(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
Structural element of factory automation equipment. [Materials]·Steel, stainless steel, black
Part Number |
---|
APBS-04-10 |
Part Number | Price | Name | Minimum Order Qty. | Volume Discount | Days to Ship | RoHS | Thread Dia. (mm) | Thread Length (mm) | Material | Surface Treatment | Qty. | Color | Strength Class | Details of Material |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
฿ 12.04 | NIQ BOLT FOR ALMINUM FLAME | 1 Piece(s) | 3 Day(s) | 10 | 4 | 10 | Stainless Steel | No | 1 pc. | - | A2-50 | SUS XM7 |
Loading...
Type | Washer Included |
---|
Please check the type/dimensions/specifications of the part APBS-04-10 in the Upset Bolt series.
Part Number |
---|
APB-04-10-BK |
APB-04-10-BK-P50 |
APB-04-10-P50 |
APBS-04-10-P50 |
APBS-04-12 |
APBS-04-12-P50 |
Part Number | Price | Minimum Order Qty | Number of pc(s). included in pkg. | Volume Discount | Days to Ship | RoHS | Thread Dia. (mm) | Thread Length (mm) | Material | Surface Treatment | Qty. | Color | Strength Class | Details of Material |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
฿ 10.22 | 1 Piece(s) | 3 Day(s) | 10 | 4 | 10 | Iron | Trivalent Chromate (Black) | 1 pc. | Black | 4.8 Equivalent | SWCH | |||
฿ 338.04 | 1 Pack(s) | 50 Pieces Per Package | 3 Day(s) | 10 | 4 | 10 | Iron | Trivalent Chromate (Black) | 50 pcs. | Black | 4.8 Equivalent | SWCH | ||
฿ 248.70 | 1 Pack(s) | 50 Pieces Per Package | 3 Day(s) | 10 | 4 | 10 | Iron | Trivalent Chromate | 50 pcs. | Silver | 4.8 Equivalent | SWCH | ||
฿ 402.91 | 1 Pack(s) | 50 Pieces Per Package | 3 Day(s) | 10 | 4 | 10 | Stainless Steel | No | 50 pcs. | - | A2-50 | SUS XM7 | ||
฿ 12.04 | 1 Piece(s) | 3 Day(s) | 10 | 4 | 12 | Stainless Steel | No | 1 pc. | - | A2-50 | SUS XM7 | |||
฿ 403.69 | 1 Pack(s) | 50 Pieces Per Package | 6 Day(s) | 10 | 4 | 12 | Stainless Steel | No | 50 pcs. | - | A2-50 | SUS XM7 |
How can we improve?
How can we improve?