(!) Since support from Microsoft will end on January 14 2020, Windows 7 user might not be able to use MISUMI website effectively. Please consider to update your system as ‘MISUMI Website system requirement’.
Select part number to Order Now/ Add to Cart
A thrust ball bearing with a contact angle of 90° normally, with a ball between a set of track discs (axial load disc and housing race disc).
[Features]
·Unidirectional axial load can be applied.
·Note that radial loads cannot be applied.
·Not suitable for high speed rotation.
[Application]
·Ideal for steel equipment, pumps, machine tools, wind power generation, etc.
Part Number |
---|
51122 |
51124 |
51126 |
51128 |
51130 |
51132 |
51134 |
51136 |
51138 |
51140 |
51148 |
51152 |
51156 |
51160 |
51168 |
51176 |
51180 |
51222 |
51226 |
51228 |
51230 |
51232 |
51234 |
51236 |
51238 |
51240 |
51244 |
51248 |
51252 |
51304 |
51320L1 |
51324 |
51326 |
51328 |
51330 |
51334 |
51338 |
Part Number | Price | Name | Minimum Order Qty. | Volume Discount | Days to Ship | RoHS | Precision (JIS) | Inner Dia. d (Ø) | Outer Dia. D (Ø) | Width B (mm) | Basic Dynamic Load Rating (N) | Max. Allowable Rotational Speed (rpm) | Retainer Type | Accuracy Symbol | Holder Symbol |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
฿ 2,948.33 ฿ 1,963.00 | NTN THRUST BALL BEARINGS | 1 Piece(s) | Same day | - | Grade 0 | 110 | 145 | 25 | 87000 | 1600 | Punching | - | - | ||
฿ 3,221.67 | NTN | 1 Piece(s) | 2 Day(s) | 10 | Grade 0 | 120 | 155 | 25 | 89000 | 1500 | Punching | - | - | ||
฿ 5,580.19 | BALL BEARING | 1 Piece(s) | 7 Day(s) | 10 | Grade 0 | 130 | 170 | 30 | 104000 | 1300 | Punching | - | - | ||
฿ 6,428.37 | NTN | 1 Piece(s) | 7 Day(s) | - | Grade 0 | 140 | 180 | 31 | 107000 | 1300 | Punching | - | - | ||
฿ 9,087.81 | NTN | 1 Piece(s) | 6 Day(s) | 10 | Grade 0 | 150 | 190 | 31 | 109000 | 1200 | Punching | - | - | ||
฿ 12,179.16 | NTN | 1 Piece(s) | 7 Day(s) | 10 | Grade 0 | 160 | 200 | 31 | 112000 | 1200 | Punching | - | - | ||
฿ 12,785.08 | LARGE BEARINGS | 1 Piece(s) | 6 Day(s) | - | Grade 0 | 170 | 215 | 34 | 134260 | 1100 | Punching | - | - | ||
฿ 14,162.30 | NTN | 1 Piece(s) | 6 Day(s) | 10 | Grade 0 | 180 | 225 | 34 | 135000 | 1100 | Punching | - | - | ||
฿ 25,683.33 | LARGE BEARINGS | 1 Piece(s) | 60 Day(s) | 10 | Grade 0 | 190 | 240 | 37 | 170000 | 980 | Punching | - | - | ||
฿ 28,316.66 | NTN | 1 Piece(s) | Quote | 10 | Grade 0 | 200 | 250 | 37 | 172000 | 960 | Punching | - | - | ||
฿ 26,179.78 ฿ 15,710.49 | NTN LARGE BEARINGS | 1 Piece(s) | Same day | 10 | Grade 0 | 240 | 300 | 45 | 228000 | 780 | Punching | - | - | ||
฿ 35,467.00 | LARGE BEARINGS | 1 Piece(s) | 6 Day(s) | 10 | Grade 0 | 320 | 360 | 45 | 232000 | 750 | Punching | - | - | ||
฿ 45,132.49 | LARGE BEARINGS | 1 Piece(s) | 6 Day(s) | 10 | Grade 0 | 280 | 350 | 53 | 305000 | 650 | Momi removing | - | - | ||
฿ 100.00 | LARGE BEARINGS | 1 Piece(s) | Quote | 10 | Grade 0 | 300 | 380 | 62 | 355000 | 580 | Momi removing | - | - | ||
฿ 100,894.80 | NTN | 1 Piece(s) | 6 Day(s) | 10 | Grade 0 | 340 | 420 | 64 | 375000 | 530 | Momi removing | - | - | ||
฿ 100.00 | LARGE BEARINGS | 1 Piece(s) | Quote | 10 | Grade 0 | 380 | 460 | 65 | 380000 | 500 | Momi removing | - | - | ||
฿ 100.00 | LARGE BEARINGS | 1 Piece(s) | Quote | - | Grade 0 | 400 | 480 | 65 | 390000 | 480 | Momi removing | - | - | ||
฿ 3,266.67 | NTN | 1 Piece(s) | 2 Day(s) | - | Grade 0 | 110 | 160 | 38 | 153000 | 1200 | Punching | - | - | ||
฿ 7,976.19 | NTN | 1 Piece(s) | 6 Day(s) | 10 | Grade 0 | 130 | 190 | 45 | 191000 | 1000 | Momi removing | - | - | ||
฿ 9,249.43 | LARGE BEARINGS | 1 Piece(s) | 8 Day(s) | - | Grade 0 | 140 | 200 | 46 | 193000 | 980 | Momi removing | - | - | ||
฿ 13,857.27 | LARGE BEARINGS | 1 Piece(s) | 8 Day(s) | - | Grade 0 | 150 | 215 | 50 | 227000 | 900 | Momi removing | - | - | ||
฿ 15,925.35 | LARGE BEARINGS | 1 Piece(s) | 8 Day(s) | 10 | Grade 0 | 160 | 225 | 51 | 223000 | 870 | Momi removing | - | - | ||
฿ 25,983.33 | LARGE BEARINGS | 1 Piece(s) | 60 Day(s) | 10 | Grade 0 | 170 | 240 | 55 | 261000 | 810 | Momi removing | - | - | ||
฿ 100.00 | LARGE BEARINGS | 1 Piece(s) | Quote | 10 | Grade 0 | 180 | 250 | 56 | 266000 | 780 | Momi removing | - | - | ||
฿ 25,177.30 | LARGE BEARINGS | 1 Piece(s) | 6 Day(s) | 10 | Grade 0 | 190 | 270 | 62 | 310000 | 710 | Momi removing | - | - | ||
฿ 100.00 | NTN | 1 Piece(s) | Quote | 10 | Grade 0 | 200 | 280 | 62 | 315000 | 700 | Momi removing | - | - | ||
฿ 36,283.33 | LARGE BEARINGS | 1 Piece(s) | Quote | 10 | Grade 0 | 220 | 300 | 63 | 325000 | 660 | Momi removing | - | - | ||
฿ 100.00 | LARGE BEARINGS | 1 Piece(s) | Quote | 10 | Grade 0 | 240 | 340 | 78 | 415000 | 550 | Momi removing | - | - | ||
฿ 100.00 | LARGE BEARINGS | 1 Piece(s) | Quote | 10 | Grade 0 | 260 | 360 | 79 | 440000 | 530 | Momi removing | - | - | ||
฿ 100.00 | LARGE BEARINGS | 1 Piece(s) | Quote | - | Grade 0 | - | - | - | - | - | - | - | - | ||
฿ 100.00 | THRUST BALL BEARINGS | 1 Piece(s) | Quote | 10 | Grade 0 | 100 | 170 | 55 | 237000 | 990 | Momi removing | - | L1 | ||
฿ 100.00 | LARGE BEARINGS | 1 Piece(s) | Quote | 10 | Grade 0 | 120 | 210 | 70 | 296000 | 780 | Momi removing | - | - | ||
฿ 100.00 | LARGE BEARINGS | 1 Piece(s) | Quote | 10 | Grade 0 | 130 | 225 | 75 | 330000 | 720 | Momi removing | - | - | ||
฿ 100.00 | LARGE BEARINGS | 1 Piece(s) | Quote | 10 | Grade 0 | 140 | 240 | 80 | 350000 | 670 | Momi removing | - | - | ||
฿ 100.00 | LARGE BEARINGS | 1 Piece(s) | Quote | - | Grade 0 | 150 | 250 | 80 | 360000 | 660 | Momi removing | - | - | ||
฿ 100.00 | LARGE BEARINGS | 1 Piece(s) | Quote | 10 | Grade 0 | 170 | 280 | 87 | 465000 | 590 | Momi removing | - | - | ||
฿ 100.00 | LARGE BEARINGS | 1 Piece(s) | Quote | 10 | Grade 0 | 190 | 320 | 105 | 545000 | 500 | Momi removing | - | - |
Loading...
Raceway Ring Shape | Thrust Ball | Inner/Outer Ring Material | Steel | Bearing Type | Open Type |
---|---|---|---|---|---|
Outer Ring Type | Flat | Specifications/Environment | Standard | Load Direction | Thrust |
Number of Raceway Ring Rows | Single Row | Size Standards | Metric System | Rolling Element Material | Steel |
How can we improve?
How can we improve?