |
H-PJ11H13-[40-100/10]-P[6-12.9/0.01]-W[6-12.9/0.01]-R[0.2-40/0.01]-S[0.2-20/0.01] |
H-PJ11H13-LC[37-99.9/0.1]-P[6-12.9/0.01]-W[6-12.9/0.01]-R0-S0 |
H-PJ11H13-LC[37-99.9/0.1]-P[6-12.9/0.01]-W[6-12.9/0.01]-R0-S[0.2-20/0.01] |
H-PJ11H13-LC[37-99.9/0.1]-P[6-12.9/0.01]-W[6-12.9/0.01]-R[0.2-40/0.01]-S0 |
H-PJ11H13-LC[37-99.9/0.1]-P[6-12.9/0.01]-W[6-12.9/0.01]-R[0.2-40/0.01]-S[0.2-20/0.01] |
H-PJ11H16-[40-100/10]-P[6-15.9/0.01]-W[6-15.9/0.01]-R0-S0 |
H-PJ11H16-[40-100/10]-P[6-15.9/0.01]-W[6-15.9/0.01]-R0-S[0.2-20/0.01] |
H-PJ11H16-[40-100/10]-P[6-15.9/0.01]-W[6-15.9/0.01]-R[0.2-40/0.01]-S0 |
H-PJ11H16-[40-100/10]-P[6-15.9/0.01]-W[6-15.9/0.01]-R[0.2-40/0.01]-S[0.2-20/0.01] |
H-PJ11H16-LC[37-99.9/0.1]-P[6-15.9/0.01]-W[6-15.9/0.01]-R0-S0 |
H-PJ11H16-LC[37-99.9/0.1]-P[6-15.9/0.01]-W[6-15.9/0.01]-R0-S[0.2-20/0.01] |
H-PJ11H16-LC[37-99.9/0.1]-P[6-15.9/0.01]-W[6-15.9/0.01]-R[0.2-40/0.01]-S0 |
H-PJ11H16-LC[37-99.9/0.1]-P[6-15.9/0.01]-W[6-15.9/0.01]-R[0.2-40/0.01]-S[0.2-20/0.01] |
H-PJ11H20-[40-100/10]-P[6-19.9/0.01]-W[6-19.9/0.01]-R0-S0 |
H-PJ11H20-[40-100/10]-P[6-19.9/0.01]-W[6-19.9/0.01]-R0-S[0.2-20/0.01] |
H-PJ11H20-[40-100/10]-P[6-19.9/0.01]-W[6-19.9/0.01]-R[0.2-40/0.01]-S0 |
H-PJ11H20-[40-100/10]-P[6-19.9/0.01]-W[6-19.9/0.01]-R[0.2-40/0.01]-S[0.2-20/0.01] |
H-PJ11H20-LC[37-99.9/0.1]-P[6-19.9/0.01]-W[6-19.9/0.01]-R0-S0 |
H-PJ11H20-LC[37-99.9/0.1]-P[6-19.9/0.01]-W[6-19.9/0.01]-R0-S[0.2-20/0.01] |
H-PJ11H20-LC[37-99.9/0.1]-P[6-19.9/0.01]-W[6-19.9/0.01]-R[0.2-40/0.01]-S0 |
H-PJ11H20-LC[37-99.9/0.1]-P[6-19.9/0.01]-W[6-19.9/0.01]-R[0.2-40/0.01]-S[0.2-20/0.01] |
H-PJ11H25-[40-100/10]-P[6-24.9/0.01]-W[6-24.9/0.01]-R0-S0 |
H-PJ11H25-[40-100/10]-P[6-24.9/0.01]-W[6-24.9/0.01]-R0-S[0.2-20/0.01] |
H-PJ11H25-[40-100/10]-P[6-24.9/0.01]-W[6-24.9/0.01]-R[0.2-40/0.01]-S0 |
H-PJ11H25-[40-100/10]-P[6-24.9/0.01]-W[6-24.9/0.01]-R[0.2-40/0.01]-S[0.2-20/0.01] |
H-PJ11H25-LC[37-99.9/0.1]-P[6-24.9/0.01]-W[6-24.9/0.01]-R0-S0 |
H-PJ11H25-LC[37-99.9/0.1]-P[6-24.9/0.01]-W[6-24.9/0.01]-R0-S[0.2-20/0.01] |
H-PJ11H25-LC[37-99.9/0.1]-P[6-24.9/0.01]-W[6-24.9/0.01]-R[0.2-40/0.01]-S0 |
H-PJ11H25-LC[37-99.9/0.1]-P[6-24.9/0.01]-W[6-24.9/0.01]-R[0.2-40/0.01]-S[0.2-20/0.01] |
H-PJ11J5-[40-80/10]-P[2-4.9/0.01]-W[2-4.9/0.01]-A[1-4/0.01]-B[1-4.8/0.1] |
H-PJ11J5-LC[37-79.9/0.1]-P[2-4.9/0.01]-W[2-4.9/0.01]-A[1-4/0.01]-B[1-4.8/0.1] |
H-PJ11J6-[40-80/10]-P[2-5.9/0.01]-W[2-5.9/0.01]-A[1-5/0.01]-B[1-5.8/0.1] |
H-PJ11J6-LC[37-79.9/0.1]-P[2-5.9/0.01]-W[2-5.9/0.01]-A[1-5/0.01]-B[1-5.8/0.1] |
Part Number | Price | Name | Minimum Order Qty. | Volume Discount | Days to Ship | RoHS | Tip shape | Material | Surface treatment | Punch shank (mounting part) shape | D (Outer diameter) (mm) | A (mm) | B (mm) | C (mm) | L (L dimension) (mm) | LC (Full length alteration) (mm) | P (mm) | Q (mm) | R (mm) | S (mm) | W (mm) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
- | COATING PUNCH | 1 Piece(s) | 10 Day(s) | 10 | 9K | Powdered high-speed steel | TiCN | Standard | 20 | 1 ~ 19 | 1 ~ 19.8 | - | - | 37 ~ 99.9 | 6 ~ 20 | - | 0 | 0.2 ~ 20 | 6 ~ 20 | ||
- | COATING PUNCH | 1 Piece(s) | 10 Day(s) | 10 | 9K | Powdered high-speed steel | TiCN | Standard | 20 | 1 ~ 19 | 1 ~ 19.8 | - | - | 37 ~ 99.9 | 6 ~ 20 | - | 0.2 ~ 40 | 0.2 ~ 20 | 6 ~ 20 | ||
- | COATING PUNCH | 1 Piece(s) | 10 Day(s) | 10 | 9K | Powdered high-speed steel | TiCN | Standard | 25 | 1 ~ 24 | 1 ~ 24.8 | - | 40 ~ 100 | - | 6 ~ 25 | - | 0 | 0.2 ~ 20 | 6 ~ 25 | ||
- | COATING PUNCH | 1 Piece(s) | 10 Day(s) | 10 | 9K | Powdered high-speed steel | TiCN | Standard | 25 | 1 ~ 24 | 1 ~ 24.8 | - | 40 ~ 100 | - | 6 ~ 25 | - | 0.2 ~ 40 | 0.2 ~ 20 | 6 ~ 25 | ||
- | COATING PUNCH | 1 Piece(s) | 10 Day(s) | 10 | 9K | Powdered high-speed steel | TiCN | Standard | 25 | 1 ~ 24 | 1 ~ 24.8 | - | - | 37 ~ 99.9 | 6 ~ 25 | - | 0 | 0.2 ~ 20 | 6 ~ 25 | ||
- | COATING PUNCH | 1 Piece(s) | 10 Day(s) | 10 | 9K | Powdered high-speed steel | TiCN | Standard | 25 | 1 ~ 24 | 1 ~ 24.8 | - | - | 37 ~ 99.9 | 6 ~ 25 | - | 0.2 ~ 40 | 0.2 ~ 20 | 6 ~ 25 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 10H | Powdered high-speed steel | TiCN | Standard | 5 | - | - | - | 40 ~ 80 | - | 2 ~ 4.9 | - | 1 ~ 24 | - | 2 ~ 4.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 10H | Powdered high-speed steel | TiCN | Standard | 5 | - | - | - | - | 37 ~ 79.9 | 2 ~ 4.9 | - | 1 ~ 24 | - | 2 ~ 4.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 10H | Powdered high-speed steel | TiCN | Standard | 6 | - | - | - | 40 ~ 80 | - | 2 ~ 5.9 | - | 2.9 ~ 24 | - | 2 ~ 5.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 10H | Powdered high-speed steel | TiCN | Standard | 6 | - | - | - | - | 37 ~ 79.9 | 2 ~ 5.9 | - | 2.9 ~ 24 | - | 2 ~ 5.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 10H | Powdered high-speed steel | TiCN | Standard | 8 | - | - | - | 40 ~ 100 | - | 3 ~ 7.9 | - | 3.9 ~ 24 | - | 3 ~ 7.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 10H | Powdered high-speed steel | TiCN | Standard | 8 | - | - | - | - | 37 ~ 99.9 | 3 ~ 7.9 | - | 3.9 ~ 24 | - | 3 ~ 7.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 10H | Powdered high-speed steel | TiCN | Standard | 10 | - | - | - | 40 ~ 100 | - | 3 ~ 9.9 | - | 4.9 ~ 24 | - | 3 ~ 9.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 10H | Powdered high-speed steel | TiCN | Standard | 10 | - | - | - | - | 37 ~ 99.9 | 3 ~ 9.9 | - | 4.9 ~ 24 | - | 3 ~ 9.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 10H | Powdered high-speed steel | TiCN | Standard | 13 | - | - | - | 40 ~ 100 | - | 6 ~ 12.9 | - | 6.4 ~ 24 | - | 6 ~ 12.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 10H | Powdered high-speed steel | TiCN | Standard | 13 | - | - | - | - | 37 ~ 99.9 | 6 ~ 12.9 | - | 6.4 ~ 24 | - | 6 ~ 12.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 10H | Powdered high-speed steel | TiCN | Standard | 16 | - | - | - | 40 ~ 100 | - | 6 ~ 15.9 | - | 7.9 ~ 24 | - | 6 ~ 15.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 10H | Powdered high-speed steel | TiCN | Standard | 16 | - | - | - | - | 37 ~ 99.9 | 6 ~ 15.9 | - | 7.9 ~ 24 | - | 6 ~ 15.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 10H | Powdered high-speed steel | TiCN | Standard | 20 | - | - | - | 40 ~ 100 | - | 6 ~ 19.9 | - | 9.9 ~ 24 | - | 6 ~ 19.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 10H | Powdered high-speed steel | TiCN | Standard | 20 | - | - | - | - | 37 ~ 99.9 | 6 ~ 19.9 | - | 9.9 ~ 24 | - | 6 ~ 19.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 10H | Powdered high-speed steel | TiCN | Standard | 25 | - | - | - | 40 ~ 100 | - | 6 ~ 24.9 | - | 12.4 ~ 24 | - | 6 ~ 24.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 10H | Powdered high-speed steel | TiCN | Standard | 25 | - | - | - | - | 37 ~ 99.9 | 6 ~ 24.9 | - | 12.4 ~ 24 | - | 6 ~ 24.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 5 | - | - | - | 40 ~ 80 | - | 2 ~ 4.9 | - | 0 | 0 | 2 ~ 4.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 5 | - | - | - | 40 ~ 80 | - | 2 ~ 4.9 | - | 0 | 0.2 ~ 20 | 2 ~ 4.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 5 | - | - | - | 40 ~ 80 | - | 2 ~ 4.9 | - | 0.2 ~ 40 | 0 | 2 ~ 4.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 5 | - | - | - | 40 ~ 80 | - | 2 ~ 4.9 | - | 0.2 ~ 40 | 0.2 ~ 20 | 2 ~ 4.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 5 | - | - | - | - | 37 ~ 79.9 | 2 ~ 4.9 | - | 0 | 0 | 2 ~ 4.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 5 | - | - | - | - | 37 ~ 79.9 | 2 ~ 4.9 | - | 0 | 0.2 ~ 20 | 2 ~ 4.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 5 | - | - | - | - | 37 ~ 79.9 | 2 ~ 4.9 | - | 0.2 ~ 40 | 0 | 2 ~ 4.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 5 | - | - | - | - | 37 ~ 79.9 | 2 ~ 4.9 | - | 0.2 ~ 40 | 0.2 ~ 20 | 2 ~ 4.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 6 | - | - | - | 40 ~ 80 | - | 2 ~ 5.9 | - | 0 | 0 | 2 ~ 5.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 6 | - | - | - | 40 ~ 80 | - | 2 ~ 5.9 | - | 0 | 0.2 ~ 20 | 2 ~ 5.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 6 | - | - | - | 40 ~ 80 | - | 2 ~ 5.9 | - | 0.2 ~ 40 | 0 | 2 ~ 5.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 6 | - | - | - | 40 ~ 80 | - | 2 ~ 5.9 | - | 0.2 ~ 40 | 0.2 ~ 20 | 2 ~ 5.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 6 | - | - | - | - | 37 ~ 79.9 | 2 ~ 5.9 | - | 0 | 0 | 2 ~ 5.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 6 | - | - | - | - | 37 ~ 79.9 | 2 ~ 5.9 | - | 0 | 0.2 ~ 20 | 2 ~ 5.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 6 | - | - | - | - | 37 ~ 79.9 | 2 ~ 5.9 | - | 0.2 ~ 40 | 0 | 2 ~ 5.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 6 | - | - | - | - | 37 ~ 79.9 | 2 ~ 5.9 | - | 0.2 ~ 40 | 0.2 ~ 20 | 2 ~ 5.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 8 | - | - | - | 40 ~ 100 | - | 3 ~ 7.9 | - | 0 | 0 | 3 ~ 7.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 8 | - | - | - | 40 ~ 100 | - | 3 ~ 7.9 | - | 0 | 0.2 ~ 20 | 3 ~ 7.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 8 | - | - | - | 40 ~ 100 | - | 3 ~ 7.9 | - | 0.2 ~ 40 | 0 | 3 ~ 7.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 8 | - | - | - | 40 ~ 100 | - | 3 ~ 7.9 | - | 0.2 ~ 40 | 0.2 ~ 20 | 3 ~ 7.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 8 | - | - | - | - | 37 ~ 99.9 | 3 ~ 7.9 | - | 0 | 0 | 3 ~ 7.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 8 | - | - | - | - | 37 ~ 99.9 | 3 ~ 7.9 | - | 0 | 0.2 ~ 20 | 3 ~ 7.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 8 | - | - | - | - | 37 ~ 99.9 | 3 ~ 7.9 | - | 0.2 ~ 40 | 0 | 3 ~ 7.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 8 | - | - | - | - | 37 ~ 99.9 | 3 ~ 7.9 | - | 0.2 ~ 40 | 0.2 ~ 20 | 3 ~ 7.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 10 | - | - | - | 40 ~ 100 | - | 3 ~ 9.9 | - | 0 | 0 | 3 ~ 9.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 10 | - | - | - | 40 ~ 100 | - | 3 ~ 9.9 | - | 0 | 0.2 ~ 20 | 3 ~ 9.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 10 | - | - | - | 40 ~ 100 | - | 3 ~ 9.9 | - | 0.2 ~ 40 | 0 | 3 ~ 9.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 10 | - | - | - | 40 ~ 100 | - | 3 ~ 9.9 | - | 0.2 ~ 40 | 0.2 ~ 20 | 3 ~ 9.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 10 | - | - | - | - | 37 ~ 99.9 | 3 ~ 9.9 | - | 0 | 0 | 3 ~ 9.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 10 | - | - | - | - | 37 ~ 99.9 | 3 ~ 9.9 | - | 0 | 0.2 ~ 20 | 3 ~ 9.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 10 | - | - | - | - | 37 ~ 99.9 | 3 ~ 9.9 | - | 0.2 ~ 40 | 0 | 3 ~ 9.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 10 | - | - | - | - | 37 ~ 99.9 | 3 ~ 9.9 | - | 0.2 ~ 40 | 0.2 ~ 20 | 3 ~ 9.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 13 | - | - | - | 40 ~ 100 | - | 6 ~ 12.9 | - | 0 | 0 | 6 ~ 12.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 13 | - | - | - | 40 ~ 100 | - | 6 ~ 12.9 | - | 0 | 0.2 ~ 20 | 6 ~ 12.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 13 | - | - | - | 40 ~ 100 | - | 6 ~ 12.9 | - | 0.2 ~ 40 | 0 | 6 ~ 12.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 13 | - | - | - | 40 ~ 100 | - | 6 ~ 12.9 | - | 0.2 ~ 40 | 0.2 ~ 20 | 6 ~ 12.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 13 | - | - | - | - | 37 ~ 99.9 | 6 ~ 12.9 | - | 0 | 0 | 6 ~ 12.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 13 | - | - | - | - | 37 ~ 99.9 | 6 ~ 12.9 | - | 0 | 0.2 ~ 20 | 6 ~ 12.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 13 | - | - | - | - | 37 ~ 99.9 | 6 ~ 12.9 | - | 0.2 ~ 40 | 0 | 6 ~ 12.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 13 | - | - | - | - | 37 ~ 99.9 | 6 ~ 12.9 | - | 0.2 ~ 40 | 0.2 ~ 20 | 6 ~ 12.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 16 | - | - | - | 40 ~ 100 | - | 6 ~ 15.9 | - | 0 | 0 | 6 ~ 15.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 16 | - | - | - | 40 ~ 100 | - | 6 ~ 15.9 | - | 0 | 0.2 ~ 20 | 6 ~ 15.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 16 | - | - | - | 40 ~ 100 | - | 6 ~ 15.9 | - | 0.2 ~ 40 | 0 | 6 ~ 15.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 16 | - | - | - | 40 ~ 100 | - | 6 ~ 15.9 | - | 0.2 ~ 40 | 0.2 ~ 20 | 6 ~ 15.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 16 | - | - | - | - | 37 ~ 99.9 | 6 ~ 15.9 | - | 0 | 0 | 6 ~ 15.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 16 | - | - | - | - | 37 ~ 99.9 | 6 ~ 15.9 | - | 0 | 0.2 ~ 20 | 6 ~ 15.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 16 | - | - | - | - | 37 ~ 99.9 | 6 ~ 15.9 | - | 0.2 ~ 40 | 0 | 6 ~ 15.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 16 | - | - | - | - | 37 ~ 99.9 | 6 ~ 15.9 | - | 0.2 ~ 40 | 0.2 ~ 20 | 6 ~ 15.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 20 | - | - | - | 40 ~ 100 | - | 6 ~ 19.9 | - | 0 | 0 | 6 ~ 19.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 20 | - | - | - | 40 ~ 100 | - | 6 ~ 19.9 | - | 0 | 0.2 ~ 20 | 6 ~ 19.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 20 | - | - | - | 40 ~ 100 | - | 6 ~ 19.9 | - | 0.2 ~ 40 | 0 | 6 ~ 19.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 20 | - | - | - | 40 ~ 100 | - | 6 ~ 19.9 | - | 0.2 ~ 40 | 0.2 ~ 20 | 6 ~ 19.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 20 | - | - | - | - | 37 ~ 99.9 | 6 ~ 19.9 | - | 0 | 0 | 6 ~ 19.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 20 | - | - | - | - | 37 ~ 99.9 | 6 ~ 19.9 | - | 0 | 0.2 ~ 20 | 6 ~ 19.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 20 | - | - | - | - | 37 ~ 99.9 | 6 ~ 19.9 | - | 0.2 ~ 40 | 0 | 6 ~ 19.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 20 | - | - | - | - | 37 ~ 99.9 | 6 ~ 19.9 | - | 0.2 ~ 40 | 0.2 ~ 20 | 6 ~ 19.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 25 | - | - | - | 40 ~ 100 | - | 6 ~ 24.9 | - | 0 | 0 | 6 ~ 24.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 25 | - | - | - | 40 ~ 100 | - | 6 ~ 24.9 | - | 0 | 0.2 ~ 20 | 6 ~ 24.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 25 | - | - | - | 40 ~ 100 | - | 6 ~ 24.9 | - | 0.2 ~ 40 | 0 | 6 ~ 24.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 25 | - | - | - | 40 ~ 100 | - | 6 ~ 24.9 | - | 0.2 ~ 40 | 0.2 ~ 20 | 6 ~ 24.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 25 | - | - | - | - | 37 ~ 99.9 | 6 ~ 24.9 | - | 0 | 0 | 6 ~ 24.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 25 | - | - | - | - | 37 ~ 99.9 | 6 ~ 24.9 | - | 0 | 0.2 ~ 20 | 6 ~ 24.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 25 | - | - | - | - | 37 ~ 99.9 | 6 ~ 24.9 | - | 0.2 ~ 40 | 0 | 6 ~ 24.9 | ||
- | COATING PUNCH | 1 Piece(s) | 5 Day(s) | 10 | 11H | Powdered high-speed steel | TiCN | Standard | 25 | - | - | - | - | 37 ~ 99.9 | 6 ~ 24.9 | - | 0.2 ~ 40 | 0.2 ~ 20 | 6 ~ 24.9 | ||
- | COATING PUNCH | 1 Piece(s) | 10 Day(s) | 10 | 11J | Powdered high-speed steel | TiCN | Standard | 5 | 1 ~ 4 | 1 ~ 4.8 | - | 40 ~ 80 | - | 2 ~ 4.9 | - | - | - | 2 ~ 4.9 | ||
- | COATING PUNCH | 1 Piece(s) | 10 Day(s) | 10 | 11J | Powdered high-speed steel | TiCN | Standard | 5 | 1 ~ 4 | 1 ~ 4.8 | - | - | 37 ~ 79.9 | 2 ~ 4.9 | - | - | - | 2 ~ 4.9 | ||
- | COATING PUNCH | 1 Piece(s) | 10 Day(s) | 10 | 11J | Powdered high-speed steel | TiCN | Standard | 6 | 1 ~ 5 | 1 ~ 5.8 | - | 40 ~ 80 | - | 2 ~ 5.9 | - | - | - | 2 ~ 5.9 | ||
- | COATING PUNCH | 1 Piece(s) | 10 Day(s) | 10 | 11J | Powdered high-speed steel | TiCN | Standard | 6 | 1 ~ 5 | 1 ~ 5.8 | - | - | 37 ~ 79.9 | 2 ~ 5.9 | - | - | - | 2 ~ 5.9 |
Loading...
Type | Jector punch |
---|
How can we improve?
How can we improve?