(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
กรุณาตรวจสอบรหัสสินค้าที่ถูกต้องก่อนขอราคาและสั่งซื้อ เนื่องจากเป็นสินค้าสั่งทำจึงไม่สามารถเปลี่ยนคืนได้
- หากเลือกความยาวแบบ LC ค่า B จะไม่สามารถอ้างอิงตามตาราง standard ได้
- สอบถามข้อมูลเพิ่มเติม ติดต่อมิซูมิ
Please recheck part number before quoting or ordering products, due to this is made-to-order item and cannot be returned.
If you have any questions, please contact MISUMI.
Part Number |
---|
A-AHB5-[50-80/10] |
A-AHB5-LC[20-79.9/0.1] |
A-AHB6-[50-80/10] |
A-AHB6-LC[20-79.9/0.1] |
A-AHB8-[50-100/10] |
A-AHB8-LC[20-99.9/0.1] |
A-AHB10-[50-100/10] |
A-AHB10-LC[20-99.9/0.1] |
A-AHB13-[50-100/10] |
A-AHB13-LC[20-99.9/0.1] |
A-AHB16-[50-100/10] |
A-AHB16-LC[20-99.9/0.1] |
A-AHB20-[50-100/10] |
A-AHB20-LC[20-99.9/0.1] |
A-AHB25-[50-100/10] |
A-AHB25-LC[20-99.9/0.1] |
AHB5-[50-80/10] |
AHB5-LC[20-79.9/0.1] |
AHB6-[50-80/10] |
AHB6-LC[20-79.9/0.1] |
AHB8-[50-100/10] |
AHB8-LC[20-99.9/0.1] |
AHB10-[50-100/10] |
AHB10-LC[20-99.9/0.1] |
AHB13-[50-100/10] |
AHB13-LC[20-99.9/0.1] |
AHB16-[50-100/10] |
AHB16-LC[20-99.9/0.1] |
AHB20-[50-100/10] |
AHB20-LC[20-99.9/0.1] |
AHB25-[50-100/10] |
AHB25-LC[20-99.9/0.1] |
Part Number | Price | Name | Minimum Order Qty. | Volume Discount | Days to Ship | RoHS | Material | Shank diameter D tolerance | D (Shank diameter) (mm) | L (L dimension) (mm) | LC (Full length alteration) (mm) |
---|---|---|---|---|---|---|---|---|---|---|---|
- | PUNCH BLANK | 1 Piece(s) | 3 Day(s) | 10 | Powdered high-speed steel | +0.005/0 | 5 | 50 ~ 80 | - | ||
- | PUNCH BLANK | 1 Piece(s) | 3 Day(s) | 10 | Powdered high-speed steel | +0.005/0 | 5 | - | 20 ~ 79.9 | ||
- | PUNCH BLANK | 1 Piece(s) | 3 Day(s) | 10 | Powdered high-speed steel | +0.005/0 | 6 | 50 ~ 80 | - | ||
- | PUNCH BLANK | 1 Piece(s) | 3 Day(s) | 10 | Powdered high-speed steel | +0.005/0 | 6 | - | 20 ~ 79.9 | ||
- | PUNCH BLANK | 1 Piece(s) | 3 Day(s) | 10 | Powdered high-speed steel | +0.005/0 | 8 | 50 ~ 100 | - | ||
- | PUNCH BLANK | 1 Piece(s) | 3 Day(s) | 10 | Powdered high-speed steel | +0.005/0 | 8 | - | 20 ~ 99.9 | ||
- | PUNCH BLANK | 1 Piece(s) | 3 Day(s) | 10 | Powdered high-speed steel | +0.005/0 | 10 | 50 ~ 100 | - | ||
- | PUNCH BLANK | 1 Piece(s) | 3 Day(s) | 10 | Powdered high-speed steel | +0.005/0 | 10 | - | 20 ~ 99.9 | ||
- | PUNCH BLANK | 1 Piece(s) | 3 Day(s) | 10 | Powdered high-speed steel | +0.005/0 | 13 | 50 ~ 100 | - | ||
- | PUNCH BLANK | 1 Piece(s) | 3 Day(s) | 10 | Powdered high-speed steel | +0.005/0 | 13 | - | 20 ~ 99.9 | ||
- | PUNCH BLANK | 1 Piece(s) | 3 Day(s) | 10 | Powdered high-speed steel | +0.005/0 | 16 | 50 ~ 100 | - | ||
- | PUNCH BLANK | 1 Piece(s) | 3 Day(s) | 10 | Powdered high-speed steel | +0.005/0 | 16 | - | 20 ~ 99.9 | ||
- | PUNCH BLANK | 1 Piece(s) | 3 Day(s) | 10 | Powdered high-speed steel | +0.005/0 | 20 | 50 ~ 100 | - | ||
- | PUNCH BLANK | 1 Piece(s) | 3 Day(s) | 10 | Powdered high-speed steel | +0.005/0 | 20 | - | 20 ~ 99.9 | ||
- | PUNCH BLANK | 1 Piece(s) | 3 Day(s) | 10 | Powdered high-speed steel | +0.005/0 | 25 | 50 ~ 100 | - | ||
- | PUNCH BLANK | 1 Piece(s) | 3 Day(s) | 10 | Powdered high-speed steel | +0.005/0 | 25 | - | 20 ~ 99.9 | ||
- | PUNCH | 1 Piece(s) | 2 Day(s) | 10 | Powdered high-speed steel | m5 | 5 | 50 ~ 80 | - | ||
- | PUNCH | 1 Piece(s) | 2 Day(s) | 10 | Powdered high-speed steel | m5 | 5 | - | 20 ~ 79.9 | ||
- | PUNCH | 1 Piece(s) | 2 Day(s) | 10 | Powdered high-speed steel | m5 | 6 | 50 ~ 80 | - | ||
- | PUNCH | 1 Piece(s) | 2 Day(s) | 10 | Powdered high-speed steel | m5 | 6 | - | 20 ~ 79.9 | ||
- | PUNCH | 1 Piece(s) | 3 Day(s) | 10 | Powdered high-speed steel | m5 | 8 | 50 ~ 100 | - | ||
- | PUNCH | 1 Piece(s) | 3 Day(s) | 10 | Powdered high-speed steel | m5 | 8 | - | 20 ~ 99.9 | ||
- | PUNCH | 1 Piece(s) | 3 Day(s) | 10 | Powdered high-speed steel | m5 | 10 | 50 ~ 100 | - | ||
- | PUNCH | 1 Piece(s) | 3 Day(s) | 10 | Powdered high-speed steel | m5 | 10 | - | 20 ~ 99.9 | ||
- | PUNCH | 1 Piece(s) | 3 Day(s) | 10 | Powdered high-speed steel | m5 | 13 | 50 ~ 100 | - | ||
- | PUNCH | 1 Piece(s) | 3 Day(s) | 10 | Powdered high-speed steel | m5 | 13 | - | 20 ~ 99.9 | ||
- | PUNCH | 1 Piece(s) | 3 Day(s) | 10 | Powdered high-speed steel | m5 | 16 | 50 ~ 100 | - | ||
- | PUNCH | 1 Piece(s) | 3 Day(s) | 10 | Powdered high-speed steel | m5 | 16 | - | 20 ~ 99.9 | ||
- | PUNCH | 1 Piece(s) | 3 Day(s) | 10 | Powdered high-speed steel | m5 | 20 | 50 ~ 100 | - | ||
- | PUNCH | 1 Piece(s) | 3 Day(s) | 10 | Powdered high-speed steel | m5 | 20 | - | 20 ~ 99.9 | ||
- | PUNCH | 1 Piece(s) | 3 Day(s) | 10 | Powdered high-speed steel | m5 | 25 | 50 ~ 100 | - | ||
- | PUNCH | 1 Piece(s) | 3 Day(s) | 10 | Powdered high-speed steel | m5 | 25 | - | 20 ~ 99.9 |
Loading...
Heavy-load punches | Yes | Shank type | Blank | Jector | None |
---|---|---|---|---|---|
Surface treatment | None | Shank (mounting part) shape | Standard | T (Head thickness/plate thickness)(mm) | 8 |
How can we improve?
How can we improve?