(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
A punch with a carbide keyway and air hole that has air holes in the fixing keyway and shank. It has a TiCN coating that improves wear resistance. The material is carbide (V30) and ultrafine particle carbide (HIP). Shank diameter tolerance can be selected from -0.001/-0.006.
Part Number |
---|
BH-WJKAL4-[50-70/10]-P[1.5-3.99/0.01]-T[5-70/0.1] |
BH-WJKAL4-LC[39-59.9/0.1]-P[1.5-3.99/0.01]-T[5-70/0.1] |
BH-WJKAL4-LCX[39-59.9/0.1]-P[1.5-3.99/0.01]-T[5-70/0.1] |
BH-WJKAL5-[50-70/10]-P[2-4.99/0.01]-T[5-70/0.1] |
BH-WJKAL5-[50-70/10]-PC[1.8-1.99/0.01]-T[5-70/0.1] |
BH-WJKAL5-LC[39-69.9/0.1]-P[2-4.99/0.01]-T[5-70/0.1] |
BH-WJKAL5-LC[39-69.9/0.1]-PC[1.8-1.99/0.01]-T[5-70/0.1] |
BH-WJKAL5-LCX[39-69.9/0.1]-P[2-4.99/0.01]-T[5-70/0.1] |
BH-WJKAL5-LCX[39-69.9/0.1]-PC[1.8-1.99/0.01]-T[5-70/0.1] |
BH-WJKAL6-[50-70/10]-P[2-5.99/0.01]-T[5-70/0.1] |
BH-WJKAL6-[50-70/10]-PC[1.8-1.99/0.01]-T[5-70/0.1] |
BH-WJKAL6-LC[39-69.9/0.1]-P[2-5.99/0.01]-T[5-70/0.1] |
BH-WJKAL6-LC[39-69.9/0.1]-PC[1.8-1.99/0.01]-T[5-70/0.1] |
BH-WJKAL6-LCX[39-69.9/0.1]-P[2-5.99/0.01]-T[5-70/0.1] |
BH-WJKAL6-LCX[39-69.9/0.1]-PC[1.8-1.99/0.01]-T[5-70/0.1] |
BH-WJKAL8-[50-80/10]-P[3-7.99/0.01]-T[5-80/0.1] |
BH-WJKAL8-[50-80/10]-PC[2.3-2.99/0.01]-T[5-80/0.1] |
BH-WJKAL8-LC[33-79.9/0.1]-P[3-7.99/0.01]-T[5-80/0.1] |
BH-WJKAL8-LC[33-79.9/0.1]-PC[2.3-2.99/0.01]-T[5-80/0.1] |
BH-WJKAL8-LCX[33-79.9/0.1]-P[3-7.99/0.01]-T[5-80/0.1] |
BH-WJKAL8-LCX[33-79.9/0.1]-PC[2.3-2.99/0.01]-T[5-80/0.1] |
BH-WJKAL10-[50-80/10]-P[3-9.99/0.01]-T[5-80/0.1] |
BH-WJKAL10-[50-80/10]-PC[2.8-2.99/0.01]-T[5-80/0.1] |
BH-WJKAL10-LC[33-79.9/0.1]-P[3-9.99/0.01]-T[5-80/0.1] |
BH-WJKAL10-LC[33-79.9/0.1]-PC[2.8-2.99/0.01]-T[5-80/0.1] |
BH-WJKAL10-LCX[33-79.9/0.1]-P[3-9.99/0.01]-T[5-80/0.1] |
BH-WJKAL10-LCX[33-79.9/0.1]-PC[2.8-2.99/0.01]-T[5-80/0.1] |
BH-WJKAL13-[50-80/10]-P[6-12.99/0.01]-T[5-80/0.1] |
BH-WJKAL13-[50-80/10]-PC[5-5.99/0.01]-T[5-80/0.1] |
BH-WJKAL13-LC[33-79.9/0.1]-P[6-12.99/0.01]-T[5-80/0.1] |
BH-WJKAL13-LC[33-79.9/0.1]-PC[5-5.99/0.01]-T[5-80/0.1] |
BH-WJKAL13-LCX[33-79.9/0.1]-P[6-12.99/0.01]-T[5-80/0.1] |
BH-WJKAL13-LCX[33-79.9/0.1]-PC[5-5.99/0.01]-T[5-80/0.1] |
BH-WJKAL16-[60-80/10]-P[10-15.99/0.01]-T[5-80/0.1] |
BH-WJKAL16-[60-80/10]-PC[8-9.99/0.01]-T[5-80/0.1] |
BH-WJKAL16-LC[37-79.9/0.1]-P[10-15.99/0.01]-T[5-80/0.1] |
BH-WJKAL16-LC[37-79.9/0.1]-PC[8-9.99/0.01]-T[5-80/0.1] |
BH-WJKAL16-LCX[37-79.9/0.1]-P[10-15.99/0.01]-T[5-80/0.1] |
BH-WJKAL16-LCX[37-79.9/0.1]-PC[8-9.99/0.01]-T[5-80/0.1] |
BH-WJKAS4-[40-70/10]-P[1.5-3.99/0.01]-T[5-70/0.1] |
BH-WJKAS4-LC[34-69.9/0.1]-P[1.5-3.99/0.01]-T[5-70/0.1] |
BH-WJKAS4-LCX[34-69.9/0.1]-P[1.5-3.99/0.01]-T[5-70/0.1] |
BH-WJKAS5-[40-70/10]-P[2-4.99/0.01]-T[5-70/0.1] |
BH-WJKAS5-[40-70/10]-PC[1.8-1.99/0.01]-T[5-70/0.1] |
BH-WJKAS5-LC[34-69.9/0.1]-P[2-4.99/0.01]-T[5-70/0.1] |
BH-WJKAS5-LC[34-69.9/0.1]-PC[1.8-1.99/0.01]-T[5-70/0.1] |
BH-WJKAS5-LCX[34-69.9/0.1]-P[2-4.99/0.01]-T[5-70/0.1] |
BH-WJKAS5-LCX[34-69.9/0.1]-PC[1.8-1.99/0.01]-T[5-70/0.1] |
BH-WJKAS6-[40-70/10]-P[2-5.99/0.01]-T[5-70/0.1] |
BH-WJKAS6-[40-70/10]-PC[1.8-1.99/0.01]-T[5-70/0.1] |
BH-WJKAS6-LC[34-69.9/0.1]-P[2-5.99/0.01]-T[5-70/0.1] |
BH-WJKAS6-LC[34-69.9/0.1]-PC[1.8-1.99/0.01]-T[5-70/0.1] |
BH-WJKAS6-LCX[34-69.9/0.1]-P[2-5.99/0.01]-T[5-70/0.1] |
BH-WJKAS6-LCX[34-69.9/0.1]-PC[1.8-1.99/0.01]-T[5-70/0.1] |
BH-WJKAS8-[40-80/10]-P[3-7.99/0.01]-T[5-80/0.1] |
BH-WJKAS8-[40-80/10]-PC[2.3-2.99/0.01]-T[5-80/0.1] |
BH-WJKAS8-LC[34-79.9/0.1]-P[3-7.99/0.01]-T[5-80/0.1] |
BH-WJKAS8-LC[34-79.9/0.1]-PC[2.3-2.99/0.01]-T[5-80/0.1] |
BH-WJKAS8-LCX[34-79.9/0.1]-P[3-7.99/0.01]-T[5-80/0.1] |
BH-WJKAS8-LCX[34-79.9/0.1]-PC[2.3-2.99/0.01]-T[5-80/0.1] |
BH-WJKAS10-[40-80/10]-P[3-9.99/0.01]-T[5-80/0.1] |
BH-WJKAS10-[40-80/10]-PC[2.8-2.99/0.01]-T[5-80/0.1] |
BH-WJKAS10-LC[34-79.9/0.1]-P[3-9.99/0.01]-T[5-80/0.1] |
BH-WJKAS10-LC[34-79.9/0.1]-PC[2.8-2.99/0.01]-T[5-80/0.1] |
BH-WJKAS10-LCX[34-79.9/0.1]-P[3-9.99/0.01]-T[5-80/0.1] |
BH-WJKAS10-LCX[34-79.9/0.1]-PC[2.8-2.99/0.01]-T[5-80/0.1] |
BH-WJKAS13-[40-80/10]-P[6-12.99/0.01]-T[5-80/0.1] |
BH-WJKAS13-[40-80/10]-PC[5-5.99/0.01]-T[5-80/0.1] |
BH-WJKAS13-LC[34-79.9/0.1]-P[6-12.99/0.01]-T[5-80/0.1] |
BH-WJKAS13-LC[34-79.9/0.1]-PC[5-5.99/0.01]-T[5-80/0.1] |
BH-WJKAS13-LCX[34-79.9/0.1]-P[6-12.99/0.01]-T[5-80/0.1] |
BH-WJKAS13-LCX[34-79.9/0.1]-PC[5-5.99/0.01]-T[5-80/0.1] |
BH-WJKAS16-[40-80/10]-P[10-15.99/0.01]-T[5-80/0.1] |
BH-WJKAS16-[40-80/10]-PC[8-9.99/0.01]-T[5-80/0.1] |
BH-WJKAS16-LC[34-79.9/0.1]-P[10-15.99/0.01]-T[5-80/0.1] |
BH-WJKAS16-LC[34-79.9/0.1]-PC[8-9.99/0.01]-T[5-80/0.1] |
BH-WJKAS16-LCX[34-79.9/0.1]-P[10-15.99/0.01]-T[5-80/0.1] |
BH-WJKAS16-LCX[34-79.9/0.1]-PC[8-9.99/0.01]-T[5-80/0.1] |
BH-WXJKAL4-[50-70/10]-P[1.5-3.99/0.01]-T[5-70/0.1] |
BH-WXJKAL4-LC[39-59.9/0.1]-P[1.5-3.99/0.01]-T[5-70/0.1] |
BH-WXJKAL4-LCX[39-59.9/0.1]-P[1.5-3.99/0.01]-T[5-70/0.1] |
BH-WXJKAL5-[50-70/10]-P[2-4.99/0.01]-T[5-70/0.1] |
BH-WXJKAL5-[50-70/10]-PC[1.8-1.99/0.01]-T[5-70/0.1] |
BH-WXJKAL5-LC[39-69.9/0.1]-P[2-4.99/0.01]-T[5-70/0.1] |
BH-WXJKAL5-LC[39-69.9/0.1]-PC[1.8-1.99/0.01]-T[5-70/0.1] |
BH-WXJKAL5-LCX[39-69.9/0.1]-P[2-4.99/0.01]-T[5-70/0.1] |
BH-WXJKAL5-LCX[39-69.9/0.1]-PC[1.8-1.99/0.01]-T[5-70/0.1] |
BH-WXJKAL6-[50-70/10]-P[2-5.99/0.01]-T[5-70/0.1] |
BH-WXJKAL6-[50-70/10]-PC[1.8-1.99/0.01]-T[5-70/0.1] |
BH-WXJKAL6-LC[39-69.9/0.1]-P[2-5.99/0.01]-T[5-70/0.1] |
Part Number | Price | Name | Minimum Order Qty. | Volume Discount | Days to Ship | RoHS | Material | Tip length | D (Shank diameter) (mm) | L (L dimension) (mm) | LC (Full length alteration) (mm) | LCX (Full length change with no change to tip length B) (mm) | P (Tip dimension) (mm) | PC (Tip dimension alteration) (mm) | T (Key groove position) (mm) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | L | 4 | 50 ~ 70 | - | - | 1.5 ~ 3.99 | - | 5 ~ 70 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | L | 4 | - | 39 ~ 59.9 | - | 1.5 ~ 3.99 | - | 5 ~ 70 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | L | 4 | - | - | 39 ~ 59.9 | 1.5 ~ 3.99 | - | 5 ~ 70 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | L | 5 | 50 ~ 70 | - | - | 2 ~ 4.99 | - | 5 ~ 70 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | L | 5 | 50 ~ 70 | - | - | - | 1.8 ~ 1.99 | 5 ~ 70 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | L | 5 | - | 39 ~ 69.9 | - | 2 ~ 4.99 | - | 5 ~ 70 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | L | 5 | - | 39 ~ 69.9 | - | - | 1.8 ~ 1.99 | 5 ~ 70 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | L | 5 | - | - | 39 ~ 69.9 | 2 ~ 4.99 | - | 5 ~ 70 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | L | 5 | - | - | 39 ~ 69.9 | - | 1.8 ~ 1.99 | 5 ~ 70 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | L | 6 | 50 ~ 70 | - | - | 2 ~ 5.99 | - | 5 ~ 70 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | L | 6 | 50 ~ 70 | - | - | - | 1.8 ~ 1.99 | 5 ~ 70 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | L | 6 | - | 39 ~ 69.9 | - | 2 ~ 5.99 | - | 5 ~ 70 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | L | 6 | - | 39 ~ 69.9 | - | - | 1.8 ~ 1.99 | 5 ~ 70 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | L | 6 | - | - | 39 ~ 69.9 | 2 ~ 5.99 | - | 5 ~ 70 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | L | 6 | - | - | 39 ~ 69.9 | - | 1.8 ~ 1.99 | 5 ~ 70 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | L | 8 | 50 ~ 80 | - | - | 3 ~ 7.99 | - | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | L | 8 | 50 ~ 80 | - | - | - | 2.3 ~ 2.99 | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | L | 8 | - | 33 ~ 79.9 | - | 3 ~ 7.99 | - | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | L | 8 | - | 33 ~ 79.9 | - | - | 2.3 ~ 2.99 | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | L | 8 | - | - | 33 ~ 79.9 | 3 ~ 7.99 | - | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | L | 8 | - | - | 33 ~ 79.9 | - | 2.3 ~ 2.99 | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | L | 10 | 50 ~ 80 | - | - | 3 ~ 9.99 | - | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | L | 10 | 50 ~ 80 | - | - | - | 2.8 ~ 2.99 | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | L | 10 | - | 33 ~ 79.9 | - | 3 ~ 9.99 | - | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | L | 10 | - | 33 ~ 79.9 | - | - | 2.8 ~ 2.99 | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | L | 10 | - | - | 33 ~ 79.9 | 3 ~ 9.99 | - | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | L | 10 | - | - | 33 ~ 79.9 | - | 2.8 ~ 2.99 | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | L | 13 | 50 ~ 80 | - | - | 6 ~ 12.99 | - | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | L | 13 | 50 ~ 80 | - | - | - | 5 ~ 5.99 | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | L | 13 | - | 33 ~ 79.9 | - | 6 ~ 12.99 | - | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | L | 13 | - | 33 ~ 79.9 | - | - | 5 ~ 5.99 | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | L | 13 | - | - | 33 ~ 79.9 | 6 ~ 12.99 | - | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | L | 13 | - | - | 33 ~ 79.9 | - | 5 ~ 5.99 | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | L | 16 | 60 ~ 80 | - | - | 10 ~ 15.99 | - | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | L | 16 | 60 ~ 80 | - | - | - | 8 ~ 9.99 | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | L | 16 | - | 37 ~ 79.9 | - | 10 ~ 15.99 | - | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | L | 16 | - | 37 ~ 79.9 | - | - | 8 ~ 9.99 | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | L | 16 | - | - | 37 ~ 79.9 | 10 ~ 15.99 | - | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | L | 16 | - | - | 37 ~ 79.9 | - | 8 ~ 9.99 | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | S | 4 | 40 ~ 70 | - | - | 1.5 ~ 3.99 | - | 5 ~ 70 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | S | 4 | - | 34 ~ 69.9 | - | 1.5 ~ 3.99 | - | 5 ~ 70 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | S | 4 | - | - | 34 ~ 69.9 | 1.5 ~ 3.99 | - | 5 ~ 70 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | S | 5 | 40 ~ 70 | - | - | 2 ~ 4.99 | - | 5 ~ 70 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | S | 5 | 40 ~ 70 | - | - | - | 1.8 ~ 1.99 | 5 ~ 70 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | S | 5 | - | 34 ~ 69.9 | - | 2 ~ 4.99 | - | 5 ~ 70 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | S | 5 | - | 34 ~ 69.9 | - | - | 1.8 ~ 1.99 | 5 ~ 70 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | S | 5 | - | - | 34 ~ 69.9 | 2 ~ 4.99 | - | 5 ~ 70 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | S | 5 | - | - | 34 ~ 69.9 | - | 1.8 ~ 1.99 | 5 ~ 70 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | S | 6 | 40 ~ 70 | - | - | 2 ~ 5.99 | - | 5 ~ 70 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | S | 6 | 40 ~ 70 | - | - | - | 1.8 ~ 1.99 | 5 ~ 70 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | S | 6 | - | 34 ~ 69.9 | - | 2 ~ 5.99 | - | 5 ~ 70 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | S | 6 | - | 34 ~ 69.9 | - | - | 1.8 ~ 1.99 | 5 ~ 70 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | S | 6 | - | - | 34 ~ 69.9 | 2 ~ 5.99 | - | 5 ~ 70 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | S | 6 | - | - | 34 ~ 69.9 | - | 1.8 ~ 1.99 | 5 ~ 70 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | S | 8 | 40 ~ 80 | - | - | 3 ~ 7.99 | - | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | S | 8 | 40 ~ 80 | - | - | - | 2.3 ~ 2.99 | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | S | 8 | - | 34 ~ 79.9 | - | 3 ~ 7.99 | - | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | S | 8 | - | 34 ~ 79.9 | - | - | 2.3 ~ 2.99 | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | S | 8 | - | - | 34 ~ 79.9 | 3 ~ 7.99 | - | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | S | 8 | - | - | 34 ~ 79.9 | - | 2.3 ~ 2.99 | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | S | 10 | 40 ~ 80 | - | - | 3 ~ 9.99 | - | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | S | 10 | 40 ~ 80 | - | - | - | 2.8 ~ 2.99 | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | S | 10 | - | 34 ~ 79.9 | - | 3 ~ 9.99 | - | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | S | 10 | - | 34 ~ 79.9 | - | - | 2.8 ~ 2.99 | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | S | 10 | - | - | 34 ~ 79.9 | 3 ~ 9.99 | - | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | S | 10 | - | - | 34 ~ 79.9 | - | 2.8 ~ 2.99 | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | S | 13 | 40 ~ 80 | - | - | 6 ~ 12.99 | - | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | S | 13 | 40 ~ 80 | - | - | - | 5 ~ 5.99 | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | S | 13 | - | 34 ~ 79.9 | - | 6 ~ 12.99 | - | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | S | 13 | - | 34 ~ 79.9 | - | - | 5 ~ 5.99 | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | S | 13 | - | - | 34 ~ 79.9 | 6 ~ 12.99 | - | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | S | 13 | - | - | 34 ~ 79.9 | - | 5 ~ 5.99 | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | S | 16 | 40 ~ 80 | - | - | 10 ~ 15.99 | - | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | S | 16 | 40 ~ 80 | - | - | - | 8 ~ 9.99 | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | S | 16 | - | 34 ~ 79.9 | - | 10 ~ 15.99 | - | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | S | 16 | - | 34 ~ 79.9 | - | - | 8 ~ 9.99 | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | S | 16 | - | - | 34 ~ 79.9 | 10 ~ 15.99 | - | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide V30 (HIP) | S | 16 | - | - | 34 ~ 79.9 | - | 8 ~ 9.99 | 5 ~ 80 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide super fine grain (HIP) | L | 4 | 50 ~ 70 | - | - | 1.5 ~ 3.99 | - | 5 ~ 70 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide super fine grain (HIP) | L | 4 | - | 39 ~ 59.9 | - | 1.5 ~ 3.99 | - | 5 ~ 70 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide super fine grain (HIP) | L | 4 | - | - | 39 ~ 59.9 | 1.5 ~ 3.99 | - | 5 ~ 70 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide super fine grain (HIP) | L | 5 | 50 ~ 70 | - | - | 2 ~ 4.99 | - | 5 ~ 70 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide super fine grain (HIP) | L | 5 | 50 ~ 70 | - | - | - | 1.8 ~ 1.99 | 5 ~ 70 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide super fine grain (HIP) | L | 5 | - | 39 ~ 69.9 | - | 2 ~ 4.99 | - | 5 ~ 70 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide super fine grain (HIP) | L | 5 | - | 39 ~ 69.9 | - | - | 1.8 ~ 1.99 | 5 ~ 70 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide super fine grain (HIP) | L | 5 | - | - | 39 ~ 69.9 | 2 ~ 4.99 | - | 5 ~ 70 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide super fine grain (HIP) | L | 5 | - | - | 39 ~ 69.9 | - | 1.8 ~ 1.99 | 5 ~ 70 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide super fine grain (HIP) | L | 6 | 50 ~ 70 | - | - | 2 ~ 5.99 | - | 5 ~ 70 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide super fine grain (HIP) | L | 6 | 50 ~ 70 | - | - | - | 1.8 ~ 1.99 | 5 ~ 70 | ||
- | CARBIDE PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Carbide super fine grain (HIP) | L | 6 | - | 39 ~ 69.9 | - | 2 ~ 5.99 | - | 5 ~ 70 |
Loading...
Tip shapes | One-step | Jector | With air hole | Tip shape | A |
---|---|---|---|---|---|
Surface treatment | TiCN | Shank (mounting part) shape | With key groove | Shank diameter D tolerance | -0.001/-0.006 |
How can we improve?
How can we improve?