(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
กรุณาตรวจสอบรหัสสินค้าที่ถูกต้องก่อนขอราคาและสั่งซื้อ เนื่องจากเป็นสินค้าสั่งทำจึงไม่สามารถเปลี่ยนคืนได้
- หากเลือกความยาวแบบ LC ค่า B จะไม่สามารถอ้างอิงตามตาราง standard ได้
- สอบถามข้อมูลเพิ่มเติม ติดต่อมิซูมิ
Please recheck part number before quoting or ordering products, due to this is made-to-order item and cannot be returned.
If you have any questions, please contact MISUMI.
Part Number |
---|
AH-APHTWA5-[50,60,70,80]-P[1.5-4.98/0.01]-B[2-40/0.1]-V[1.51-4.99/0.01]-F[5-45/0.1] |
AH-APHTWA5-LC[45-79.9/0.1]-P[1.5-4.98/0.01]-B[2-40/0.1]-V[1.51-4.99/0.01]-F[5-45/0.1] |
AH-APHTWA6-[50,60,70,80]-P[1.5-5.98/0.01]-B[2-40/0.1]-V[2.01-5.99/0.01]-F[5-45/0.1] |
AH-APHTWA6-LC[45-79.9/0.1]-P[1.5-5.98/0.01]-B[2-40/0.1]-V[2.01-5.99/0.01]-F[5-45/0.1] |
AH-APHTWA8-[50-100/10]-P[1.5-7.98/0.01]-B[2-60/0.1]-V[1.51-7.99/0.01]-F[5-60/0.1] |
AH-APHTWA8-LC[45-99.9/0.1]-P[1.5-7.98/0.01]-B[2-60/0.1]-V[1.51-7.99/0.01]-F[5-60/0.1] |
AH-APHTWA10-[50-100/10]-P[1.5-9.98/0.01]-B[2-60/0.1]-V[1.51-9.99/0.01]-F[5-60/0.1] |
AH-APHTWA10-LC[45-99.9/0.1]-P[1.5-9.98/0.01]-B[2-60/0.1]-V[1.51-9.99/0.01]-F[5-60/0.1] |
AH-APHTWA13-[50-100/10]-P[3-12.98/0.01]-B[2-60/0.1]-V[3.01-12.99/0.01]-F[5-60/0.1] |
AH-APHTWA13-LC[45-99.9/0.1]-P[3-12.98/0.01]-B[2-60/0.1]-V[3.01-12.99/0.01]-F[5-60/0.1] |
AH-APHTWA16-[50-100/10]-P[5-15.98/0.01]-B[2-60/0.1]-V[5.01-15.99/0.01]-F[5-60/0.1] |
AH-APHTWA16-LC[45-99.9/0.1]-P[5-15.98/0.01]-B[2-60/0.1]-V[5.01-15.99/0.01]-F[5-60/0.1] |
AH-APHTWA20-[50-100/10]-P[6.5-19.98/0.01]-B[2-60/0.1]-V[6.51-19.99/0.01]-F[5-60/0.1] |
AH-APHTWA20-LC[45-99.9/0.1]-P[6.5-19.98/0.01]-B[2-60/0.1]-V[6.51-19.99/0.01]-F[5-60/0.1] |
AH-APHTWA25-[50-100/10]-P[9-24.98/0.01]-B[2-60/0.1]-V[9.01-24.99/0.01]-F[5-60/0.1] |
AH-APHTWA25-LC[45-99.9/0.1]-P[9-24.98/0.01]-B[2-60/0.1]-V[9.01-24.99/0.01]-F[5-60/0.1] |
AH-APHTWD5-[50,60,70,80]-P[1-4.96/0.01]-W[1-4.96/0.01]-B[2-25/0.1]-V[1.03-4.99/0.01]-F[5-45/0.1] |
AH-APHTWD5-LC[45-79.9/0.1]-P[1-4.96/0.01]-W[1-4.96/0.01]-B[2-25/0.1]-V[1.03-4.99/0.01]-F[5-45/0.1] |
AH-APHTWD6-[50,60,70,80]-P[1-5.96/0.01]-W[1-5.96/0.01]-B[2-30/0.1]-V[1.03-5.99/0.01]-F[5-45/0.1] |
AH-APHTWD6-LC[45-79.9/0.1]-P[1-5.96/0.01]-W[1-5.96/0.01]-B[2-30/0.1]-V[1.03-5.99/0.01]-F[5-45/0.1] |
AH-APHTWD8-[50-100/10]-P[1-7.96/0.01]-W[1-7.96/0.01]-B[2-30/0.1]-V[1.03-7.99/0.01]-F[5-60/0.1] |
AH-APHTWD8-LC[45-99.9/0.1]-P[1-7.96/0.01]-W[1-7.96/0.01]-B[2-30/0.1]-V[1.03-7.99/0.01]-F[5-60/0.1] |
AH-APHTWD10-[50-100/10]-P[1.25-9.96/0.01]-W[1.25-9.96/0.01]-B[2-30/0.1]-V[1.28-9.99/0.01]-F[5-60/0.1] |
AH-APHTWD10-LC[45-99.9/0.1]-P[1.25-9.96/0.01]-W[1.25-9.96/0.01]-B[2-30/0.1]-V[1.28-9.99/0.01]-F[5-60/0.1] |
AH-APHTWD13-[50-100/10]-P[1.5-12.96/0.01]-W[1.5-12.96/0.01]-B[2-30/0.1]-V[1.53-12.99/0.01]-F[5-60/0.1] |
AH-APHTWD13-LC[45-99.9/0.1]-P[1.5-12.96/0.01]-W[1.5-12.96/0.01]-B[2-30/0.1]-V[1.53-12.99/0.01]-F[5-60/0.1] |
AH-APHTWD16-[50-100/10]-P[2-15.96/0.01]-W[2-15.96/0.01]-B[2-30/0.1]-V[2.03-15.99/0.01]-F[5-60/0.1] |
AH-APHTWD16-LC[45-99.9/0.1]-P[2-15.96/0.01]-W[2-15.96/0.01]-B[2-30/0.1]-V[2.03-15.99/0.01]-F[5-60/0.1] |
AH-APHTWD20-[50-100/10]-P[2.5-19.96/0.01]-W[2.5-19.96/0.01]-B[2-30/0.1]-V[2.53-19.99/0.01]-F[5-60/0.1] |
AH-APHTWD20-LC[45-99.9/0.1]-P[2.5-19.96/0.01]-W[2.5-19.96/0.01]-B[2-30/0.1]-V[2.53-19.99/0.01]-F[5-60/0.1] |
AH-APHTWD25-[50-100/10]-P[3-24.96/0.01]-W[3-24.96/0.01]-B[2-30/0.1]-V[3.03-24.99/0.01]-F[5-60/0.1] |
AH-APHTWD25-LC[45-99.9/0.1]-P[3-24.96/0.01]-W[3-24.96/0.01]-B[2-30/0.1]-V[3.03-24.99/0.01]-F[5-60/0.1] |
AH-APHTWE5-[50,60,70,80]-P[1-4.95/0.01]-W[1.01-4.96/0.01]-B[2-25/0.1]-V[1.03-4.99/0.01]-F[5-45/0.1] |
AH-APHTWE5-LC[45-79.9/0.1]-P[1-4.95/0.01]-W[1.01-4.96/0.01]-B[2-25/0.1]-V[1.03-4.99/0.01]-F[5-45/0.1] |
AH-APHTWE6-[50,60,70,80]-P[1-5.95/0.01]-W[1.01-5.96/0.01]-B[2-30/0.1]-V[1.03-5.99/0.01]-F[5-45/0.1] |
AH-APHTWE6-LC[45-79.9/0.1]-P[1-5.95/0.01]-W[1.01-5.96/0.01]-B[2-30/0.1]-V[1.03-5.99/0.01]-F[5-45/0.1] |
AH-APHTWE8-[50-100/10]-P[1-7.96/0.01]-W[1-7.96/0.01]-B[2-30/0.1]-V[1.03-7.99/0.01]-F[5-60/0.1] |
AH-APHTWE8-LC[45-99.9/0.1]-P[1-7.96/0.01]-W[1-7.96/0.01]-B[2-30/0.1]-V[1.03-7.99/0.01]-F[5-60/0.1] |
AH-APHTWE10-[50-100/10]-P[1.25-9.96/0.01]-W[1.25-9.96/0.01]-B[2-30/0.1]-V[1.28-9.99/0.01]-F[5-60/0.1] |
AH-APHTWE10-LC[45-99.9/0.1]-P[1.25-9.96/0.01]-W[1.25-9.96/0.01]-B[2-30/0.1]-V[1.28-9.99/0.01]-F[5-60/0.1] |
AH-APHTWE13-[50-100/10]-P[1.5-12.96/0.01]-W[1.5-12.96/0.01]-B[2-30/0.1]-V[1.53-12.99/0.01]-F[5-60/0.1] |
AH-APHTWE13-LC[45-99.9/0.1]-P[1.5-12.96/0.01]-W[1.5-12.96/0.01]-B[2-30/0.1]-V[1.53-12.99/0.01]-F[5-60/0.1] |
AH-APHTWE16-[50-100/10]-P[2-15.96/0.01]-W[2-15.96/0.01]-B[2-30/0.1]-V[2.03-15.99/0.01]-F[5-60/0.1] |
AH-APHTWE16-LC[45-99.9/0.1]-P[2-15.96/0.01]-W[2-15.96/0.01]-B[2-30/0.1]-V[2.03-15.99/0.01]-F[5-60/0.1] |
AH-APHTWE20-[50-100/10]-P[2.5-19.96/0.01]-W[2.5-19.96/0.01]-B[2-30/0.1]-V[2.53-19.99/0.01]-F[5-60/0.1] |
AH-APHTWE20-LC[45-99.9/0.1]-P[2.5-19.96/0.01]-W[2.5-19.96/0.01]-B[2-30/0.1]-V[2.53-19.99/0.01]-F[5-60/0.1] |
AH-APHTWE25-[50-100/10]-P[3-24.96/0.01]-W[3-24.96/0.01]-B[2-30/0.1]-V[3.03-24.99/0.01]-F[5-60/0.1] |
AH-APHTWE25-LC[45-99.9/0.1]-P[3-24.96/0.01]-W[3-24.96/0.01]-B[2-30/0.1]-V[3.03-24.99/0.01]-F[5-60/0.1] |
AH-APHTWG5-[50,60,70,80]-P[1-4.95/0.01]-W[1.01-4.96/0.01]-B[2-25/0.1]-V[1.03-4.99/0.01]-F[5-45/0.1] |
AH-APHTWG5-LC[45-79.9/0.1]-P[1-4.95/0.01]-W[1.01-4.96/0.01]-B[2-25/0.1]-V[1.03-4.99/0.01]-F[5-45/0.1] |
AH-APHTWG6-[50,60,70,80]-P[1-5.95/0.01]-W[1.01-5.96/0.01]-B[2-30/0.1]-V[1.03-5.99/0.01]-F[5-45/0.1] |
AH-APHTWG6-LC[45-79.9/0.1]-P[1-5.95/0.01]-W[1.01-5.96/0.01]-B[2-30/0.1]-V[1.03-5.99/0.01]-F[5-45/0.1] |
AH-APHTWG8-[50-100/10]-P[1-7.96/0.01]-W[1-7.96/0.01]-B[2-30/0.1]-V[1.03-7.99/0.01]-F[5-60/0.1] |
AH-APHTWG8-LC[45-99.9/0.1]-P[1-7.96/0.01]-W[1-7.96/0.01]-B[2-30/0.1]-V[1.03-7.99/0.01]-F[5-60/0.1] |
AH-APHTWG10-[50-100/10]-P[1.25-9.96/0.01]-W[1.25-9.96/0.01]-B[2-30/0.1]-V[1.28-9.99/0.01]-F[5-60/0.1] |
AH-APHTWG10-LC[45-99.9/0.1]-P[1.25-9.96/0.01]-W[1.25-9.96/0.01]-B[2-30/0.1]-V[1.28-9.99/0.01]-F[5-60/0.1] |
AH-APHTWG13-[50-100/10]-P[1.5-12.96/0.01]-W[1.5-12.96/0.01]-B[2-30/0.1]-V[1.53-12.99/0.01]-F[5-60/0.1] |
AH-APHTWG13-LC[45-99.9/0.1]-P[1.5-12.96/0.01]-W[1.5-12.96/0.01]-B[2-30/0.1]-V[1.53-12.99/0.01]-F[5-60/0.1] |
AH-APHTWG16-[50-100/10]-P[2-15.96/0.01]-W[2-15.96/0.01]-B[2-30/0.1]-V[2.03-15.99/0.01]-F[5-60/0.1] |
AH-APHTWG16-LC[45-99.9/0.1]-P[2-15.96/0.01]-W[2-15.96/0.01]-B[2-30/0.1]-V[2.03-15.99/0.01]-F[5-60/0.1] |
AH-APHTWG20-[50-100/10]-P[2.5-19.96/0.01]-W[2.5-19.96/0.01]-B[2-30/0.1]-V[2.53-19.99/0.01]-F[5-60/0.1] |
AH-APHTWG20-LC[45-99.9/0.1]-P[2.5-19.96/0.01]-W[2.5-19.96/0.01]-B[2-30/0.1]-V[2.53-19.99/0.01]-F[5-60/0.1] |
AH-APHTWG25-[50-100/10]-P[3-24.96/0.01]-W[3-24.96/0.01]-B[2-30/0.1]-V[3.03-24.99/0.01]-F[5-60/0.1] |
AH-APHTWG25-LC[45-99.9/0.1]-P[3-24.96/0.01]-W[3-24.96/0.01]-B[2-30/0.1]-V[3.03-24.99/0.01]-F[5-60/0.1] |
AH-APHTWR5-[50,60,70,80]-P[1-4.96/0.01]-W[1-4.96/0.01]-B[2-25/0.1]-V[1.03-4.99/0.01]-F[5-45/0.1]-R[0.15-2.45/0.1] |
AH-APHTWR5-LC[45-79.9/0.1]-P[1-4.96/0.01]-W[1-4.96/0.01]-B[2-25/0.1]-V[1.03-4.99/0.01]-F[5-45/0.1]-R[0.15-2.45/0.1] |
AH-APHTWR6-[50,60,70,80]-P[1-5.96/0.01]-W[1-5.96/0.01]-B[2-30/0.1]-V[1.03-5.99/0.01]-F[5-45/0.1]-R[0.15-2.95/0.1] |
AH-APHTWR6-LC[45-79.9/0.1]-P[1-5.96/0.01]-W[1-5.96/0.01]-B[2-30/0.1]-V[1.03-5.99/0.01]-F[5-45/0.1]-R[0.15-2.95/0.1] |
AH-APHTWR8-[50-100/10]-P[1-7.96/0.01]-W[1-7.96/0.01]-B[2-30/0.1]-V[1.03-7.99/0.01]-F[5-60/0.1]-R[0.15-3.97/0.01] |
AH-APHTWR8-LC[45-99.9/0.1]-P[1-7.96/0.01]-W[1-7.96/0.01]-B[2-30/0.1]-V[1.03-7.99/0.01]-F[5-60/0.1]-R[0.15-3.97/0.01] |
AH-APHTWR10-[50-100/10]-P[1.25-9.96/0.01]-W[1.25-9.96/0.01]-B[2-30/0.1]-V[1.28-9.99/0.01]-F[5-60/0.1]-R[0.15-4.97/0.01] |
AH-APHTWR10-LC[45-99.9/0.1]-P[1.25-9.96/0.01]-W[1.25-9.96/0.01]-B[2-30/0.1]-V[1.28-9.99/0.01]-F[5-60/0.1]-R[0.15-4.97/0.01] |
AH-APHTWR13-[50-100/10]-P[1.5-12.96/0.01]-W[1.5-12.96/0.01]-B[2-30/0.1]-V[1.53-12.99/0.01]-F[5-60/0.1]-R[0.15-6.47/0.01] |
AH-APHTWR13-LC[45-99.9/0.1]-P[1.5-12.96/0.01]-W[1.5-12.96/0.01]-B[2-30/0.1]-V[1.53-12.99/0.01]-F[5-60/0.1]-R[0.15-6.47/0.01] |
AH-APHTWR16-[50-100/10]-P[2-15.96/0.01]-W[2-15.96/0.01]-B[2-30/0.1]-V[2.03-15.99/0.01]-F[5-60/0.1]-R[0.15-7.97/0.01] |
AH-APHTWR16-LC[45-99.9/0.1]-P[2-15.96/0.01]-W[2-15.96/0.01]-B[2-30/0.1]-V[2.03-15.99/0.01]-F[5-60/0.1]-R[0.15-7.97/0.01] |
AH-APHTWR20-[50-100/10]-P[2.5-19.96/0.01]-W[2.5-19.96/0.01]-B[2-30/0.1]-V[2.53-19.99/0.01]-F[5-60/0.1]-R[0.15-9.97/0.01] |
AH-APHTWR20-LC[45-99.9/0.1]-P[2.5-19.96/0.01]-W[2.5-19.96/0.01]-B[2-30/0.1]-V[2.53-19.99/0.01]-F[5-60/0.1]-R[0.15-9.97/0.01] |
AH-APHTWR25-[50-100/10]-P[3-24.96/0.01]-W[3-24.96/0.01]-B[2-30/0.1]-V[3.03-24.99/0.01]-F[5-60/0.1]-R[0.15-12.47/0.01] |
AH-APHTWR25-LC[45-99.9/0.1]-P[3-24.96/0.01]-W[3-24.96/0.01]-B[2-30/0.1]-V[3.03-24.99/0.01]-F[5-60/0.1]-R[0.15-12.47/0.01] |
AH-APTWA5-[50,60,70,80]-P[1.5-4.98/0.01]-B[2-40/0.1]-V[1.51-4.99/0.01]-F[5-45/0.1] |
AH-APTWA5-LC[45-79.9/0.1]-P[1.5-4.98/0.01]-B[2-40/0.1]-V[1.51-4.99/0.01]-F[5-45/0.1] |
AH-APTWA6-[50,60,70,80]-P[1.5-5.98/0.01]-B[2-40/0.1]-V[2.01-5.99/0.01]-F[5-45/0.1] |
AH-APTWA6-LC[45-79.9/0.1]-P[1.5-5.98/0.01]-B[2-40/0.1]-V[2.01-5.99/0.01]-F[5-45/0.1] |
AH-APTWA8-[50-100/10]-P[1.5-7.98/0.01]-B[2-60/0.1]-V[1.51-7.99/0.01]-F[5-60/0.1] |
AH-APTWA8-LC[45-99.9/0.1]-P[1.5-7.98/0.01]-B[2-60/0.1]-V[1.51-7.99/0.01]-F[5-60/0.1] |
AH-APTWA10-[50-100/10]-P[1.5-9.98/0.01]-B[2-60/0.1]-V[1.51-9.99/0.01]-F[5-60/0.1] |
AH-APTWA10-LC[45-99.9/0.1]-P[1.5-9.98/0.01]-B[2-60/0.1]-V[1.51-9.99/0.01]-F[5-60/0.1] |
AH-APTWA13-[50-100/10]-P[3-12.98/0.01]-B[2-60/0.1]-V[3.01-12.99/0.01]-F[5-60/0.1] |
AH-APTWA13-LC[45-99.9/0.1]-P[3-12.98/0.01]-B[2-60/0.1]-V[3.01-12.99/0.01]-F[5-60/0.1] |
Part Number | Price | Name | Minimum Order Qty. | Volume Discount | Days to Ship | RoHS | Tip shape | Material | Shank diameter D tolerance | D (Shank diameter) (mm) | P (Tip dimension) (mm) | L (L dimension) (mm) | LC (Full length alteration) (mm) | B (Tip length) (mm) | F (Length from tip end to second step R) (mm) | W (Tip dimension) (mm) | R (Tip corner R) (mm) | V (Second step tip diameter) (mm) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 4 Day(s) | 10 | A | Powdered high-speed steel | +0.005/0 | 5 | 1.5 ~ 4.98 | 50 ~ 80 | - | 2 ~ 40 | 5 ~ 45 | - | - | 1.51 ~ 4.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 4 Day(s) | 10 | A | Powdered high-speed steel | +0.005/0 | 5 | 1.5 ~ 4.98 | - | 45 ~ 79.9 | 2 ~ 40 | 5 ~ 45 | - | - | 1.51 ~ 4.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 4 Day(s) | 10 | A | Powdered high-speed steel | +0.005/0 | 6 | 1.5 ~ 5.98 | 50 ~ 80 | - | 2 ~ 40 | 5 ~ 45 | - | - | 2.01 ~ 5.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 4 Day(s) | 10 | A | Powdered high-speed steel | +0.005/0 | 6 | 1.5 ~ 5.98 | - | 45 ~ 79.9 | 2 ~ 40 | 5 ~ 45 | - | - | 2.01 ~ 5.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 3 Day(s) | 10 | A | Powdered high-speed steel | +0.005/0 | 8 | 1.5 ~ 7.98 | 50 ~ 100 | - | 2 ~ 60 | 5 ~ 60 | - | - | 1.51 ~ 7.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 3 Day(s) | 10 | A | Powdered high-speed steel | +0.005/0 | 8 | 1.5 ~ 7.98 | - | 45 ~ 99.9 | 2 ~ 60 | 5 ~ 60 | - | - | 1.51 ~ 7.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 4 Day(s) | 10 | A | Powdered high-speed steel | +0.005/0 | 10 | 1.5 ~ 9.98 | 50 ~ 100 | - | 2 ~ 60 | 5 ~ 60 | - | - | 1.51 ~ 9.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 4 Day(s) | 10 | A | Powdered high-speed steel | +0.005/0 | 10 | 1.5 ~ 9.98 | - | 45 ~ 99.9 | 2 ~ 60 | 5 ~ 60 | - | - | 1.51 ~ 9.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 4 Day(s) | 10 | A | Powdered high-speed steel | +0.005/0 | 13 | 3 ~ 12.98 | 50 ~ 100 | - | 2 ~ 60 | 5 ~ 60 | - | - | 3.01 ~ 12.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 4 Day(s) | 10 | A | Powdered high-speed steel | +0.005/0 | 13 | 3 ~ 12.98 | - | 45 ~ 99.9 | 2 ~ 60 | 5 ~ 60 | - | - | 3.01 ~ 12.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 4 Day(s) | 10 | A | Powdered high-speed steel | +0.005/0 | 16 | 5 ~ 15.98 | 50 ~ 100 | - | 2 ~ 60 | 5 ~ 60 | - | - | 5.01 ~ 15.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 4 Day(s) | 10 | A | Powdered high-speed steel | +0.005/0 | 16 | 5 ~ 15.98 | - | 45 ~ 99.9 | 2 ~ 60 | 5 ~ 60 | - | - | 5.01 ~ 15.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 4 Day(s) | 10 | A | Powdered high-speed steel | +0.005/0 | 20 | 6.5 ~ 19.98 | 50 ~ 100 | - | 2 ~ 60 | 5 ~ 60 | - | - | 6.51 ~ 19.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 4 Day(s) | 10 | A | Powdered high-speed steel | +0.005/0 | 20 | 6.5 ~ 19.98 | - | 45 ~ 99.9 | 2 ~ 60 | 5 ~ 60 | - | - | 6.51 ~ 19.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 4 Day(s) | 10 | A | Powdered high-speed steel | +0.005/0 | 25 | 9 ~ 24.98 | 50 ~ 100 | - | 2 ~ 60 | 5 ~ 60 | - | - | 9.01 ~ 24.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 4 Day(s) | 10 | A | Powdered high-speed steel | +0.005/0 | 25 | 9 ~ 24.98 | - | 45 ~ 99.9 | 2 ~ 60 | 5 ~ 60 | - | - | 9.01 ~ 24.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | D | Powdered high-speed steel | +0.005/0 | 5 | 1 ~ 4.96 | 50 ~ 80 | - | 2 ~ 25 | 5 ~ 45 | 1 ~ 4.96 | - | 1.03 ~ 4.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | D | Powdered high-speed steel | +0.005/0 | 5 | 1 ~ 4.96 | - | 45 ~ 79.9 | 2 ~ 25 | 5 ~ 45 | 1 ~ 4.96 | - | 1.03 ~ 4.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | D | Powdered high-speed steel | +0.005/0 | 6 | 1 ~ 5.96 | 50 ~ 80 | - | 2 ~ 30 | 5 ~ 45 | 1 ~ 5.96 | - | 1.03 ~ 5.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | D | Powdered high-speed steel | +0.005/0 | 6 | 1 ~ 5.96 | - | 45 ~ 79.9 | 2 ~ 30 | 5 ~ 45 | 1 ~ 5.96 | - | 1.03 ~ 5.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | D | Powdered high-speed steel | +0.005/0 | 8 | 1 ~ 7.96 | 50 ~ 100 | - | 2 ~ 30 | 5 ~ 60 | 1 ~ 7.96 | - | 1.03 ~ 7.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | D | Powdered high-speed steel | +0.005/0 | 8 | 1 ~ 7.96 | - | 45 ~ 99.9 | 2 ~ 30 | 5 ~ 60 | 1 ~ 7.96 | - | 1.03 ~ 7.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | D | Powdered high-speed steel | +0.005/0 | 10 | 1.25 ~ 9.96 | 50 ~ 100 | - | 2 ~ 30 | 5 ~ 60 | 1.25 ~ 9.96 | - | 1.28 ~ 9.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | D | Powdered high-speed steel | +0.005/0 | 10 | 1.25 ~ 9.96 | - | 45 ~ 99.9 | 2 ~ 30 | 5 ~ 60 | 1.25 ~ 9.96 | - | 1.28 ~ 9.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | D | Powdered high-speed steel | +0.005/0 | 13 | 1.5 ~ 12.96 | 50 ~ 100 | - | 2 ~ 30 | 5 ~ 60 | 1.5 ~ 12.96 | - | 1.53 ~ 12.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | D | Powdered high-speed steel | +0.005/0 | 13 | 1.5 ~ 12.96 | - | 45 ~ 99.9 | 2 ~ 30 | 5 ~ 60 | 1.5 ~ 12.96 | - | 1.53 ~ 12.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | D | Powdered high-speed steel | +0.005/0 | 16 | 2 ~ 15.96 | 50 ~ 100 | - | 2 ~ 30 | 5 ~ 60 | 2 ~ 15.96 | - | 2.03 ~ 15.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | D | Powdered high-speed steel | +0.005/0 | 16 | 2 ~ 15.96 | - | 45 ~ 99.9 | 2 ~ 30 | 5 ~ 60 | 2 ~ 15.96 | - | 2.03 ~ 15.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | D | Powdered high-speed steel | +0.005/0 | 20 | 2.5 ~ 19.96 | 50 ~ 100 | - | 2 ~ 30 | 5 ~ 60 | 2.5 ~ 19.96 | - | 2.53 ~ 19.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | D | Powdered high-speed steel | +0.005/0 | 20 | 2.5 ~ 19.96 | - | 45 ~ 99.9 | 2 ~ 30 | 5 ~ 60 | 2.5 ~ 19.96 | - | 2.53 ~ 19.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | D | Powdered high-speed steel | +0.005/0 | 25 | 3 ~ 24.96 | 50 ~ 100 | - | 2 ~ 30 | 5 ~ 60 | 3 ~ 24.96 | - | 3.03 ~ 24.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | D | Powdered high-speed steel | +0.005/0 | 25 | 3 ~ 24.96 | - | 45 ~ 99.9 | 2 ~ 30 | 5 ~ 60 | 3 ~ 24.96 | - | 3.03 ~ 24.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | E | Powdered high-speed steel | +0.005/0 | 5 | 1 ~ 4.95 | 50 ~ 80 | - | 2 ~ 25 | 5 ~ 45 | 1.01 ~ 4.96 | - | 1.03 ~ 4.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | E | Powdered high-speed steel | +0.005/0 | 5 | 1 ~ 4.95 | - | 45 ~ 79.9 | 2 ~ 25 | 5 ~ 45 | 1.01 ~ 4.96 | - | 1.03 ~ 4.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | E | Powdered high-speed steel | +0.005/0 | 6 | 1 ~ 5.95 | 50 ~ 80 | - | 2 ~ 30 | 5 ~ 45 | 1.01 ~ 5.96 | - | 1.03 ~ 5.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | E | Powdered high-speed steel | +0.005/0 | 6 | 1 ~ 5.95 | - | 45 ~ 79.9 | 2 ~ 30 | 5 ~ 45 | 1.01 ~ 5.96 | - | 1.03 ~ 5.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | E | Powdered high-speed steel | +0.005/0 | 8 | 1 ~ 7.96 | 50 ~ 100 | - | 2 ~ 30 | 5 ~ 60 | 1 ~ 7.96 | - | 1.03 ~ 7.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | E | Powdered high-speed steel | +0.005/0 | 8 | 1 ~ 7.96 | - | 45 ~ 99.9 | 2 ~ 30 | 5 ~ 60 | 1 ~ 7.96 | - | 1.03 ~ 7.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | E | Powdered high-speed steel | +0.005/0 | 10 | 1.25 ~ 9.96 | 50 ~ 100 | - | 2 ~ 30 | 5 ~ 60 | 1.25 ~ 9.96 | - | 1.28 ~ 9.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | E | Powdered high-speed steel | +0.005/0 | 10 | 1.25 ~ 9.96 | - | 45 ~ 99.9 | 2 ~ 30 | 5 ~ 60 | 1.25 ~ 9.96 | - | 1.28 ~ 9.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | E | Powdered high-speed steel | +0.005/0 | 13 | 1.5 ~ 12.96 | 50 ~ 100 | - | 2 ~ 30 | 5 ~ 60 | 1.5 ~ 12.96 | - | 1.53 ~ 12.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | E | Powdered high-speed steel | +0.005/0 | 13 | 1.5 ~ 12.96 | - | 45 ~ 99.9 | 2 ~ 30 | 5 ~ 60 | 1.5 ~ 12.96 | - | 1.53 ~ 12.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | E | Powdered high-speed steel | +0.005/0 | 16 | 2 ~ 15.96 | 50 ~ 100 | - | 2 ~ 30 | 5 ~ 60 | 2 ~ 15.96 | - | 2.03 ~ 15.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | E | Powdered high-speed steel | +0.005/0 | 16 | 2 ~ 15.96 | - | 45 ~ 99.9 | 2 ~ 30 | 5 ~ 60 | 2 ~ 15.96 | - | 2.03 ~ 15.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | E | Powdered high-speed steel | +0.005/0 | 20 | 2.5 ~ 19.96 | 50 ~ 100 | - | 2 ~ 30 | 5 ~ 60 | 2.5 ~ 19.96 | - | 2.53 ~ 19.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | E | Powdered high-speed steel | +0.005/0 | 20 | 2.5 ~ 19.96 | - | 45 ~ 99.9 | 2 ~ 30 | 5 ~ 60 | 2.5 ~ 19.96 | - | 2.53 ~ 19.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | E | Powdered high-speed steel | +0.005/0 | 25 | 3 ~ 24.96 | 50 ~ 100 | - | 2 ~ 30 | 5 ~ 60 | 3 ~ 24.96 | - | 3.03 ~ 24.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | E | Powdered high-speed steel | +0.005/0 | 25 | 3 ~ 24.96 | - | 45 ~ 99.9 | 2 ~ 30 | 5 ~ 60 | 3 ~ 24.96 | - | 3.03 ~ 24.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | G | Powdered high-speed steel | +0.005/0 | 5 | 1 ~ 4.95 | 50 ~ 80 | - | 2 ~ 25 | 5 ~ 45 | 1.01 ~ 4.96 | - | 1.03 ~ 4.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | G | Powdered high-speed steel | +0.005/0 | 5 | 1 ~ 4.95 | - | 45 ~ 79.9 | 2 ~ 25 | 5 ~ 45 | 1.01 ~ 4.96 | - | 1.03 ~ 4.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | G | Powdered high-speed steel | +0.005/0 | 6 | 1 ~ 5.95 | 50 ~ 80 | - | 2 ~ 30 | 5 ~ 45 | 1.01 ~ 5.96 | - | 1.03 ~ 5.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | G | Powdered high-speed steel | +0.005/0 | 6 | 1 ~ 5.95 | - | 45 ~ 79.9 | 2 ~ 30 | 5 ~ 45 | 1.01 ~ 5.96 | - | 1.03 ~ 5.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | G | Powdered high-speed steel | +0.005/0 | 8 | 1 ~ 7.96 | 50 ~ 100 | - | 2 ~ 30 | 5 ~ 60 | 1 ~ 7.96 | - | 1.03 ~ 7.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | G | Powdered high-speed steel | +0.005/0 | 8 | 1 ~ 7.96 | - | 45 ~ 99.9 | 2 ~ 30 | 5 ~ 60 | 1 ~ 7.96 | - | 1.03 ~ 7.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | G | Powdered high-speed steel | +0.005/0 | 10 | 1.25 ~ 9.96 | 50 ~ 100 | - | 2 ~ 30 | 5 ~ 60 | 1.25 ~ 9.96 | - | 1.28 ~ 9.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | G | Powdered high-speed steel | +0.005/0 | 10 | 1.25 ~ 9.96 | - | 45 ~ 99.9 | 2 ~ 30 | 5 ~ 60 | 1.25 ~ 9.96 | - | 1.28 ~ 9.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | G | Powdered high-speed steel | +0.005/0 | 13 | 1.5 ~ 12.96 | 50 ~ 100 | - | 2 ~ 30 | 5 ~ 60 | 1.5 ~ 12.96 | - | 1.53 ~ 12.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | G | Powdered high-speed steel | +0.005/0 | 13 | 1.5 ~ 12.96 | - | 45 ~ 99.9 | 2 ~ 30 | 5 ~ 60 | 1.5 ~ 12.96 | - | 1.53 ~ 12.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | G | Powdered high-speed steel | +0.005/0 | 16 | 2 ~ 15.96 | 50 ~ 100 | - | 2 ~ 30 | 5 ~ 60 | 2 ~ 15.96 | - | 2.03 ~ 15.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | G | Powdered high-speed steel | +0.005/0 | 16 | 2 ~ 15.96 | - | 45 ~ 99.9 | 2 ~ 30 | 5 ~ 60 | 2 ~ 15.96 | - | 2.03 ~ 15.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | G | Powdered high-speed steel | +0.005/0 | 20 | 2.5 ~ 19.96 | 50 ~ 100 | - | 2 ~ 30 | 5 ~ 60 | 2.5 ~ 19.96 | - | 2.53 ~ 19.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | G | Powdered high-speed steel | +0.005/0 | 20 | 2.5 ~ 19.96 | - | 45 ~ 99.9 | 2 ~ 30 | 5 ~ 60 | 2.5 ~ 19.96 | - | 2.53 ~ 19.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | G | Powdered high-speed steel | +0.005/0 | 25 | 3 ~ 24.96 | 50 ~ 100 | - | 2 ~ 30 | 5 ~ 60 | 3 ~ 24.96 | - | 3.03 ~ 24.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | G | Powdered high-speed steel | +0.005/0 | 25 | 3 ~ 24.96 | - | 45 ~ 99.9 | 2 ~ 30 | 5 ~ 60 | 3 ~ 24.96 | - | 3.03 ~ 24.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | R | Powdered high-speed steel | +0.005/0 | 5 | 1 ~ 4.96 | 50 ~ 80 | - | 2 ~ 25 | 5 ~ 45 | 1 ~ 4.96 | 0.15 ~ 2.45 | 1.03 ~ 4.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | R | Powdered high-speed steel | +0.005/0 | 5 | 1 ~ 4.96 | - | 45 ~ 79.9 | 2 ~ 25 | 5 ~ 45 | 1 ~ 4.96 | 0.15 ~ 2.45 | 1.03 ~ 4.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | R | Powdered high-speed steel | +0.005/0 | 6 | 1 ~ 5.96 | 50 ~ 80 | - | 2 ~ 30 | 5 ~ 45 | 1 ~ 5.96 | 0.15 ~ 2.95 | 1.03 ~ 5.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | R | Powdered high-speed steel | +0.005/0 | 6 | 1 ~ 5.96 | - | 45 ~ 79.9 | 2 ~ 30 | 5 ~ 45 | 1 ~ 5.96 | 0.15 ~ 2.95 | 1.03 ~ 5.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | R | Powdered high-speed steel | +0.005/0 | 8 | 1 ~ 7.96 | 50 ~ 100 | - | 2 ~ 30 | 5 ~ 60 | 1 ~ 7.96 | 0.15 ~ 3.97 | 1.03 ~ 7.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | R | Powdered high-speed steel | +0.005/0 | 8 | 1 ~ 7.96 | - | 45 ~ 99.9 | 2 ~ 30 | 5 ~ 60 | 1 ~ 7.96 | 0.15 ~ 3.97 | 1.03 ~ 7.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | R | Powdered high-speed steel | +0.005/0 | 10 | 1.25 ~ 9.96 | 50 ~ 100 | - | 2 ~ 30 | 5 ~ 60 | 1.25 ~ 9.96 | 0.15 ~ 4.97 | 1.28 ~ 9.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | R | Powdered high-speed steel | +0.005/0 | 10 | 1.25 ~ 9.96 | - | 45 ~ 99.9 | 2 ~ 30 | 5 ~ 60 | 1.25 ~ 9.96 | 0.15 ~ 4.97 | 1.28 ~ 9.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | R | Powdered high-speed steel | +0.005/0 | 13 | 1.5 ~ 12.96 | 50 ~ 100 | - | 2 ~ 30 | 5 ~ 60 | 1.5 ~ 12.96 | 0.15 ~ 6.47 | 1.53 ~ 12.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | R | Powdered high-speed steel | +0.005/0 | 13 | 1.5 ~ 12.96 | - | 45 ~ 99.9 | 2 ~ 30 | 5 ~ 60 | 1.5 ~ 12.96 | 0.15 ~ 6.47 | 1.53 ~ 12.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | R | Powdered high-speed steel | +0.005/0 | 16 | 2 ~ 15.96 | 50 ~ 100 | - | 2 ~ 30 | 5 ~ 60 | 2 ~ 15.96 | 0.15 ~ 7.97 | 2.03 ~ 15.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | R | Powdered high-speed steel | +0.005/0 | 16 | 2 ~ 15.96 | - | 45 ~ 99.9 | 2 ~ 30 | 5 ~ 60 | 2 ~ 15.96 | 0.15 ~ 7.97 | 2.03 ~ 15.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | R | Powdered high-speed steel | +0.005/0 | 20 | 2.5 ~ 19.96 | 50 ~ 100 | - | 2 ~ 30 | 5 ~ 60 | 2.5 ~ 19.96 | 0.15 ~ 9.97 | 2.53 ~ 19.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | R | Powdered high-speed steel | +0.005/0 | 20 | 2.5 ~ 19.96 | - | 45 ~ 99.9 | 2 ~ 30 | 5 ~ 60 | 2.5 ~ 19.96 | 0.15 ~ 9.97 | 2.53 ~ 19.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | R | Powdered high-speed steel | +0.005/0 | 25 | 3 ~ 24.96 | 50 ~ 100 | - | 2 ~ 30 | 5 ~ 60 | 3 ~ 24.96 | 0.15 ~ 12.47 | 3.03 ~ 24.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 5 Day(s) | 10 | R | Powdered high-speed steel | +0.005/0 | 25 | 3 ~ 24.96 | - | 45 ~ 99.9 | 2 ~ 30 | 5 ~ 60 | 3 ~ 24.96 | 0.15 ~ 12.47 | 3.03 ~ 24.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 4 Day(s) | 10 | A | SKH51 Equivalent | +0.005/0 | 5 | 1.5 ~ 4.98 | 50 ~ 80 | - | 2 ~ 40 | 5 ~ 45 | - | - | 1.51 ~ 4.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 4 Day(s) | 10 | A | SKH51 Equivalent | +0.005/0 | 5 | 1.5 ~ 4.98 | - | 45 ~ 79.9 | 2 ~ 40 | 5 ~ 45 | - | - | 1.51 ~ 4.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 4 Day(s) | 10 | A | SKH51 Equivalent | +0.005/0 | 6 | 1.5 ~ 5.98 | 50 ~ 80 | - | 2 ~ 40 | 5 ~ 45 | - | - | 2.01 ~ 5.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 4 Day(s) | 10 | A | SKH51 Equivalent | +0.005/0 | 6 | 1.5 ~ 5.98 | - | 45 ~ 79.9 | 2 ~ 40 | 5 ~ 45 | - | - | 2.01 ~ 5.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 4 Day(s) | 10 | A | SKH51 Equivalent | +0.005/0 | 8 | 1.5 ~ 7.98 | 50 ~ 100 | - | 2 ~ 60 | 5 ~ 60 | - | - | 1.51 ~ 7.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 4 Day(s) | 10 | A | SKH51 Equivalent | +0.005/0 | 8 | 1.5 ~ 7.98 | - | 45 ~ 99.9 | 2 ~ 60 | 5 ~ 60 | - | - | 1.51 ~ 7.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 4 Day(s) | 10 | A | SKH51 Equivalent | +0.005/0 | 10 | 1.5 ~ 9.98 | 50 ~ 100 | - | 2 ~ 60 | 5 ~ 60 | - | - | 1.51 ~ 9.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 4 Day(s) | 10 | A | SKH51 Equivalent | +0.005/0 | 10 | 1.5 ~ 9.98 | - | 45 ~ 99.9 | 2 ~ 60 | 5 ~ 60 | - | - | 1.51 ~ 9.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 4 Day(s) | 10 | A | SKH51 Equivalent | +0.005/0 | 13 | 3 ~ 12.98 | 50 ~ 100 | - | 2 ~ 60 | 5 ~ 60 | - | - | 3.01 ~ 12.99 | ||
- | PUNCHES FOR HEAVY LOAD -TICN | 1 Piece(s) | 4 Day(s) | 10 | A | SKH51 Equivalent | +0.005/0 | 13 | 3 ~ 12.98 | - | 45 ~ 99.9 | 2 ~ 60 | 5 ~ 60 | - | - | 3.01 ~ 12.99 |
Loading...
Heavy-load punches | Yes | Shank type | Double-stepped | Jector | None |
---|---|---|---|---|---|
Surface treatment | TiCN | Shank (mounting part) shape | Standard | T (Head thickness/plate thickness)(mm) | 8 |
How can we improve?
How can we improve?