(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
A precision grade (coaxiality 0.005, roundness 0.003) collar stopper punch with a collar stopper on the mounting part to prevent the punch from slipping out. Materials can be selected from die steel and powdered high speed steel. You can choose between normal type and lap finish.
Part Number |
---|
L-VPHTAL4-P[0.5-2/0.001]-T[13,16,20,25]-B[2-6/1] |
L-VPHTAL4-P[0.5-2/0.001]-TC[13.1-24.9/0.1]-B[2-6/1] |
L-VPHTAL5-[40-60/10]-P[1-3/0.001]-B[2-8/1]-B[2-8/1] |
L-VPHTAL5-[40-60/10]-P[1-3/0.001]-T[13,16,20,25]-B[2-8/1] |
L-VPHTAL5-[40-60/10]-P[1-3/0.001]-TC[13.1-24.9/0.1]-B[2-8/1] |
L-VPHTAL5-[40-60/10]-T[13,16,20,25]-B[2-8/1]-B[2-8/1] |
L-VPHTAL5-[40-60/10]-T[13,16,20,25]-T[13,16,20,25]-B[2-8/1] |
L-VPHTAL5-[40-60/10]-T[13,16,20,25]-TC[13.1-24.9/0.1]-B[2-8/1] |
L-VPHTAL5-[40-60/10]-TC[13.1-24.9/0.1]-B[2-8/1]-B[2-8/1] |
L-VPHTAL5-[40-60/10]-TC[13.1-24.9/0.1]-T[13,16,20,25]-B[2-8/1] |
L-VPHTAL5-[40-60/10]-TC[13.1-24.9/0.1]-TC[13.1-24.9/0.1]-B[2-8/1] |
L-VPHTAL5-LC[40.1-49.9/0.1]-P[1-3/0.001]-B[2-8/1]-B[2-8/1] |
L-VPHTAL5-LC[40.1-49.9/0.1]-P[1-3/0.001]-T[13,16,20,25]-B[2-8/1] |
L-VPHTAL5-LC[40.1-49.9/0.1]-P[1-3/0.001]-TC[13.1-24.9/0.1]-B[2-8/1] |
L-VPHTAL5-LC[40.1-49.9/0.1]-T[13,16,20,25]-B[2-8/1]-B[2-8/1] |
L-VPHTAL5-LC[40.1-49.9/0.1]-T[13,16,20,25]-T[13,16,20,25]-B[2-8/1] |
L-VPHTAL5-LC[40.1-49.9/0.1]-T[13,16,20,25]-TC[13.1-24.9/0.1]-B[2-8/1] |
L-VPHTAL5-LC[40.1-49.9/0.1]-TC[13.1-24.9/0.1]-B[2-8/1]-B[2-8/1] |
L-VPHTAL5-LC[40.1-49.9/0.1]-TC[13.1-24.9/0.1]-T[13,16,20,25]-B[2-8/1] |
L-VPHTAL5-LC[40.1-49.9/0.1]-TC[13.1-24.9/0.1]-TC[13.1-24.9/0.1]-B[2-8/1] |
L-VPHTAL5-LC[50.1-59.9/0.1]-P[1-3/0.001]-B[2-8/1]-B[2-8/1] |
L-VPHTAL5-LC[50.1-59.9/0.1]-P[1-3/0.001]-T[13,16,20,25]-B[2-8/1] |
L-VPHTAL5-LC[50.1-59.9/0.1]-P[1-3/0.001]-TC[13.1-24.9/0.1]-B[2-8/1] |
L-VPHTAL5-LC[50.1-59.9/0.1]-T[13,16,20,25]-B[2-8/1]-B[2-8/1] |
L-VPHTAL5-LC[50.1-59.9/0.1]-T[13,16,20,25]-T[13,16,20,25]-B[2-8/1] |
L-VPHTAL5-LC[50.1-59.9/0.1]-T[13,16,20,25]-TC[13.1-24.9/0.1]-B[2-8/1] |
L-VPHTAL5-LC[50.1-59.9/0.1]-TC[13.1-24.9/0.1]-B[2-8/1]-B[2-8/1] |
L-VPHTAL5-LC[50.1-59.9/0.1]-TC[13.1-24.9/0.1]-T[13,16,20,25]-B[2-8/1] |
L-VPHTAL5-LC[50.1-59.9/0.1]-TC[13.1-24.9/0.1]-TC[13.1-24.9/0.1]-B[2-8/1] |
L-VPHTAL5-P[1-3/0.001]-P[1-3/0.001]-B[2-8/1]-B[2-8/1] |
L-VPHTAL5-P[1-3/0.001]-P[1-3/0.001]-T[13,16,20,25]-B[2-8/1] |
L-VPHTAL5-P[1-3/0.001]-P[1-3/0.001]-TC[13.1-24.9/0.1]-B[2-8/1] |
L-VPHTAL5-P[1-3/0.001]-T[13,16,20,25]-B[2-8/1]-B[2-8/1] |
L-VPHTAL5-P[1-3/0.001]-T[13,16,20,25]-T[13,16,20,25]-B[2-8/1] |
L-VPHTAL5-P[1-3/0.001]-T[13,16,20,25]-TC[13.1-24.9/0.1]-B[2-8/1] |
L-VPHTAL5-P[1-3/0.001]-TC[13.1-24.9/0.1]-B[2-8/1]-B[2-8/1] |
L-VPHTAL5-P[1-3/0.001]-TC[13.1-24.9/0.1]-T[13,16,20,25]-B[2-8/1] |
L-VPHTAL5-P[1-3/0.001]-TC[13.1-24.9/0.1]-TC[13.1-24.9/0.1]-B[2-8/1] |
L-VPHTAL6-LC[40.1-49.9/0.1]-T[13,16,20,25]-B[2-13/1] |
L-VPHTAL6-LC[40.1-49.9/0.1]-TC[13.1-24.9/0.1]-B[2-13/1] |
L-VPHTAL6-LC[50.1-69.9/0.1]-T[13,16,20,25]-B[2-13/1] |
L-VPHTAL6-LC[50.1-69.9/0.1]-TC[13.1-24.9/0.1]-B[2-13/1] |
L-VPHTAL6-P[1.5-4/0.001]-T[13,16,20,25]-B[2-13/1] |
L-VPHTAL6-P[1.5-4/0.001]-TC[13.1-24.9/0.1]-B[2-13/1] |
L-VPHTAL8-P[2-6/0.001]-T[13,16,20,25]-B[2-13/1] |
L-VPHTAL8-P[2-6/0.001]-TC[13.1-24.9/0.1]-B[2-13/1] |
L-VSPTAL4-P[0.5-2/0.001]-T[13,16,20,25]-B[2-6/1] |
L-VSPTAL4-P[0.5-2/0.001]-TC[13.1-24.9/0.1]-B[2-6/1] |
L-VSPTAL5-P[1-3/0.001]-T[13,16,20,25]-B[2-8/1] |
L-VSPTAL5-P[1-3/0.001]-TC[13.1-24.9/0.1]-B[2-8/1] |
L-VSPTAL6-P[1.5-4/0.001]-T[13,16,20,25]-B[2-13/1] |
L-VSPTAL6-P[1.5-4/0.001]-TC[13.1-24.9/0.1]-B[2-13/1] |
L-VSPTAL8-P[2-6/0.001]-T[13,16,20,25]-B[2-13/1] |
L-VSPTAL8-P[2-6/0.001]-TC[13.1-24.9/0.1]-B[2-13/1] |
VPHTAL4-[40-50/10]-P[0.5-2/0.001]-T[13,16,20,25]-B[2-6/1] |
VPHTAL4-[40-50/10]-P[0.5-2/0.001]-TC[13.1-24.9/0.1]-B[2-6/1] |
VPHTAL4-LC[40.1-49.9/0.1]-P[0.5-2/0.001]-T[13,16,20,25]-B[2-6/1] |
VPHTAL4-LC[40.1-49.9/0.1]-P[0.5-2/0.001]-TC[13.1-24.9/0.1]-B[2-6/1] |
VPHTAL5-[40-60/10]-P[1-3/0.001]-T[13,16,20,25]-B[2-8/1] |
VPHTAL5-[40-60/10]-P[1-3/0.001]-TC[13.1-24.9/0.1]-B[2-8/1] |
VPHTAL5-LC[40.1-49.9/0.1]-P[1-3/0.001]-T[13,16,20,25]-B[2-8/1] |
VPHTAL5-LC[40.1-49.9/0.1]-P[1-3/0.001]-TC[13.1-24.9/0.1]-B[2-8/1] |
VPHTAL5-LC[50.1-59.9/0.1]-P[1-3/0.001]-T[13,16,20,25]-B[2-8/1] |
VPHTAL5-LC[50.1-59.9/0.1]-P[1-3/0.001]-TC[13.1-24.9/0.1]-B[2-8/1] |
VPHTAL6-[40-70/10]-P[1.5-4/0.001]-T[13,16,20,25]-B[2-13/1] |
VPHTAL6-[40-70/10]-P[1.5-4/0.001]-TC[13.1-24.9/0.1]-B[2-13/1] |
VPHTAL6-LC[40.1-49.9/0.1]-P[1.5-4/0.001]-T[13,16,20,25]-B[2-13/1] |
VPHTAL6-LC[40.1-49.9/0.1]-P[1.5-4/0.001]-TC[13.1-24.9/0.1]-B[2-13/1] |
VPHTAL6-LC[50.1-69.9/0.1]-P[1.5-4/0.001]-T[13,16,20,25]-B[2-13/1] |
VPHTAL6-LC[50.1-69.9/0.1]-P[1.5-4/0.001]-TC[13.1-24.9/0.1]-B[2-13/1] |
VPHTAL8-[40-70/10]-P[2-6/0.001]-T[13,16,20,25]-B[2-13/1] |
VPHTAL8-[40-70/10]-P[2-6/0.001]-TC[13.1-24.9/0.1]-B[2-13/1] |
VPHTAL8-LC[40.1-49.9/0.1]-P[2-6/0.001]-T[13,16,20,25]-B[2-13/1] |
VPHTAL8-LC[40.1-49.9/0.1]-P[2-6/0.001]-TC[13.1-24.9/0.1]-B[2-13/1] |
VPHTAL8-LC[50.1-69.9/0.1]-P[2-6/0.001]-T[13,16,20,25]-B[2-13/1] |
VPHTAL8-LC[50.1-69.9/0.1]-P[2-6/0.001]-TC[13.1-24.9/0.1]-B[2-13/1] |
VSPTAL4-[40-50/10]-P[0.5-2/0.001]-T[13,16,20,25]-B[2-6/1] |
VSPTAL4-[40-50/10]-P[0.5-2/0.001]-TC[13.1-24.9/0.1]-B[2-6/1] |
VSPTAL4-LC[40.1-49.9/0.1]-P[0.5-2/0.001]-T[13,16,20,25]-B[2-6/1] |
VSPTAL4-LC[40.1-49.9/0.1]-P[0.5-2/0.001]-TC[13.1-24.9/0.1]-B[2-6/1] |
VSPTAL5-[40-60/10]-P[1-3/0.001]-T[13,16,20,25]-B[2-8/1] |
VSPTAL5-[40-60/10]-P[1-3/0.001]-TC[13.1-24.9/0.1]-B[2-8/1] |
VSPTAL5-LC[40.1-49.9/0.1]-P[1-3/0.001]-T[13,16,20,25]-B[2-8/1] |
VSPTAL5-LC[40.1-49.9/0.1]-P[1-3/0.001]-TC[13.1-24.9/0.1]-B[2-8/1] |
VSPTAL5-LC[50.1-59.9/0.1]-P[1-3/0.001]-T[13,16,20,25]-B[2-8/1] |
VSPTAL5-LC[50.1-59.9/0.1]-P[1-3/0.001]-TC[13.1-24.9/0.1]-B[2-8/1] |
VSPTAL6-[40-70/10]-P[1.5-4/0.001]-T[13,16,20,25]-B[2-13/1] |
VSPTAL6-[40-70/10]-P[1.5-4/0.001]-TC[13.1-24.9/0.1]-B[2-13/1] |
VSPTAL6-LC[40.1-49.9/0.1]-P[1.5-4/0.001]-T[13,16,20,25]-B[2-13/1] |
VSPTAL6-LC[40.1-49.9/0.1]-P[1.5-4/0.001]-TC[13.1-24.9/0.1]-B[2-13/1] |
Part Number | Price | Name | Minimum Order Qty. | Volume Discount | Days to Ship | RoHS | Material | With/without lapping finish | D (Shank diameter) (mm) | B (Tip length) (mm) | L (L dimension) (mm) | LC (Full length alteration) (mm) | P (Tip dimension) (mm) | T (Head length) (mm) | T dimension alteration [TC] (mm) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 4 | 2 ~ 6 | - | - | 0.5 ~ 2 | 13 ~ 25 | - | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 4 | 2 ~ 6 | - | - | 0.5 ~ 2 | - | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 5 | 2 ~ 8 | 40 ~ 60 | - | 1 ~ 3 | - | - | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 5 | 2 ~ 8 | 40 ~ 60 | - | 1 ~ 3 | 13 ~ 25 | - | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 5 | 2 ~ 8 | 40 ~ 60 | - | 1 ~ 3 | - | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 5 | 2 ~ 8 | 40 ~ 60 | - | - | 13 ~ 25 | - | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 5 | 2 ~ 8 | 40 ~ 60 | - | - | 13 ~ 25 | - | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 5 | 2 ~ 8 | 40 ~ 60 | - | - | 13 ~ 25 | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 5 | 2 ~ 8 | 40 ~ 60 | - | - | - | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 5 | 2 ~ 8 | 40 ~ 60 | - | - | 13 ~ 25 | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 5 | 2 ~ 8 | 40 ~ 60 | - | - | - | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 5 | 2 ~ 8 | - | 40.1 ~ 49.9 | 1 ~ 3 | - | - | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 5 | 2 ~ 8 | - | 40.1 ~ 49.9 | 1 ~ 3 | 13 ~ 25 | - | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 5 | 2 ~ 8 | - | 40.1 ~ 49.9 | 1 ~ 3 | - | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 5 | 2 ~ 8 | - | 40.1 ~ 49.9 | - | 13 ~ 25 | - | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 5 | 2 ~ 8 | - | 40.1 ~ 49.9 | - | 13 ~ 25 | - | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 5 | 2 ~ 8 | - | 40.1 ~ 49.9 | - | 13 ~ 25 | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 5 | 2 ~ 8 | - | 40.1 ~ 49.9 | - | - | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 5 | 2 ~ 8 | - | 40.1 ~ 49.9 | - | 13 ~ 25 | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 5 | 2 ~ 8 | - | 40.1 ~ 49.9 | - | - | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 5 | 2 ~ 8 | - | 50.1 ~ 59.9 | 1 ~ 3 | - | - | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 5 | 2 ~ 8 | - | 50.1 ~ 59.9 | 1 ~ 3 | 13 ~ 25 | - | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 5 | 2 ~ 8 | - | 50.1 ~ 59.9 | 1 ~ 3 | - | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 5 | 2 ~ 8 | - | 50.1 ~ 59.9 | - | 13 ~ 25 | - | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 5 | 2 ~ 8 | - | 50.1 ~ 59.9 | - | 13 ~ 25 | - | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 5 | 2 ~ 8 | - | 50.1 ~ 59.9 | - | 13 ~ 25 | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 5 | 2 ~ 8 | - | 50.1 ~ 59.9 | - | - | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 5 | 2 ~ 8 | - | 50.1 ~ 59.9 | - | 13 ~ 25 | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 5 | 2 ~ 8 | - | 50.1 ~ 59.9 | - | - | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 5 | 2 ~ 8 | - | - | 1 ~ 3 | - | - | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 5 | 2 ~ 8 | - | - | 1 ~ 3 | 13 ~ 25 | - | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 5 | 2 ~ 8 | - | - | 1 ~ 3 | - | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 5 | 2 ~ 8 | - | - | 1 ~ 3 | 13 ~ 25 | - | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 5 | 2 ~ 8 | - | - | 1 ~ 3 | 13 ~ 25 | - | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 5 | 2 ~ 8 | - | - | 1 ~ 3 | 13 ~ 25 | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 5 | 2 ~ 8 | - | - | 1 ~ 3 | - | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 5 | 2 ~ 8 | - | - | 1 ~ 3 | 13 ~ 25 | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 5 | 2 ~ 8 | - | - | 1 ~ 3 | - | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 6 | 2 ~ 13 | - | 40.1 ~ 49.9 | - | 13 ~ 25 | - | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 6 | 2 ~ 13 | - | 40.1 ~ 49.9 | - | - | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 6 | 2 ~ 13 | - | 50.1 ~ 69.9 | - | 13 ~ 25 | - | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 6 | 2 ~ 13 | - | 50.1 ~ 69.9 | - | - | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 6 | 2 ~ 13 | - | - | 1.5 ~ 4 | 13 ~ 25 | - | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 6 | 2 ~ 13 | - | - | 1.5 ~ 4 | - | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 8 | 2 ~ 13 | - | - | 2 ~ 6 | 13 ~ 25 | - | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | With | 8 | 2 ~ 13 | - | - | 2 ~ 6 | - | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | SKD11 Equivalent | With | 4 | 2 ~ 6 | - | - | 0.5 ~ 2 | 13 ~ 25 | - | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | SKD11 Equivalent | With | 4 | 2 ~ 6 | - | - | 0.5 ~ 2 | - | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | SKD11 Equivalent | With | 5 | 2 ~ 8 | - | - | 1 ~ 3 | 13 ~ 25 | - | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | SKD11 Equivalent | With | 5 | 2 ~ 8 | - | - | 1 ~ 3 | - | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | SKD11 Equivalent | With | 6 | 2 ~ 13 | - | - | 1.5 ~ 4 | 13 ~ 25 | - | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | SKD11 Equivalent | With | 6 | 2 ~ 13 | - | - | 1.5 ~ 4 | - | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | SKD11 Equivalent | With | 8 | 2 ~ 13 | - | - | 2 ~ 6 | 13 ~ 25 | - | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | SKD11 Equivalent | With | 8 | 2 ~ 13 | - | - | 2 ~ 6 | - | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | W/O | 4 | 2 ~ 6 | 40 ~ 50 | - | 0.5 ~ 2 | 13 ~ 25 | - | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | W/O | 4 | 2 ~ 6 | 40 ~ 50 | - | 0.5 ~ 2 | - | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | W/O | 4 | 2 ~ 6 | - | 40.1 ~ 49.9 | 0.5 ~ 2 | 13 ~ 25 | - | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | W/O | 4 | 2 ~ 6 | - | 40.1 ~ 49.9 | 0.5 ~ 2 | - | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | W/O | 5 | 2 ~ 8 | 40 ~ 60 | - | 1 ~ 3 | 13 ~ 25 | - | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | W/O | 5 | 2 ~ 8 | 40 ~ 60 | - | 1 ~ 3 | - | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | W/O | 5 | 2 ~ 8 | - | 40.1 ~ 49.9 | 1 ~ 3 | 13 ~ 25 | - | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | W/O | 5 | 2 ~ 8 | - | 40.1 ~ 49.9 | 1 ~ 3 | - | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | W/O | 5 | 2 ~ 8 | - | 50.1 ~ 59.9 | 1 ~ 3 | 13 ~ 25 | - | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | W/O | 5 | 2 ~ 8 | - | 50.1 ~ 59.9 | 1 ~ 3 | - | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | W/O | 6 | 2 ~ 13 | 40 ~ 70 | - | 1.5 ~ 4 | 13 ~ 25 | - | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | W/O | 6 | 2 ~ 13 | 40 ~ 70 | - | 1.5 ~ 4 | - | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | W/O | 6 | 2 ~ 13 | - | 40.1 ~ 49.9 | 1.5 ~ 4 | 13 ~ 25 | - | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | W/O | 6 | 2 ~ 13 | - | 40.1 ~ 49.9 | 1.5 ~ 4 | - | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | W/O | 6 | 2 ~ 13 | - | 50.1 ~ 69.9 | 1.5 ~ 4 | 13 ~ 25 | - | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | W/O | 6 | 2 ~ 13 | - | 50.1 ~ 69.9 | 1.5 ~ 4 | - | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | W/O | 8 | 2 ~ 13 | 40 ~ 70 | - | 2 ~ 6 | 13 ~ 25 | - | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | W/O | 8 | 2 ~ 13 | 40 ~ 70 | - | 2 ~ 6 | - | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | W/O | 8 | 2 ~ 13 | - | 40.1 ~ 49.9 | 2 ~ 6 | 13 ~ 25 | - | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | W/O | 8 | 2 ~ 13 | - | 40.1 ~ 49.9 | 2 ~ 6 | - | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | W/O | 8 | 2 ~ 13 | - | 50.1 ~ 69.9 | 2 ~ 6 | 13 ~ 25 | - | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | Powdered high-speed steel | W/O | 8 | 2 ~ 13 | - | 50.1 ~ 69.9 | 2 ~ 6 | - | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | SKD11 Equivalent | W/O | 4 | 2 ~ 6 | 40 ~ 50 | - | 0.5 ~ 2 | 13 ~ 25 | - | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | SKD11 Equivalent | W/O | 4 | 2 ~ 6 | 40 ~ 50 | - | 0.5 ~ 2 | - | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | SKD11 Equivalent | W/O | 4 | 2 ~ 6 | - | 40.1 ~ 49.9 | 0.5 ~ 2 | 13 ~ 25 | - | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | SKD11 Equivalent | W/O | 4 | 2 ~ 6 | - | 40.1 ~ 49.9 | 0.5 ~ 2 | - | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | SKD11 Equivalent | W/O | 5 | 2 ~ 8 | 40 ~ 60 | - | 1 ~ 3 | 13 ~ 25 | - | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | SKD11 Equivalent | W/O | 5 | 2 ~ 8 | 40 ~ 60 | - | 1 ~ 3 | - | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | SKD11 Equivalent | W/O | 5 | 2 ~ 8 | - | 40.1 ~ 49.9 | 1 ~ 3 | 13 ~ 25 | - | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | SKD11 Equivalent | W/O | 5 | 2 ~ 8 | - | 40.1 ~ 49.9 | 1 ~ 3 | - | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | SKD11 Equivalent | W/O | 5 | 2 ~ 8 | - | 50.1 ~ 59.9 | 1 ~ 3 | 13 ~ 25 | - | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | SKD11 Equivalent | W/O | 5 | 2 ~ 8 | - | 50.1 ~ 59.9 | 1 ~ 3 | - | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | SKD11 Equivalent | W/O | 6 | 2 ~ 13 | 40 ~ 70 | - | 1.5 ~ 4 | 13 ~ 25 | - | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | SKD11 Equivalent | W/O | 6 | 2 ~ 13 | 40 ~ 70 | - | 1.5 ~ 4 | - | 13.1 ~ 24.9 | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | SKD11 Equivalent | W/O | 6 | 2 ~ 13 | - | 40.1 ~ 49.9 | 1.5 ~ 4 | 13 ~ 25 | - | ||
- | PUNCH | 1 Piece(s) | 7 Day(s) | 10 | SKD11 Equivalent | W/O | 6 | 2 ~ 13 | - | 40.1 ~ 49.9 | 1.5 ~ 4 | - | 13.1 ~ 24.9 |
Loading...
Punches/Button dies | Punches | With/without air hole | W/O | Tip shape | Round |
---|---|---|---|---|---|
Punch shank (mounting part) shape | Flange stopper |
How can we improve?
How can we improve?